# AbraSilver Announces Filing of Updated Pre-Feasibility Study for Diablillos

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/abrasilver-announces-filing-of-updated-pre-feasibility-study-for-diablillos--fc1df286-4b8f-4a23-b7b4-35a4b1a34823

Original source: https://www.sedarplus.ca/csa-party/records/document.html?id=76aecb56abdbcb6ef79fce131b805cec6441ebb9e0c7306e71e0b1b67ea4a0c3

Publisher: research

Original announcement: Unknown date

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-03T10:38:48.090Z

Atlas analysis updated: 2026-11-03T10:38:48.090Z

- Company: AbraSilver Resource Corp.

- Ticker: ABRA

- Exchange: TSX

- Region: Salta province, Argentina

- Primary commodity: Silver

- Secondary commodities: Gold

- Document categories: Other, Resource update, Agreement transaction

- Extracted: 2026-11-03 10:38:48 UTC

Narrative sentiment: 0.35 · Bullish

## Minestarters Atlas summary

AbraSilver says it has filed an updated NI 43-101 pre-feasibility study for the Diablillos silver-gold project in Salta province, Argentina. The report is dated January 13, 2025 and has an effective date of December 3, 2024, with no material differences from the results disclosed on that date. The release also restates the project's current Proven and Probable Mineral Reserve estimate of 42.3 Mt grading 91 g/t Ag and 0.81 g/t Au, containing approximately 124 Moz silver and 1.1 Moz gold.

Reasoning: This is primarily a PFS filing announcement, with a reserve summary and a mention of an earn-in JV elsewhere in the body. The news is positive for project de-risking, but the release itself is mostly administrative and does not disclose the full economic model.

- Positive factor: Updated NI 43-101 compliant pre-feasibility study filed for Diablillos.

- Positive factor: The report has an effective date of December 3, 2024 and is described as having no material differences from the December 3, 2024 results disclosure.

- Positive factor: The project's current Proven and Probable Mineral Reserve estimate is stated in the release.

- Negative factor: No detailed study metrics such as NPV, IRR, capex, opex, or payback are provided in this release.

- Negative factor: No new resource or reserve figures are announced beyond the summary reserve statement.

- Negative factor: The release says there are no material differences from the prior disclosure, limiting incremental novelty.

- Rubric flag: resource\_update completeness — If the full PFS contains an estimate table or economic metrics, extract those separately only when they are explicitly present in the provided document text.

Facts used in scoring: 2

## Classification and evidence

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: The title and body state that a 'updated pre-feasibility study' has been filed.

Evidence · text

> filed on SEDAR+ a National Instrument 43-101 – Standards of Disclosure for Mineral Projects compliant updated pre-feasibility study

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The report is stated to be 'National Instrument 43-101 ... compliant'.

Evidence · text

> National Instrument 43-101 – Standards of Disclosure for Mineral Projects compliant updated pre-feasibility study

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The release restates the current Proven and Probable Mineral Reserve estimate for Diablillos.

Evidence · text

> The current Proven and Probable Mineral Reserve estimate for Diablillos, consists of 42.3 Mt grading 91 g/t Ag and 0.81 g/t Au

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### proven

[Link to this fact](https://atlas-extractions.minestarters.com/news/abrasilver-announces-filing-of-updated-pre-feasibility-study-for-diablillos--fc1df286-4b8f-4a23-b7b4-35a4b1a34823#fact-resource-facts-0)

Diablillos

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Salta province, Argentina
- Ticker: ABRA

#### Resource scope

- Estimate type: reserve
- Reporting standards: ni\_43\_101
- Resource group id: resource:6029b11e11ff6c00e3a1
- Deposit or zone: Diablillos

#### Resource Data

- Category: proven
- Tonnes: 42300000
- Grade: 91
- Grade Unit: g/t
- Contained Metal: 124
- Contained Unit: moz

#### Prior Estimate

- Resource Date: 2024-12-03

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-12-03T00:00:00.000Z

Reasoning: The release reiterates the project's reserve summary as context for the PFS filing; the figures are source text but not new in this announcement.

- Positive factor: Proven and Probable reserve estimate is explicitly stated for Diablillos.

- Positive factor: The reserve contains approximately 124 Moz silver.

- Negative factor: This is a restatement of the current reserve summary rather than a new estimate in the release body.

- Negative factor: Cut-off grade is not disclosed in this release.

- Negative factor: No QP/CP names are provided in the text excerpt.

#### Tags used in scoring

**Proven Reserve**

Polarity: positive

Definition: Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### proven

[Link to this fact](https://atlas-extractions.minestarters.com/news/abrasilver-announces-filing-of-updated-pre-feasibility-study-for-diablillos--fc1df286-4b8f-4a23-b7b4-35a4b1a34823#fact-resource-facts-1)

Diablillos

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Salta province, Argentina
- Ticker: ABRA

#### Resource scope

- Estimate type: reserve
- Reporting standards: ni\_43\_101
- Resource group id: resource:6029b11e11ff6c00e3a1
- Deposit or zone: Diablillos

#### Resource Data

- Category: proven
- Tonnes: 42300000
- Grade: 0.81
- Grade Unit: g/t
- Contained Metal: 1.1
- Contained Unit: moz

#### Prior Estimate

- Resource Date: 2024-12-03

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-12-03T00:00:00.000Z

Reasoning: The same reserve row is split into separate commodity facts for silver and gold, as required.

- Positive factor: Proven and Probable reserve estimate is explicitly stated for Diablillos.

- Positive factor: The reserve contains approximately 1.1 Moz gold.

- Negative factor: This is a restatement of the current reserve summary rather than a new estimate in the release body.

- Negative factor: Cut-off grade is not disclosed in this release.

- Negative factor: No QP/CP names are provided in the text excerpt.

#### Tags used in scoring

**Proven Reserve**

Polarity: positive

Definition: Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
