Summary

Savannah Resources reported a major JORC 2012-compliant lithium resource increase at the Mina do Barroso project in northern Portugal, including a 64% increase at the Grandao deposit to 16.4Mt at 1.04% Li2O. The overall project resource now stands at 20.1Mt at 1.04% Li2O, with approximately 90% of the Stage 1 Grandao pit mineralisation now in Measured and Indicated categories. The release also notes an exploration target of 9-15Mt, but says the target is conceptual and further work is needed.

Reasoning: A substantial lithium resource upgrade is the main event, with the Grandao deposit and overall project resource both increasing and the resource base moving toward higher-confidence categories. The release is materially positive but partly tempered by the fact that much of the drilling and intersections underpinning the estimate were previously reported.

Positive factors

  • ~64% increase in the total Mineral Resource Estimate at Grandao Deposit to 16.4Mt
  • JORC 2012-compliant Measured, Indicated and Inferred Mineral Resource Estimate
  • ~90% of the mineralisation within the Stage 1 Grandao pit now converted to Measured and Indicated Resource Estimates
  • cut-off grade of 0.5% Li2O disclosed
  • QA/QC protocols were in place for the drilling programmes

Negative factors

  • Exploration Target is conceptual and insufficient exploration work has been completed to estimate a mineral resource
  • No new exploration results have been reported in this release; drill intersections used in the resource have been previously reported

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 29

Classification and evidence

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resource Estimate is stated to be in accordance with the JORC Code, 2012 Edition.

Evidence · text

“in accordance with the JORC Code, 2012 Edition”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: A named Competent Person is provided for both exploration results and mineral resources.

Evidence · text

“Mr Paul Payne, a Competent Person”

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The resource table states a 0.5% Li2O cut-off.

Evidence · text

“0.5% Li2O Cut-off”

QA/QC Disclosedpositive

Reported assays have a certified laboratory, actual QA/QC methods, or named QP/CP responsibility. Generic CP boilerplate, old-release references, plans and unrelated work are insufficient. Approval of a correction does not verify expressly unverified historical assays; assay accuracy is not guaranteed.

Why it applies: The release describes blanks, standards and field duplicates for the drilling programmes.

Evidence · text

“QAQC protocols were in place for the drilling programmes and included the used of blanks, standards and field duplicates.”

Nearology Playneutral

The disclosed value premise relies on proximity to another known deposit rather than the issuer's own results. Mere location or along-strike wording in a release that reports its own drilling does not establish this premise.

Why it applies: The project is framed as having further upside from other high priority exploration prospects within the project area.

Evidence · text

“further upside remaining from the many other high priority exploration prospects within the project area”

Extracted facts

Stored fact records: 29. Some facts used in scoring do not have a stored record.

Drill Results (1)

Fact 1Mina do Barroso · lithiumGrade: 1Grade Unit: %Needs review: drill_no_hole_idView all details
Link to this fact

Identity

Project
Mina do Barroso
Commodity
lithium
Region
northern portugal
Reported Region
northern portugal

Geometry

Grade
1
Grade Unit
%

Classification

Deposit Type
other
Program
exploration
Sample Type
drill
Mining Method
open_pit

Location

Location
Grandao and Reservatorio
Loc. Source
document

QA/QC

Laboratory
Nagrom Metallurgical
QA/QC Disclosed
Yes
QA/QC Methods
standards, blanks, duplicates

Review

Needs Review
Yes
Review Reason
drill_no_hole_id
Interp. Status
scored
Historical
No

Reasoning: The exploration target is stated in the release, but it is conceptual and not a completed drill intercept.

Positive factors

  • Exploration Target disclosed for Grandao and Reservatorio
  • further upside remains from other prospects

Negative factors

  • Exploration Target is conceptual and not a mineral resource
  • insufficient exploration work to estimate a mineral resource

Tags used in scoring

QA/QC Disclosedpositive

Reported assays have a certified laboratory, actual QA/QC methods, or named QP/CP responsibility. Generic CP boilerplate, old-release references, plans and unrelated work are insufficient. Approval of a correction does not verify expressly unverified historical assays; assay accuracy is not guaranteed.

Why it applies: qaqc_disclosed is true

Cut Off Undisclosednegative

Reported composited assay intervals omit the cut-off grade used for those intervals. Apply only to actual reported assay intervals in the reviewed scope, not drilling plans or missing extraction fields alone.

Why it applies: no cutoff_grade was stated

Resource Estimates (28)

measuredMina do Barroso Lithium Project · lithiumTonnes: 5500000Grade: 1.08Grade Unit: %Contained Metal: 59600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:65ddf7ed0930911a8db8
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
measured
Tonnes
5500000
Grade
1.08
Grade Unit
%
Contained Metal
59600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: Measured lithium resource at Grandao adds high-confidence tonnes and grade to the project resource base.

Positive factors

  • Measured category disclosed
  • large tonnage base at Grandao
  • cut-off grade disclosed
  • JORC-compliant estimate with named Competent Person

Negative factors

  • No prior comparison values stated for this row

Tags used in scoring

Measured Resourcepositive

A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

measuredMina do Barroso Lithium Project · iron_oreTonnes: 5500000Grade: 1.3Grade Unit: %Contained Metal: 59600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:65ddf7ed0930911a8db8
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
measured
Tonnes
5500000
Grade
1.3
Grade Unit
%
Contained Metal
59600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is disclosed for the measured Grandao resource row and should be retained as a separate commodity fact.

Positive factors

  • Iron grade reported alongside lithium resource table
  • resource estimate includes multi-commodity disclosure

Negative factors

  • Iron is a secondary grade column rather than the economic focus of the release

Tags used in scoring

Measured Resourcepositive

A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

indicatedMina do Barroso Lithium Project · lithiumTonnes: 4900000Grade: 0.93Grade Unit: %Contained Metal: 45600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:1a17a848ca1766d733e7
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
indicated
Tonnes
4900000
Grade
0.93
Grade Unit
%
Contained Metal
45600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: Indicated resource at Grandao strengthens the mine inventory and supports conversion toward reserve studies.

Positive factors

  • Indicated category disclosed
  • supports higher-confidence inventory for Grandao
  • cut-off grade disclosed

Negative factors

  • No prior comparison values stated for this row

Tags used in scoring

Indicated Resourcepositive

A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

indicatedMina do Barroso Lithium Project · iron_oreTonnes: 4900000Grade: 1.4Grade Unit: %Contained Metal: 45600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:1a17a848ca1766d733e7
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
indicated
Tonnes
4900000
Grade
1.4
Grade Unit
%
Contained Metal
45600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is disclosed for the indicated Grandao resource row and is preserved as a separate fact.

Positive factors

  • Iron grade reported alongside lithium resource table

Negative factors

  • Secondary grade column

Tags used in scoring

Indicated Resourcepositive

A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 6100000Grade: 1.1Grade Unit: %Contained Metal: 66200Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:1ee8c594ec392ba86f74
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
6100000
Grade
1.1
Grade Unit
%
Contained Metal
66200
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: The inferred Grandao lithium resource adds substantial tonnes, though with lower confidence than the higher categories.

Positive factors

  • Inferred resource disclosed for Grandao
  • supports the enlarged project resource base

Negative factors

  • Lower-confidence category than measured or indicated

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · iron_oreTonnes: 6100000Grade: 1.4Grade Unit: %Contained Metal: 66200Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:1ee8c594ec392ba86f74
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
6100000
Grade
1.4
Grade Unit
%
Contained Metal
66200
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is included in the inferred Grandao resource row and extracted separately.

Positive factors

  • Iron grade reported in inferred row

Negative factors

  • Secondary commodity

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

measuredMina do Barroso Lithium Project · lithiumTonnes: 5500000Grade: 1.08Grade Unit: %Contained Metal: 59600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:911bee531483b02eb131
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
measured
Tonnes
5500000
Grade
1.08
Grade Unit
%
Contained Metal
59600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: The all-deposits measured lithium resource shows the project-wide high-confidence portion of the estimate.

Positive factors

  • Project-wide measured resource disclosed
  • part of the total updated Mineral Resource Estimate

Negative factors

  • Aggregated all-deposits figure rather than deposit-specific detail

Tags used in scoring

Measured Resourcepositive

A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

measuredMina do Barroso Lithium Project · iron_oreTonnes: 5500000Grade: 1.3Grade Unit: %Contained Metal: 59600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:911bee531483b02eb131
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
measured
Tonnes
5500000
Grade
1.3
Grade Unit
%
Contained Metal
59600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is reported for the overall measured resource row and retained separately.

Positive factors

  • Project-wide iron grade disclosed

Negative factors

  • Secondary commodity

Tags used in scoring

Measured Resourcepositive

A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

indicatedMina do Barroso Lithium Project · lithiumTonnes: 4900000Grade: 0.93Grade Unit: %Contained Metal: 45600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:e6313b986c8a64e99f44
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
indicated
Tonnes
4900000
Grade
0.93
Grade Unit
%
Contained Metal
45600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: The all-deposits indicated lithium resource contributes materially to the project total and higher-confidence inventory.

Positive factors

  • Project-wide indicated resource disclosed
  • part of the updated total Mineral Resource Estimate

Negative factors

  • Aggregated category row

Tags used in scoring

Indicated Resourcepositive

A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

indicatedMina do Barroso Lithium Project · iron_oreTonnes: 4900000Grade: 1.4Grade Unit: %Contained Metal: 45600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:e6313b986c8a64e99f44
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
indicated
Tonnes
4900000
Grade
1.4
Grade Unit
%
Contained Metal
45600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is disclosed for the all-deposits indicated row and preserved as a separate fact.

Positive factors

  • Project-wide iron grade disclosed

Negative factors

  • Secondary commodity

Tags used in scoring

Indicated Resourcepositive

A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 9700000Grade: 1.1Grade Unit: %Contained Metal: 103900Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:bde12289a16eb570e028
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
9700000
Grade
1.1
Grade Unit
%
Contained Metal
103900
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: The inferred lithium component remains large, but at lower confidence than measured or indicated material.

Positive factors

  • Project-wide inferred resource disclosed
  • supports the total project tonnage growth

Negative factors

  • Lower-confidence category

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · iron_oreTonnes: 9700000Grade: 1.4Grade Unit: %Contained Metal: 103900Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:bde12289a16eb570e028
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
9700000
Grade
1.4
Grade Unit
%
Contained Metal
103900
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is included in the project-wide inferred row and extracted separately.

Positive factors

  • Project-wide iron grade disclosed

Negative factors

  • Secondary commodity

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

measuredMina do Barroso Lithium Project · lithiumTonnes: 5500000Grade: 1.08Grade Unit: %Contained Metal: 59600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:65ddf7ed0930911a8db8
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
measured
Tonnes
5500000
Grade
1.08
Grade Unit
%
Contained Metal
59600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: This is the measured lithium row for Grandao in the updated estimate; it is a substantive resource fact rather than a drill intercept.

Positive factors

  • Grandao deposit resource expanded materially
  • high-confidence measured category

Negative factors

  • Prior Grandao figures are not stated in the table row itself

Tags used in scoring

Measured Resourcepositive

A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

measuredMina do Barroso Lithium Project · iron_oreTonnes: 5500000Grade: 1.3Grade Unit: %Contained Metal: 59600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:65ddf7ed0930911a8db8
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
measured
Tonnes
5500000
Grade
1.3
Grade Unit
%
Contained Metal
59600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: The iron grade in the Grandao measured row is retained as a separate resource fact.

Positive factors

  • Iron grade reported in Grandao measured row

Negative factors

  • Secondary commodity

Tags used in scoring

Measured Resourcepositive

A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

indicatedMina do Barroso Lithium Project · lithiumTonnes: 4900000Grade: 0.93Grade Unit: %Contained Metal: 45600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:1a17a848ca1766d733e7
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
indicated
Tonnes
4900000
Grade
0.93
Grade Unit
%
Contained Metal
45600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: This is a key Grandao indicated resource fact within the updated estimate.

Positive factors

  • Grandao indicated resource adds to the higher-confidence inventory

Negative factors

  • No direct prior-value comparison in the row

Tags used in scoring

Indicated Resourcepositive

A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

indicatedMina do Barroso Lithium Project · iron_oreTonnes: 4900000Grade: 1.4Grade Unit: %Contained Metal: 45600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:1a17a848ca1766d733e7
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
indicated
Tonnes
4900000
Grade
1.4
Grade Unit
%
Contained Metal
45600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is present in the Grandao indicated row and is extracted separately.

Positive factors

  • Iron grade disclosed in Grandao indicated row

Negative factors

  • Secondary commodity

Tags used in scoring

Indicated Resourcepositive

A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 6100000Grade: 1.1Grade Unit: %Contained Metal: 66200Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:1ee8c594ec392ba86f74
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
6100000
Grade
1.1
Grade Unit
%
Contained Metal
66200
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: The inferred Grandao lithium row captures the lower-confidence portion of the updated deposit resource.

Positive factors

  • Grandao inferred resource remains substantial
  • part of the deposit total of 16.4Mt

Negative factors

  • Lower-confidence category

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · iron_oreTonnes: 6100000Grade: 1.4Grade Unit: %Contained Metal: 66200Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:1ee8c594ec392ba86f74
Deposit or zone
Grandao
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
6100000
Grade
1.4
Grade Unit
%
Contained Metal
66200
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is retained separately for the Grandao inferred row.

Positive factors

  • Iron grade disclosed in Grandao inferred row

Negative factors

  • Secondary commodity

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 3200000Grade: 1Grade Unit: %Contained Metal: 32000Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:0a81632186f6346d7c14
Deposit or zone
Reservatorio
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
3200000
Grade
1
Grade Unit
%
Contained Metal
32000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: Reservatorio lithium resource is explicitly reported and contributes to the project total.

Positive factors

  • Reservatorio resource disclosed in the updated project summary
  • supports the broader project total

Negative factors

  • Only inferred category shown in this table excerpt

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · iron_oreTonnes: 3200000Grade: 1.4Grade Unit: %Contained Metal: 32000Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:0a81632186f6346d7c14
Deposit or zone
Reservatorio
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
3200000
Grade
1.4
Grade Unit
%
Contained Metal
32000
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: Iron grade for the Reservatorio inferred row is extracted as a separate fact.

Positive factors

  • Iron grade disclosed in Reservatorio inferred row

Negative factors

  • Secondary commodity

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 500000Grade: 1.2Grade Unit: %Contained Metal: 5600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:ac01fa7e86fdaf8e2e32
Deposit or zone
NOA
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
500000
Grade
1.2
Grade Unit
%
Contained Metal
5600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: NOA adds a smaller inferred lithium resource to the project inventory.

Positive factors

  • NOA resource disclosed in the project table

Negative factors

  • Smaller tonnage than Grandao and project total

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · iron_oreTonnes: 500000Grade: 1.3Grade Unit: %Contained Metal: 5600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:ac01fa7e86fdaf8e2e32
Deposit or zone
NOA
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
500000
Grade
1.3
Grade Unit
%
Contained Metal
5600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: Iron grade is retained for the NOA inferred row as a separate fact.

Positive factors

  • Iron grade disclosed in NOA row

Negative factors

  • Secondary commodity

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

measuredMina do Barroso Lithium Project · lithiumTonnes: 5500000Grade: 1.08Grade Unit: %Contained Metal: 59600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:911bee531483b02eb131
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
measured
Tonnes
5500000
Grade
1.08
Grade Unit
%
Contained Metal
59600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10
Prior Tonnes
14000000
Prior Grade
1.1

Lab

Laboratory
ALS

Location

Loc. Confidence
high

Review

Needs Review
No
Historical
No

Reasoning: This all-deposits measured lithium row is part of the updated project resource, which the release says is up about 44% versus the prior 14Mt estimate.

Positive factors

  • Overall project resource increased to 20.1Mt
  • JORC-compliant estimate and higher-confidence categories expanding

Negative factors

  • Prior project estimate is only referenced, not fully restated in the table row

Tags used in scoring

Measured Resourcepositive

A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Declinenegative

Resource tonnage decreased against a like-for-like prior estimate under TONNAGE_CHANGE_BANDS. Do not infer the cause, such as depletion, pit optimisation or a revised geological model, unless the source states it.

Why it applies: 5500000 against 14000000 previously

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

measuredMina do Barroso Lithium Project · iron_oreTonnes: 5500000Grade: 1.3Grade Unit: %Contained Metal: 59600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:911bee531483b02eb131
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
measured
Tonnes
5500000
Grade
1.3
Grade Unit
%
Contained Metal
59600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: Iron grade in the all-deposits measured row is retained separately.

Positive factors

  • Iron grade disclosed in overall measured row

Negative factors

  • Secondary commodity

Tags used in scoring

Measured Resourcepositive

A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

indicatedMina do Barroso Lithium Project · lithiumTonnes: 4900000Grade: 0.93Grade Unit: %Contained Metal: 45600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:e6313b986c8a64e99f44
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
indicated
Tonnes
4900000
Grade
0.93
Grade Unit
%
Contained Metal
45600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: This is the project-wide indicated lithium row from the updated resource estimate.

Positive factors

  • Project-wide indicated resource contributes to total estimate

Negative factors

  • Aggregate row

Tags used in scoring

Indicated Resourcepositive

A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

indicatedMina do Barroso Lithium Project · iron_oreTonnes: 4900000Grade: 1.4Grade Unit: %Contained Metal: 45600Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:e6313b986c8a64e99f44
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
indicated
Tonnes
4900000
Grade
1.4
Grade Unit
%
Contained Metal
45600
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: Iron grade in the all-deposits indicated row is extracted separately.

Positive factors

  • Project-wide iron grade disclosed

Negative factors

  • Secondary commodity

Tags used in scoring

Indicated Resourcepositive

A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 9700000Grade: 1.1Grade Unit: %Contained Metal: 103900Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:bde12289a16eb570e028
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
9700000
Grade
1.1
Grade Unit
%
Contained Metal
103900
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: The overall inferred lithium row captures most of the project's lower-confidence tonnes.

Positive factors

  • Project-wide inferred resource disclosed in the total estimate

Negative factors

  • Lower-confidence category

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

inferredMina do Barroso Lithium Project · iron_oreTonnes: 9700000Grade: 1.4Grade Unit: %Contained Metal: 103900Contained Unit: tView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
iron_ore
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-09-10T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Paul Payne
Resource group id
resource:bde12289a16eb570e028
Deposit or zone
All Deposits
Mining method
open_pit

Resource Data

Category
inferred
Tonnes
9700000
Grade
1.4
Grade Unit
%
Contained Metal
103900
Contained Unit
t
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-09-10

Review

Needs Review
No
Historical
No

Reasoning: Iron grade in the all-deposits inferred row is extracted separately.

Positive factors

  • Project-wide iron grade disclosed

Negative factors

  • Secondary commodity

Tags used in scoring

Inferred Resourcenegative

A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

The estimate effective date exceeds the MRE_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 8.2 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.