# Silver Mining News in Colorado

Canonical page: https://atlas-extractions.minestarters.com/news?commodities=silver&regions=usa_co

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 12
Returned: 10
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: Colorado (usa_co)
Commodity: Silver (silver)
Applied filters: {"regions":["usa_co"],"commodities":["silver"],"commodity_scope":"primary","document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10


[Next page](https://atlas-extractions.minestarters.com/news.md?commodities=silver&regions=usa_co&page=2&page_size=10)

## Viscount Reports 7.9 metres (26 ft) Grading 473.2 g/t Silver and 2.92 g/t Gold at Silver Cliff; Step-Out Drilling Confirms Silver Mineralization Beyond Current Kate Silver Resource Limits

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/viscount-reports-7-9-metres-26-ft-grading-473-2-g-t-silver-and-2-92-g-t-gold-at--992c9602-2ecd-405d-9ec7-6ea7fd4458c3) · [Markdown](https://atlas-extractions.minestarters.com/news/viscount-reports-7-9-metres-26-ft-grading-473-2-g-t-silver-and-2-92-g-t-gold-at--992c9602-2ecd-405d-9ec7-6ea7fd4458c3.md)
- Original announcement: 2026-09-22T11:45:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Viscount Mining Corp. (VML.V)
- Original source: [orestocks](https://orestocks.com/company/VML.V/press-releases/8293883933212068)
- Atlas sentiment: 0.632
- Atlas tags: Bonanza Intercept, Apparent Width Only, QA/QC Disclosed, Cut-off Disclosed, Step-Out Extension, Deleterious Elements Present

Viscount Mining Corp. announced high-grade silver and gold drill results from its Silver Cliff Project in Colorado, with step-out drilling confirming mineralization beyond the current Kate Silver Resource limits. Hole K26-08 returned a highlight intercept of 7.9 metres grading 473.2 g/t silver and 2.92 g/t gold, including 1.5 metres of 1,030 g/t silver. The company is using a 15 g/t silver cutoff for evaluation, which highlights broader mineralized zones, and plans a follow-up drill program.

## Viscount Completes First Phase of 2026 Silver Cliff Drill Program and Identifies Important Geological Corridor Linking the Kate and Passiflora Areas

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/viscount-completes-first-phase-of-2026-silver-cliff-drill-program-and-identifies--2bac8b7c-f1d8-4acc-b155-37c72742ceba) · [Markdown](https://atlas-extractions.minestarters.com/news/viscount-completes-first-phase-of-2026-silver-cliff-drill-program-and-identifies--2bac8b7c-f1d8-4acc-b155-37c72742ceba.md)
- Original announcement: 2026-06-03T11:45:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Viscount Mining Corp. (VML)
- Original source: [tmx](https://money.tmx.com/en/quote/VML/news/8236429835738781/viscount-completes-first-phase-of-2026-silver-cliff-drill-program-and-identifies)
- Atlas sentiment: 0.195
- Atlas tags: No QA/QC Disclosure, Nearology Play

Viscount Mining Corp. has completed the first phase of its 2026 Silver Cliff drill program in Colorado. The drilling identified a geological corridor linking the Kate and Passiflora areas and observed increasing sulphide intensity, though all results are currently based on visual estimates pending assay confirmation.

## Viscount Mining Announces Mobilization of Rosor Exploration for Silver Cliff Airborne Survey Program

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/viscount-mining-announces-mobilization-of-rosor-exploration-for-silver-cliff-air--8f6f89bd-4880-4ad1-961e-6f42046ae63f) · [Markdown](https://atlas-extractions.minestarters.com/news/viscount-mining-announces-mobilization-of-rosor-exploration-for-silver-cliff-air--8f6f89bd-4880-4ad1-961e-6f42046ae63f.md)
- Original announcement: 2026-05-20T11:45:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Viscount Mining Corp. (VML)
- Original source: [tmx](https://money.tmx.com/en/quote/VML/news/6652885394477882/viscount-mining-announces-mobilization-of-rosor-exploration-for-silver-cliff-air)
- Atlas sentiment: 0.221
- Atlas tags: Nearology Play

Viscount Mining has announced the mobilization of Rosor Exploration for a high-resolution airborne electromagnetic and magnetic survey at the Silver Cliff Project in Colorado. The drone-based program aims to refine drill targets for the Passiflora gold-copper porphyry discovery.

## Viscount Drilling Confirms Targeted Tr2/Tr3 Silver-Host Rhyolites Extend Beyond Kate Resource Boundary at Silver Cliff

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/viscount-drilling-confirms-targeted-tr2-tr3-silver-host-rhyolites-extend-beyond--0a487707-cc66-4b44-b71e-f9480a875e32) · [Markdown](https://atlas-extractions.minestarters.com/news/viscount-drilling-confirms-targeted-tr2-tr3-silver-host-rhyolites-extend-beyond--0a487707-cc66-4b44-b71e-f9480a875e32.md)
- Original announcement: 2026-05-13T11:45:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Viscount Mining Corp. (VML)
- Original source: [tmx](https://money.tmx.com/en/quote/VML/news/4907901944418610/viscount-drilling-confirms-targeted-tr2-tr3-silver-host-rhyolites-extend-beyond-)
- Atlas sentiment: 0.234
- Atlas tags: Step-Out Extension, QA/QC Disclosed, No QA/QC Disclosure

Viscount Mining Corp. has completed three drill holes (K26-02, K26-03, and K26-04) at the Silver Cliff Project in Colorado, successfully intersecting targeted silver-host rhyolite units. The drilling confirms the extension of the mineralized system north and northwest of the existing Kate Resource boundary, with assay results currently pending.

## Viscount Mining Drills Visible Silver-Bearing Mineralization Across First Three Holes at the Kate Resource in Silver Cliff

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/viscount-mining-drills-visible-silver-bearing-mineralization-across-first-three--4e2d990f-ce77-44f3-9d16-b2c9bded3959) · [Markdown](https://atlas-extractions.minestarters.com/news/viscount-mining-drills-visible-silver-bearing-mineralization-across-first-three--4e2d990f-ce77-44f3-9d16-b2c9bded3959.md)
- Original announcement: 2026-05-06T11:45:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Viscount Mining Corp. (VML)
- Original source: [tmx](https://money.tmx.com/en/quote/VML/news/8375530831000892/viscount-mining-drills-visible-silver-bearing-mineralization-across-first-three-)
- Atlas sentiment: 0.134
- Atlas tags: QA/QC Disclosed, QP/CP Signed, Visible Mineralization, Assays Pending, Stale Data Re-release

Viscount Mining has completed the first three holes of its 2026 core drilling program at the Kate Resource in Silver Cliff, Colorado, intersecting visible silver-bearing mineralization. The drilling targets Tr2 and Tr3 rhyolite host units, confirming the geological model and extending the prospective stratigraphy. Assays for the new holes are pending. The company also re-released significant historical high-grade silver intercepts from previous campaigns, with grades up to 3,280 g/t Ag.

## Viscount Mining Engages SLR to Re-Analyze Kate Deposit Resource Amid Strengthening Silver Market

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/viscount-mining-engages-slr-to-re-analyze-kate-deposit-resource-amid-strengtheni--76f6df1c-8d8d-4a7f-8081-5a296e31881f) · [Markdown](https://atlas-extractions.minestarters.com/news/viscount-mining-engages-slr-to-re-analyze-kate-deposit-resource-amid-strengtheni--76f6df1c-8d8d-4a7f-8081-5a296e31881f.md)
- Original announcement: 2026-04-07T11:45:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Viscount Mining Corp. (VML)
- Original source: [tmx](https://money.tmx.com/en/quote/VML/news/5516980330202584/viscount-mining-engages-slr-to-re-analyze-kate-deposit-resource-amid-strengtheni)
- Atlas sentiment: 0.226
- Atlas tags: Resource Update

Viscount Mining has engaged SLR Consulting to re-analyze the existing mineral resource at the Kate Deposit within the Silver Cliff Project in Colorado. The re-evaluation aims to update cut-off grade assumptions in response to strengthening silver prices, potentially increasing the economic profile of the resource.

## Viscount Mining Launches Fully Funded Major 2026 Exploration Program at Silver Cliff Targeting Resource Expansion at the Kate Deposit and Advancement of the Passiflora Gold - Copper Porphyry Discovery

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/viscount-mining-launches-fully-funded-major-2026-exploration-program-at-silver-c--02d10688-4c8a-4acf-a8d1-09fca5a6e8da) · [Markdown](https://atlas-extractions.minestarters.com/news/viscount-mining-launches-fully-funded-major-2026-exploration-program-at-silver-c--02d10688-4c8a-4acf-a8d1-09fca5a6e8da.md)
- Original announcement: 2026-03-31T11:45:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Viscount Mining Corp. (VML)
- Original source: [tmx](https://money.tmx.com/en/quote/VML/news/6694512142159457/viscount-mining-launches-fully-funded-major-2026-exploration-program-at-silver-c)
- Atlas sentiment: 0.347
- Atlas tags: Resource Update

Viscount Mining has launched a fully funded 2026 exploration program targeting the Silver Cliff district in Colorado and the Cherry Creek project in Nevada. The program aims to expand the 24Moz silver resource at the Kate Deposit and further test the gold-copper porphyry system at the Passiflora target.

## Taranis Identifies Borr Zone Using EM, Prepares for Drilling on East Side of Lamprophyre Dyke

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/taranis-identifies-borr-zone-using-em-prepares-for-drilling-on-east-side-of-lamp--0877555e-0824-48eb-bc29-dc1462ce80c2) · [Markdown](https://atlas-extractions.minestarters.com/news/taranis-identifies-borr-zone-using-em-prepares-for-drilling-on-east-side-of-lamp--0877555e-0824-48eb-bc29-dc1462ce80c2.md)
- Original announcement: 2026-02-17T19:00:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Taranis Resources Inc. (TRO)
- Original source: [tmx](https://money.tmx.com/en/quote/TRO/news/7317324857910613/taranis-identifies-borr-zone-using-em-prepares-for-drilling-on-east-side-of-lamp)
- Atlas sentiment: 0.467
- Atlas tags: Step-Out Extension, QA/QC Disclosed, Nearology Play

Taranis Resources has identified the Borr Zone using airborne electromagnetic surveying, suggesting mineralization extends east of a lamprophyre dyke. Recent drilling (Thor-257) confirmed silver and base metal mineralization in the area, supporting the potential for significant down-dip expansion of the Thor epithermal system.

## Viscount Reinforces Silver Expansion Potential at the Kate Deposit with Continuous Silver Corridor

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/viscount-reinforces-silver-expansion-potential-at-the-kate-deposit-with-continuo--ff368460-3f89-4089-9809-1cfdac4eb8b1) · [Markdown](https://atlas-extractions.minestarters.com/news/viscount-reinforces-silver-expansion-potential-at-the-kate-deposit-with-continuo--ff368460-3f89-4089-9809-1cfdac4eb8b1.md)
- Original announcement: 2025-12-11T12:45:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Viscount Mining Corp. (VML)
- Original source: [tmx](https://money.tmx.com/en/quote/VML/news/7902652588500917/viscount-reinforces-silver-expansion-potential-at-the-kate-deposit-with-continuo)
- Atlas sentiment: 0.343
- Atlas tags: Nearology Play

Viscount Mining Corp. has reported results from a 2025 MMI soil-geochemistry program at the Kate Silver Deposit, identifying a continuous north-south silver anomaly. The results suggest expansion potential to the north and northeast, supporting the planning of a 2026 drill program consisting of step-out and infill drilling.

## Taranis Discovers New Area of Epithermal Mineralization at Thor 1.4 km Southeast of Thor Epithermal Deposit

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/taranis-discovers-new-area-of-epithermal-mineralization-at-thor-1-4-km-southeast--9b63f399-65fa-4063-8972-11cc72db33d6) · [Markdown](https://atlas-extractions.minestarters.com/news/taranis-discovers-new-area-of-epithermal-mineralization-at-thor-1-4-km-southeast--9b63f399-65fa-4063-8972-11cc72db33d6.md)
- Original announcement: 2025-10-27T20:05:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Taranis Resources Inc. (TRO)
- Original source: [tmx](https://money.tmx.com/en/quote/TRO/news/7708451828994427/taranis-discovers-new-area-of-epithermal-mineralization-at-thor-1-4-km-southeast)
- Atlas sentiment: 0.475
- Atlas tags: Step-Out Extension, QA/QC Disclosed, Nearology Play

Taranis Resources has announced a new near-surface epithermal discovery named 'Borr', located 1.4 km southeast of its existing Thor deposit. Drill hole Thor-256 intersected silver, lead, and zinc mineralization, suggesting significant expansion potential for the current Mineral Resource.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used. Requires an actual metal equivalent grade; a combined elemental basket such as PGE is not a metal equivalent.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **Deleterious Elements Present:** A source-stated penalty, refractory or recovery concern in the fact's scope. Element detection alone, including measured elements explicitly below penalty thresholds, does not trigger this tag. Respect negation and retain a separately stated concern even when another risk is explicitly absent.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** M&I share below the weak bound — very early stage, no engineering confidence.
- **Tonnage Growth:** Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Grade Decline:** Average grade fell below the red-flag bound vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade reduced beyond the suspicious bound vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component. No prior estimate exists, so every change band is not applicable.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
- **DFS Bankable:** AACE Class 2-1 study complete and within the staleness window.
- **PFS Complete:** AACE Class 3 study complete.
- **PEA Only:** Only Class 4 / Initial Assessment economics available. Not bankable.
- **No Study:** No formal economic study — no engineering basis for the economics quoted.
- **Stale Study:** Beyond the staleness window measured from the estimate base date.
- **Inferred Heavy Feed:** Material Inferred share of LOM mill feed, or the share is undisclosed.
- **Resource Governance Undisclosed:** No QA/QC, top-cut methodology or QP independence disclosed. Caps study quality at the moderate tier.
- **NPV Cut vs Prior Study:** A restated study reduces NPV materially against its own predecessor on the same asset.
- **High IRR:** Post-tax real unlevered IRR in the strong tier or better.
- **Low IRR:** IRR below the moderate tier.
- **Below Jurisdiction Hurdle:** IRR below the greenfield or brownfield hurdle for its jurisdiction tier.
- **IRR Basis Undisclosed:** Real vs nominal not stated, so the tier is not comparable across studies.
- **Undervalued PNAV:** Funding-adjusted P/NAV in the strong tier or better.
- **Overvalued PNAV:** Funding-adjusted P/NAV in the red-flag tier.
- **Fast Payback:** Payback in the strong tier or better, on the required basis.
- **Slow Payback:** Payback in the weak tier or worse.
- **Bottom Quartile Cost:** P0-25 of the relevant commodity cost curve.
- **Top Quartile Cost:** P75-100 of the relevant commodity cost curve — first to cut in a downturn.
- **Cost Basis Undisclosed:** By-product vs co-product not stated, so quartile placement is unreliable.
- **Low Capital Intensity:** Below the benchmark for its project type.
- **High Capital Intensity:** Above the benchmark for its project type.
- **Conservative Pricing:** Conservative on the worst of the spot, 3-year and consensus comparisons.
- **Aggressive Pricing:** The study only works on a stretched price deck.
- **No Price Sensitivity:** No price sensitivity disclosed — treated as a deliberate signal, not a neutral gap.
- **No Discount Rate Sensitivity:** Blocks NPV normalisation to the common rate without reconstruction.
- **Price Deck Unstructured:** Prices given only as free text, so conservatism cannot be scored.
- **Long Reserve Life:** Reserve life index in the top tier of the single ladder.
- **Short Reserve Life:** Reserve life index in the critical tier.
- **Resource Life Upside:** Wide gap between reserve life and resource life — conversion upside rather than discovery dependence.
- **Fully Funded:** Funding coverage at or above 1.0x counting committed facilities only.
- **Material Funding Gap:** Funding coverage below the substantially-funded band.
- **Funding Gap Exceeds Market Cap:** Red flag regardless of headline NPV — the upside is not reachable by the current equity holder.
- **Encumbered by Stream:** An existing stream or royalty reduces attributable NAV and restricts future financing.
- **Stability Agreement:** Fiscal terms fixed, with a term covering the mine life.
- **High Government Take:** Total government take above the regional norm as a share of pre-tax cash flow.
- **Fully Permitted:** Key permits granted with no unresolved challenge.
- **Permit Challenge Outstanding:** An appeal or legal challenge is unresolved, which can defer first production indefinitely.
- **No Community Agreement:** Permits held but no IBA or benefit agreement — the start date is unsupported.
- **Closure Underprovisioned:** Closure provision materially below peers, unfunded, or undisclosed.
- **Upstream TSF:** Upstream tailings construction, which is banned in Brazil and Ecuador.
