# Silver Mining News in Nevada

Canonical page: https://atlas-extractions.minestarters.com/news?commodities=silver&regions=usa_nv

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 70
Returned: 10
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: Nevada (usa_nv)
Commodity: Silver (silver)
Applied filters: {"regions":["usa_nv"],"commodities":["silver"],"commodity_scope":"primary","document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10


[Next page](https://atlas-extractions.minestarters.com/news.md?commodities=silver&regions=usa_nv&page=2&page_size=10)

## Blackrock Silver Extends Silver and Gold to Northwest at Tonopah West

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/blackrock-silver-extends-silver-and-gold-to-northwest-at-tonopah-west--9115427f-fb68-4220-92c2-9cec74622250) · [Markdown](https://atlas-extractions.minestarters.com/news/blackrock-silver-extends-silver-and-gold-to-northwest-at-tonopah-west--9115427f-fb68-4220-92c2-9cec74622250.md)
- Original announcement: 2026-09-23T10:00:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Blackrock Silver Corp. (BRC)
- Original source: [tmx](https://money.tmx.com/en/quote/BRC/news/6747015040513127/blackrock-silver-extends-silver-and-gold-to-northwest-at-tonopah-west)
- Atlas sentiment: 0.632
- Atlas tags: Step-Out Extension, Bonanza Intercept, Bonanza Intercept, Bonanza Intercept, True Width Disclosed, QA/QC Disclosed, QP/CP Signed, Compositing Transparent, Deleterious Elements Present

Blackrock Silver has announced drill results from its Tonopah West project in Nevada, extending silver and gold mineralization by 600 metres to the northwest. The program includes high-grade intercepts, with several holes returning bonanza silver equivalent grades. The company also identified a new intrusive complex as a priority exploration target, and the drilling has expanded the resource area in the DPB South zone.

## Blackrock Silver Extends Silver and Gold to Northwest at Tonopah West

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/blackrock-silver-extends-silver-and-gold-to-northwest-at-tonopah-west--6786a2ca-9ef8-4740-bbaf-325b4b27295d) · [Markdown](https://atlas-extractions.minestarters.com/news/blackrock-silver-extends-silver-and-gold-to-northwest-at-tonopah-west--6786a2ca-9ef8-4740-bbaf-325b4b27295d.md)
- Original announcement: 2026-09-23T09:00:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Blackrock Silver Corp. (BRC)
- Original source: [investingnews](https://investingnews.com/blackrock-silver-extends-silver-and-gold-to-northwest-at-tonopah-west/)
- Atlas sentiment: 0.542
- Atlas tags: None

Blackrock Silver Corp. reported high-grade silver and gold drill results from its Tonopah West project in Nevada, extending mineralization 600 meters to the northwest and identifying a new intrusive complex target. The drilling included several bonanza-grade intercepts, significantly expanding the known mineralized footprint. The company noted challenges in the Eastern Expansion Program due to fault-bounded mineralization, but overall, the results point to substantial growth potential with further drilling planned.

## Silver47 Achieves 80% Silver and 77% Gold Extraction from Belmont Tailings at the Hughes Project, Nevada

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/silver47-achieves-80-silver-and-77-gold-extraction-from-belmont-tailings-at-the--90921576-cf60-4fbe-b2fb-eb603d736b5d) · [Markdown](https://atlas-extractions.minestarters.com/news/silver47-achieves-80-silver-and-77-gold-extraction-from-belmont-tailings-at-the--90921576-cf60-4fbe-b2fb-eb603d736b5d.md)
- Original announcement: 2026-09-21T11:00:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Silver47 Exploration Corp (AGA.V)
- Original source: [orestocks](https://orestocks.com/company/AGA.V/press-releases/5143539778915113)
- Atlas sentiment: 0.487
- Atlas tags: Mill Route, Free Milling, Inferred Resource, Heap Leach Route, Multi-Domain Tested

Silver47 has reported successful metallurgical testing on the Belmont tailings at the Hughes Project in Nevada, achieving 80% silver and 77% gold extraction via agitated cyanide leach at a 53 µm grind. While heap leach testing was unsuccessful due to permeability issues, the results support further evaluation of a mill-based processing route for the 2.74 Moz AgEq inferred resource.

## Silver One Intersects 472 g/t Silver, 0.6 g/t Gold, plus 0.87% Lead - 1.10% Zinc, Extending Down-Dip Mineralization 400 Metres Beyond Open-Pit Resource

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/silver-one-intersects-472-g-t-silver-0-6-g-t-gold-plus-0-87-lead-1-10-zinc-exten--479baefc-aecc-4e7c-ae4f-852e6511c38b) · [Markdown](https://atlas-extractions.minestarters.com/news/silver-one-intersects-472-g-t-silver-0-6-g-t-gold-plus-0-87-lead-1-10-zinc-exten--479baefc-aecc-4e7c-ae4f-852e6511c38b.md)
- Original announcement: 2026-09-17T04:15:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Silver One Resources Inc. (SVE)
- Original source: [newsfile](https://www.newsfilecorp.com/release/314700/Silver-One-Intersects-472-gt-Silver-0.6-gt-Gold-plus-0.87-Lead-1.10-Zinc-Extending-DownDip-Mineralization-400-Metres-Beyond-OpenPit-Resource)
- Atlas sentiment: 0.842
- Atlas tags: Bonanza Intercept, Step-Out Extension, True Width Disclosed, QA/QC Disclosed, Heap Leach Route, Mill Route, Single Domain Only

Silver One Resources reported high-grade polymetallic drill results from its Candelaria Project in Nevada, including 9.14 m at 472 g/t silver, 0.6 g/t gold, 0.87% lead, and 1.10% zinc. These initial results from the 2026 campaign extended mineralization 400 meters down-dip, confirming continuity and scale. Historical metallurgical tests from 2023 showed good recoveries for sulphides via flotation and cyanidation.

## America’s top mining jurisdiction is still ripe for discovery

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/america-s-top-mining-jurisdiction-is-still-ripe-for-discovery--b01e705c-af77-49f8-bb27-9ed6884a0c35) · [Markdown](https://atlas-extractions.minestarters.com/news/america-s-top-mining-jurisdiction-is-still-ripe-for-discovery--b01e705c-af77-49f8-bb27-9ed6884a0c35.md)
- Original announcement: 2026-09-16T20:00:19.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Sun Silver (SS1)
- Original source: [stockhead](https://stockhead.com.au/resources/americas-top-mining-jurisdiction-is-still-ripe-for-discovery/)
- Atlas sentiment: 0.686
- Atlas tags: Tonnage Growth, Resource Update

Sun Silver has significantly expanded its Maverick Springs project resource to 539 million ounces of silver equivalent. The deposit remains open in all directions with high-grade intercepts noted on the current resource boundary.

## Blackrock Silver Announces Inclusion into the GDXJ

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/blackrock-silver-announces-inclusion-into-the-gdxj--8a07b7bd-7499-4b55-bab6-3846d789f517) · [Markdown](https://atlas-extractions.minestarters.com/news/blackrock-silver-announces-inclusion-into-the-gdxj--8a07b7bd-7499-4b55-bab6-3846d789f517.md)
- Original announcement: 2026-09-15T10:00:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Blackrock Silver Corp. (BRC)
- Original source: [investingnews](https://investingnews.com/blackrock-silver-announces-inclusion-into-the-gdxj/)
- Atlas sentiment: 0.378
- Atlas tags: Maiden Resource, Inferred Resource

Blackrock Silver Corp. has announced its inclusion into the VanEck Junior Gold Miners ETF (GDXJ), effective September 18, 2026. The company aims to leverage this increased profile to support the development of its Tonopah West silver project in Nevada.

## Millennium Silver Mobilizes Drone Magnetic Survey at Silver Peak, Nevada

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/millennium-silver-mobilizes-drone-magnetic-survey-at-silver-peak-nevada--6de44019-8230-4478-93f2-376ae491a83c) · [Markdown](https://atlas-extractions.minestarters.com/news/millennium-silver-mobilizes-drone-magnetic-survey-at-silver-peak-nevada--6de44019-8230-4478-93f2-376ae491a83c.md)
- Original announcement: 2026-09-14T21:07:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Millennium Silver Corp. (MSC)
- Original source: [orestocks](https://orestocks.com/company/MSC.V/press-releases/6451734116657683)
- Atlas sentiment: 0.226
- Atlas tags: Inferred Resource

Millennium Silver has mobilized a drone magnetic survey at its Silver Peak project in Nevada to map structures and support target generation for an upcoming 2026 drill program. The survey aims to explore the Nivloc Structure, which currently hosts an Inferred Mineral Resource.

## Vortex and Brimstone Continue to Expand With Higher Grades

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/vortex-and-brimstone-continue-to-expand-with-higher-grades--adb0df06-8916-4178-a4cf-8d10a415d3cd) · [Markdown](https://atlas-extractions.minestarters.com/news/vortex-and-brimstone-continue-to-expand-with-higher-grades--adb0df06-8916-4178-a4cf-8d10a415d3cd.md)
- Original announcement: 2026-09-11T23:58:40.185Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Hycroft Mining Holding Corporation (HYMC)
- Original source: [prnewswire](https://www.prnewswire.com/news-releases/vortex-and-brimstone-continue-to-expand-with-higher-grades-302874271.html)
- Atlas sentiment: 0.824
- Atlas tags: Bonanza Intercept, Step-Out Extension, QA/QC Disclosed, Metal Equivalent Opaque, No QA/QC Disclosure

Hycroft Mining Holding Corporation announced exceptional drill results from its 2025-2026 Exploration Drill Program at the Hycroft Mine in Nevada. The program successfully extended high-grade silver and gold mineralization in both the Vortex and Brimstone systems, with intercepts including 5.5 meters at 4,074 g/t silver and 1.8 meters at 43.00 g/t gold. The company noted the discovery of a new high-grade gold interval and confirmed that the mineralization remains open in all directions, supporting the potential for a high-grade underground mine.

## Millennium Silver Receives BLM Acceptance of Exploration Notice and Posts Reclamation Bond at Silver Peak, Nevada

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/millennium-silver-receives-blm-acceptance-of-exploration-notice-and-posts-reclam--2fd2cae8-fd63-4a8d-9622-a29f0e0f014b) · [Markdown](https://atlas-extractions.minestarters.com/news/millennium-silver-receives-blm-acceptance-of-exploration-notice-and-posts-reclam--2fd2cae8-fd63-4a8d-9622-a29f0e0f014b.md)
- Original announcement: 2026-09-10T00:22:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Millennium Silver Corp. (MSC)
- Original source: [tmx](https://money.tmx.com/en/quote/MSC/news/4526283209290576/millennium-silver-receives-blm-acceptance-of-exploration-notice-and-posts-reclam)
- Atlas sentiment: 0.417
- Atlas tags: Permitting Milestone, Inferred Resource, Stale Estimate, Resource Update

Millennium Silver Corp. has received BLM acceptance for its Exploration Notice and posted a reclamation bond for the Silver Peak project in Nevada. This authorization enables a diamond drilling program intended to infill and extend the Nivloc Structure and support an updated Mineral Resource Estimate.

## Americore Confirms High-Grade Silver in Historic Trinity Core, Including 509 g/t Silver

- Atlas analysis: [Read analysis](https://atlas-extractions.minestarters.com/news/americore-confirms-high-grade-silver-in-historic-trinity-core-including-509-g-t--1376a145-a3ce-4ebe-af34-e48972ee5c47) · [Markdown](https://atlas-extractions.minestarters.com/news/americore-confirms-high-grade-silver-in-historic-trinity-core-including-509-g-t--1376a145-a3ce-4ebe-af34-e48972ee5c47.md)
- Original announcement: 2026-09-09T12:00:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Americore Resources Corp. (AMCO)
- Original source: [tmx](https://money.tmx.com/en/quote/AMCO/news/7745921051322314/americore-confirms-high-grade-silver-in-historic-trinity-core-including-509-g-t-)
- Atlas sentiment: 0.347
- Atlas tags: QA/QC Disclosed, Bonanza Intercept

Americore has confirmed high-grade silver mineralization at the Trinity Silver Project in Nevada through confirmatory sampling of historic drill core. The results, including up to 509 g/t silver, met or exceeded historical assay values and also confirmed the presence of lead and zinc. The company plans to appoint a technical contractor to complete an updated Mineral Resource Estimate in Q4 2026.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used. Requires an actual metal equivalent grade; a combined elemental basket such as PGE is not a metal equivalent.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **Deleterious Elements Present:** A source-stated penalty, refractory or recovery concern in the fact's scope. Element detection alone, including measured elements explicitly below penalty thresholds, does not trigger this tag. Respect negation and retain a separately stated concern even when another risk is explicitly absent.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** M&I share below the weak bound — very early stage, no engineering confidence.
- **Tonnage Growth:** Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Grade Decline:** Average grade fell below the red-flag bound vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade reduced beyond the suspicious bound vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component. No prior estimate exists, so every change band is not applicable.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
- **DFS Bankable:** AACE Class 2-1 study complete and within the staleness window.
- **PFS Complete:** AACE Class 3 study complete.
- **PEA Only:** Only Class 4 / Initial Assessment economics available. Not bankable.
- **No Study:** No formal economic study — no engineering basis for the economics quoted.
- **Stale Study:** Beyond the staleness window measured from the estimate base date.
- **Inferred Heavy Feed:** Material Inferred share of LOM mill feed, or the share is undisclosed.
- **Resource Governance Undisclosed:** No QA/QC, top-cut methodology or QP independence disclosed. Caps study quality at the moderate tier.
- **NPV Cut vs Prior Study:** A restated study reduces NPV materially against its own predecessor on the same asset.
- **High IRR:** Post-tax real unlevered IRR in the strong tier or better.
- **Low IRR:** IRR below the moderate tier.
- **Below Jurisdiction Hurdle:** IRR below the greenfield or brownfield hurdle for its jurisdiction tier.
- **IRR Basis Undisclosed:** Real vs nominal not stated, so the tier is not comparable across studies.
- **Undervalued PNAV:** Funding-adjusted P/NAV in the strong tier or better.
- **Overvalued PNAV:** Funding-adjusted P/NAV in the red-flag tier.
- **Fast Payback:** Payback in the strong tier or better, on the required basis.
- **Slow Payback:** Payback in the weak tier or worse.
- **Bottom Quartile Cost:** P0-25 of the relevant commodity cost curve.
- **Top Quartile Cost:** P75-100 of the relevant commodity cost curve — first to cut in a downturn.
- **Cost Basis Undisclosed:** By-product vs co-product not stated, so quartile placement is unreliable.
- **Low Capital Intensity:** Below the benchmark for its project type.
- **High Capital Intensity:** Above the benchmark for its project type.
- **Conservative Pricing:** Conservative on the worst of the spot, 3-year and consensus comparisons.
- **Aggressive Pricing:** The study only works on a stretched price deck.
- **No Price Sensitivity:** No price sensitivity disclosed — treated as a deliberate signal, not a neutral gap.
- **No Discount Rate Sensitivity:** Blocks NPV normalisation to the common rate without reconstruction.
- **Price Deck Unstructured:** Prices given only as free text, so conservatism cannot be scored.
- **Long Reserve Life:** Reserve life index in the top tier of the single ladder.
- **Short Reserve Life:** Reserve life index in the critical tier.
- **Resource Life Upside:** Wide gap between reserve life and resource life — conversion upside rather than discovery dependence.
- **Fully Funded:** Funding coverage at or above 1.0x counting committed facilities only.
- **Material Funding Gap:** Funding coverage below the substantially-funded band.
- **Funding Gap Exceeds Market Cap:** Red flag regardless of headline NPV — the upside is not reachable by the current equity holder.
- **Encumbered by Stream:** An existing stream or royalty reduces attributable NAV and restricts future financing.
- **Stability Agreement:** Fiscal terms fixed, with a term covering the mine life.
- **High Government Take:** Total government take above the regional norm as a share of pre-tax cash flow.
- **Fully Permitted:** Key permits granted with no unresolved challenge.
- **Permit Challenge Outstanding:** An appeal or legal challenge is unresolved, which can defer first production indefinitely.
- **No Community Agreement:** Permits held but no IBA or benefit agreement — the start date is unsupported.
- **Closure Underprovisioned:** Closure provision materially below peers, unfunded, or undisclosed.
- **Upstream TSF:** Upstream tailings construction, which is banned in Brazil and Ecuador.
