AGNICO EAGLE REPORTS SECOND QUARTER 2026 RESULTS - RECORD QUARTERLY FREE CASH FLOW REFLECTS SOLID OPERATIONAL PERFORMANCE; RECORD QUARTERLY SHAREHOLDER RETURNS
Original announcement by tmx on
- Company
- Agnico Eagle Mines Limited
- Ticker
- AEM
- Exchange
- TSX
- Region
- Unavailable
- Primary commodity
- Gold
- Secondary commodities
- Silver, Zinc, Copper
- Document categories
- Drill results, Production, Economic study
- Extracted
- 2026-09-19 06:41:08 UTC
Analysis by Minestarters Atlas
Minestarters Atlas analysis
Summary
Agnico Eagle reported record quarterly free cash flow of $1.335 billion and strong financial results for Q2 2026, driven by solid operational performance and higher realized gold prices. The company's gold production decreased slightly year-over-year, while production costs and AISC increased. Exploration drilling yielded positive results across several projects, and the Hope Bay project received a positive investment decision with strong economic projections. However, full-year production guidance was adjusted to the lower end of the range due to a rock mass movement at the Canadian Malartic Barnat open pit.
Reasoning: Agnico Eagle reported strong Q2 2026 financial results driven by record free cash flow and higher gold prices, despite a slight decrease in gold production and increased costs. The company highlighted strong operational performance at several mines and positive exploration results from key projects. However, production guidance was adjusted downwards due to issues at Canadian Malartic's Barnat pit. Key development projects like Hope Bay and San Nicolás are advancing, with Hope Bay's PEA showing strong economics, though it relies partly on inferred resources.
Positive factors
- Record quarterly free cash flow and strong financial results.
- Strong operating performance led by Detour Lake, Kittila, and Fosterville.
- Significant exploration drill results from multiple projects, including high-grade gold and copper intercepts.
- Positive investment decision for Hope Bay project with strong economics.
- San Nicolás project received key permits, advancing development.
Negative factors
- Gold production decreased compared to prior year periods.
- Production costs and AISC increased compared to prior year periods.
- Barnat open pit production reduced due to rock mass movement, impacting Canadian Malartic's guidance.
- Hope Bay PEA includes inferred mineral resources, which are speculative.
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 62
Extracted facts
Stored fact records: 46. Some facts used in scoring do not have a stored record.
Drill Results (46)
MEX25-354Odyssey · goldGrade: 1.9Grade Unit: g/tIntercept: 16.4 mView all detailsHide details
Identity
- Hole ID
- MEX25-354
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 1.9
- Grade Unit
- g/t
- Intercept
- 16.4 m
- From
- 1911.1 m
- To
- 1927.5 m
- Hole Depth
- 2151 m
- Intercept Depth
- 1917 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- MEX25-354:1911.1-1927.5
Location
- Location
- East Gouldie
- Easting
- 717791
- Northing
- 5334354
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- 310 m
- Azimuth
- 105 °
- Dip
- -89 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept, part of a pilot hole for Shaft #2, indicates mineralization at significant depth, supporting future potential, though true width is not provided.
Positive factors
- Demonstrates potential for additional mineralization at depth in East Gouldie.
Negative factors
- True width undetermined.
Evidence · table
“1.9”
Context: MEX25-354
Tags used in scoring
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“1.9 g/t gold over 16.4 metres (core length, true width undetermined)”
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
MEX25-354Odyssey · goldGrade: 3.8Grade Unit: g/tIntercept: 19.2 mView all detailsHide details
Identity
- Hole ID
- MEX25-354
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 3.8
- Grade Unit
- g/t
- Intercept
- 19.2 m
- From
- 1944 m
- To
- 1963.2 m
- Hole Depth
- 2151 m
- Intercept Depth
- 1951 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- MEX25-354:1944-1963.2
Location
- Location
- East Gouldie
- Easting
- 717791
- Northing
- 5334354
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- 310 m
- Azimuth
- 105 °
- Dip
- -89 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept, part of a pilot hole for Shaft #2, indicates mineralization at significant depth, supporting future potential, though true width is not provided.
Positive factors
- Demonstrates potential for additional mineralization at depth in East Gouldie.
Negative factors
- True width undetermined.
Evidence · table
“3.8”
Context: MEX25-354
Tags used in scoring
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“3.8 g/t gold over 19.2 metres (core length)”
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
MEX25-354Odyssey · goldGrade: 11.2Grade Unit: g/tIntercept: 3.8 mView all detailsHide details
Identity
- Hole ID
- MEX25-354
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 11.2
- Grade Unit
- g/t
- Intercept
- 3.8 m
- From
- 1945.5 m
- To
- 1949.4 m
- Hole Depth
- 2151 m
- Intercept Depth
- 1945 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- MEX25-354:1945.5-1949.4
Location
- Location
- East Gouldie
- Easting
- 717791
- Northing
- 5334354
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- 310 m
- Azimuth
- 105 °
- Dip
- -89 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade sub-interval further enhances the prospectivity of the deep East Gouldie deposit, though true width is not provided.
Positive factors
- High-grade intercept within a broader zone, demonstrating potential at depth.
Negative factors
- True width undetermined.
Evidence · table
“11.2”
Context: MEX25-354
Tags used in scoring
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“11.2 g/t gold over 3.8 metres (core length)”
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
MEX25-354Odyssey · goldGrade: 2.6Grade Unit: g/tIntercept: 15.8 mView all detailsHide details
Identity
- Hole ID
- MEX25-354
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 2.6
- Grade Unit
- g/t
- Intercept
- 15.8 m
- From
- 1972.6 m
- To
- 1988.4 m
- Hole Depth
- 2151 m
- Intercept Depth
- 1978 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- MEX25-354:1972.6-1988.4
Location
- Location
- East Gouldie
- Easting
- 717791
- Northing
- 5334354
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- 310 m
- Azimuth
- 105 °
- Dip
- -89 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept, part of a pilot hole for Shaft #2, indicates mineralization at significant depth, supporting future potential, though true width is not provided.
Positive factors
- Demonstrates potential for additional mineralization at depth in East Gouldie.
Negative factors
- True width undetermined.
Evidence · table
“2.6”
Context: MEX25-354
Tags used in scoring
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“2.6 g/t gold over 15.8 metres (core length)”
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGEG-071-034Odyssey · goldGrade: 6.6Grade Unit: g/tIntercept: 10.8 mView all detailsHide details
Identity
- Hole ID
- UGEG-071-034
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 6.6
- Grade Unit
- g/t
- Intercept
- 10.8 m
- True Width
- 10.8 m
- From
- 508 m
- To
- 519.6 m
- Hole Depth
- 720 m
- Intercept Depth
- 1046 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGEG-071-034:508-519.6
Location
- Location
- East Gouldie
- Easting
- 717759
- Northing
- 5333976
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -346 m
- Azimuth
- 172 °
- Dip
- -55 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept in the upper East Gouldie deposit is significant, potentially providing operational flexibility and higher-grade material.
Positive factors
- High-grade intercept in the upper eastern portion of East Gouldie, offering potential for a second mining area.
Evidence · table
“6.6”
Context: UGEG-071-034
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“10.8”
Context: UGEG-071-034
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGEG-071-034Odyssey · goldGrade: 1.9Grade Unit: g/tIntercept: 17.2 mView all detailsHide details
Identity
- Hole ID
- UGEG-071-034
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 1.9
- Grade Unit
- g/t
- Intercept
- 17.2 m
- True Width
- 17.2 m
- From
- 562 m
- To
- 581 m
- Hole Depth
- 720 m
- Intercept Depth
- 1088 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGEG-071-034:562-581
Location
- Location
- East Gouldie
- Easting
- 717759
- Northing
- 5333976
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -346 m
- Azimuth
- 172 °
- Dip
- -55 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept contributes to the understanding of mineralization in the East Gouldie deposit.
Positive factors
- Indicates broader mineralization in the East Gouldie deposit.
Evidence · table
“1.9”
Context: UGEG-071-034
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“17.2”
Context: UGEG-071-034
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGEG-071-034Odyssey · goldGrade: 6.1Grade Unit: g/tIntercept: 11.6 mView all detailsHide details
Identity
- Hole ID
- UGEG-071-034
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 6.1
- Grade Unit
- g/t
- Intercept
- 11.6 m
- True Width
- 11.6 m
- From
- 630.5 m
- To
- 642.5 m
- Hole Depth
- 720 m
- Intercept Depth
- 1133 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGEG-071-034:630.5-642.5
Location
- Location
- East Gouldie
- Easting
- 717759
- Northing
- 5333976
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -346 m
- Azimuth
- 172 °
- Dip
- -55 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept in the upper East Gouldie deposit is significant, potentially providing operational flexibility and higher-grade material.
Positive factors
- High-grade intercept in the upper eastern portion of East Gouldie, offering potential for a second mining area.
Evidence · table
“6.1”
Context: UGEG-071-034
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“11.6”
Context: UGEG-071-034
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGEG-071-034Odyssey · goldGrade: 12.6Grade Unit: g/tIntercept: 2.7 mView all detailsHide details
Identity
- Hole ID
- UGEG-071-034
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 12.6
- Grade Unit
- g/t
- Intercept
- 2.7 m
- True Width
- 2.7 m
- From
- 632.2 m
- To
- 634.9 m
- Hole Depth
- 720 m
- Intercept Depth
- 1130 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGEG-071-034:632.2-634.9
Location
- Location
- East Gouldie
- Easting
- 717759
- Northing
- 5333976
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -346 m
- Azimuth
- 172 °
- Dip
- -55 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade sub-interval further highlights the quality of mineralization in the East Gouldie deposit.
Positive factors
- High-grade intercept within a broader zone, indicating strong mineralization.
Evidence · table
“12.6”
Context: UGEG-071-034
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“2.7”
Context: UGEG-071-034
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGEG-075-062Odyssey · goldGrade: 5.1Grade Unit: g/tIntercept: 14.3 mView all detailsHide details
Identity
- Hole ID
- UGEG-075-062
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 5.1
- Grade Unit
- g/t
- Intercept
- 14.3 m
- True Width
- 14.3 m
- From
- 554 m
- To
- 568.5 m
- Hole Depth
- 756 m
- Intercept Depth
- 916 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGEG-075-062:554-568.5
Location
- Location
- East Gouldie
- Easting
- 717713
- Northing
- 5334082
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -340 m
- Azimuth
- 173 °
- Dip
- -33 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept in the upper East Gouldie deposit is significant, potentially providing operational flexibility and higher-grade material.
Positive factors
- High-grade intercept in the upper eastern portion of East Gouldie, offering potential for a second mining area.
Evidence · table
“5.1”
Context: UGEG-075-062
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“14.3”
Context: UGEG-075-062
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGOD-057-013Odyssey · goldGrade: 10.7Grade Unit: g/tIntercept: 7 mView all detailsHide details
Identity
- Hole ID
- UGOD-057-013
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 10.7
- Grade Unit
- g/t
- Intercept
- 7 m
- From
- 573.5 m
- To
- 580.5 m
- Hole Depth
- 767 m
- Intercept Depth
- 1039 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGOD-057-013:573.5-580.5
Location
- Location
- Ody N / Artemis
- Easting
- 718007
- Northing
- 5334110
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -261 m
- Azimuth
- 18 °
- Dip
- -55 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept in the new Artemis zone is a significant positive exploration result, highlighting potential for resource expansion.
Positive factors
- High-grade intercept in the newly identified Artemis zone, indicating significant mineralization.
Negative factors
- True width undetermined.
Evidence · table
“10.7”
Context: UGOD-057-013
Tags used in scoring
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“10.7 g/t gold over 7.0 metres (core length)”
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGOD-057-013Odyssey · goldGrade: 4.5Grade Unit: g/tIntercept: 13.5 mView all detailsHide details
Identity
- Hole ID
- UGOD-057-013
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 4.5
- Grade Unit
- g/t
- Intercept
- 13.5 m
- From
- 592.5 m
- To
- 606 m
- Hole Depth
- 767 m
- Intercept Depth
- 1057 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGOD-057-013:592.5-606
Location
- Location
- Ody N / Artemis
- Easting
- 718007
- Northing
- 5334110
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -261 m
- Azimuth
- 18 °
- Dip
- -55 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept in the new Artemis zone contributes to understanding the extent of mineralization.
Positive factors
- Indicates broader mineralization in the newly identified Artemis zone.
Negative factors
- True width undetermined.
Evidence · table
“4.5”
Context: UGOD-057-013
Tags used in scoring
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“4.5 g/t gold over 13.5 metres (core length)”
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGOD-057-013Odyssey · goldGrade: 13.7Grade Unit: g/tIntercept: 14.6 mView all detailsHide details
Identity
- Hole ID
- UGOD-057-013
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 13.7
- Grade Unit
- g/t
- Intercept
- 14.6 m
- From
- 617.5 m
- To
- 632 m
- Hole Depth
- 767 m
- Intercept Depth
- 1078 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGOD-057-013:617.5-632
Location
- Location
- Ody N / Artemis
- Easting
- 718007
- Northing
- 5334110
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -261 m
- Azimuth
- 18 °
- Dip
- -55 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This very high-grade intercept in the new Artemis zone is a significant positive exploration result, highlighting strong potential for resource expansion.
Positive factors
- Very high-grade intercept in the newly identified Artemis zone, indicating strong mineralization.
Negative factors
- True width undetermined.
Evidence · table
“13.7”
Context: UGOD-057-013
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 13.7 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“13.7”
Context: UGOD-057-013
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“13.7 g/t gold over 14.6 metres (core length)”
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UGOD-057-013Odyssey · goldGrade: 20Grade Unit: g/tIntercept: 6 mView all detailsHide details
Identity
- Hole ID
- UGOD-057-013
- Project
- Odyssey
- Commodity
- gold
- Region
- canada_qc
- Reported Region
- canada_qc
- Ticker
- AEM
Geometry
- Grade
- 20
- Grade Unit
- g/t
- Intercept
- 6 m
- From
- 618.5 m
- To
- 624.5 m
- Hole Depth
- 767 m
- Intercept Depth
- 1075 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- UGOD-057-013:618.5-624.5
Location
- Location
- Ody N / Artemis
- Easting
- 718007
- Northing
- 5334110
- CRS
- NAD 83 UTM Zone 17N
- Elevation
- -261 m
- Azimuth
- 18 °
- Dip
- -55 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This exceptional high-grade sub-interval further confirms the strong mineralization in the new Artemis zone.
Positive factors
- Exceptional high-grade intercept within the new Artemis zone.
Negative factors
- True width undetermined.
Evidence · table
“20.0”
Context: UGOD-057-013
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 20 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“20.0”
Context: UGOD-057-013
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Rejected tags
Rejected tags — excluded from scoring because their label or evidence could not be verified.
Apparent Width OnlyRejected · negative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Reason: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Evidence · text
“37.3 g/t gold over 6.0 metres (core length)”
DLM26-1334ADetour Lake · goldGrade: 2.5Grade Unit: g/tIntercept: 62.3 mView all detailsHide details
Identity
- Hole ID
- DLM26-1334A
- Project
- Detour Lake
- Commodity
- gold
- Region
- canada
- Reported Region
- canada
- Ticker
- AEM
Geometry
- Grade
- 2.5
- Grade Unit
- g/t
- Intercept
- 62.3 m
- True Width
- 62.3 m
- From
- 280 m
- To
- 354.5 m
- Hole Depth
- 426 m
- Intercept Depth
- 275 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- DLM26-1334A:280-354.5
Location
- Location
- West Pit
- Easting
- 587127
- Northing
- 5541642
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 292 m
- Azimuth
- 177 °
- Dip
- -63 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This wide and good-grade intercept is a strong positive, confirming mineralization continuity and supporting the geological model.
Positive factors
- Significant width and good grade, validating continuity of mineralization in West Pit zone.
Evidence · table
“2.5”
Context: DLM26-1334A
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“62.3”
Context: DLM26-1334A
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
DLM26-1334ADetour Lake · goldGrade: 15.2Grade Unit: g/tIntercept: 5.9 mView all detailsHide details
Identity
- Hole ID
- DLM26-1334A
- Project
- Detour Lake
- Commodity
- gold
- Region
- canada
- Reported Region
- canada
- Ticker
- AEM
Geometry
- Grade
- 15.2
- Grade Unit
- g/t
- Intercept
- 5.9 m
- True Width
- 5.9 m
- From
- 301 m
- To
- 308.1 m
- Hole Depth
- 426 m
- Intercept Depth
- 264 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- DLM26-1334A:301-308.1
Location
- Location
- West Pit
- Easting
- 587127
- Northing
- 5541642
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 292 m
- Azimuth
- 177 °
- Dip
- -63 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This exceptional high-grade sub-interval further enhances the prospectivity of the West Pit zone.
Positive factors
- Exceptional high-grade intercept within a broader zone, confirming strong mineralization.
Evidence · table
“15.2”
Context: DLM26-1334A
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 15.2 g/t is well above the deposit-type norm for an open-pit gold project.
Evidence · table
“15.2”
Context: DLM26-1334A
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“5.9”
Context: DLM26-1334A
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
DLM26-1324Detour Lake · goldGrade: 4.5Grade Unit: g/tIntercept: 15.3 mView all detailsHide details
Identity
- Hole ID
- DLM26-1324
- Project
- Detour Lake
- Commodity
- gold
- Region
- canada
- Reported Region
- canada
- Ticker
- AEM
Geometry
- Grade
- 4.5
- Grade Unit
- g/t
- Intercept
- 15.3 m
- True Width
- 15.3 m
- From
- 260 m
- To
- 278 m
- Hole Depth
- 375 m
- Intercept Depth
- 229 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- DLM26-1324:260-278
Location
- Location
- West Pit
- Easting
- 587028
- Northing
- 5541651
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 292 m
- Azimuth
- 178 °
- Dip
- -59 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept provides further validation of mineralization continuity in the West Pit zone.
Positive factors
- Good grade and width, supporting the geological model in the West Pit zone.
Evidence · table
“4.5”
Context: DLM26-1324
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“15.3”
Context: DLM26-1324
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
DLM26-1324Detour Lake · goldGrade: 10Grade Unit: g/tIntercept: 4.9 mView all detailsHide details
Identity
- Hole ID
- DLM26-1324
- Project
- Detour Lake
- Commodity
- gold
- Region
- canada
- Reported Region
- canada
- Ticker
- AEM
Geometry
- Grade
- 10
- Grade Unit
- g/t
- Intercept
- 4.9 m
- True Width
- 4.9 m
- From
- 271 m
- To
- 276.8 m
- Hole Depth
- 375 m
- Intercept Depth
- 233 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- DLM26-1324:271-276.8
Location
- Location
- West Pit
- Easting
- 587028
- Northing
- 5541651
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 292 m
- Azimuth
- 178 °
- Dip
- -59 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade sub-interval further enhances the prospectivity of the West Pit zone.
Positive factors
- High-grade intercept within a broader zone, confirming strong mineralization.
Evidence · table
“10.0”
Context: DLM26-1324
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 10 g/t is well above the deposit-type norm for an open-pit gold project.
Evidence · table
“10.0”
Context: DLM26-1324
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“4.9”
Context: DLM26-1324
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
DLM26-1324Detour Lake · goldGrade: 8.3Grade Unit: g/tIntercept: 4.3 mView all detailsHide details
Identity
- Hole ID
- DLM26-1324
- Project
- Detour Lake
- Commodity
- gold
- Region
- canada
- Reported Region
- canada
- Ticker
- AEM
Geometry
- Grade
- 8.3
- Grade Unit
- g/t
- Intercept
- 4.3 m
- True Width
- 4.3 m
- From
- 313 m
- To
- 318 m
- Hole Depth
- 375 m
- Intercept Depth
- 268 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- DLM26-1324:313-318
Location
- Location
- West Pit
- Easting
- 587028
- Northing
- 5541651
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 292 m
- Azimuth
- 178 °
- Dip
- -59 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept provides further validation of mineralization continuity in the West Pit zone.
Positive factors
- High-grade intercept, supporting the geological model in the West Pit zone.
Evidence · table
“8.3”
Context: DLM26-1324
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“4.3”
Context: DLM26-1324
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
DLM26-1297AWDetour Lake · goldGrade: 13.5Grade Unit: g/tIntercept: 2.5 mView all detailsHide details
Identity
- Hole ID
- DLM26-1297AW
- Project
- Detour Lake
- Commodity
- gold
- Region
- canada
- Reported Region
- canada
- Ticker
- AEM
Geometry
- Grade
- 13.5
- Grade Unit
- g/t
- Intercept
- 2.5 m
- True Width
- 2.5 m
- From
- 629 m
- To
- 632 m
- Hole Depth
- 1257 m
- Intercept Depth
- 564 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- DLM26-1297AW:629-632
Location
- Location
- West Extension
- Easting
- 586435
- Northing
- 5542230
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 296 m
- Azimuth
- 181 °
- Dip
- -67 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept extends the known mineralization significantly to the west, indicating potential for resource expansion.
Positive factors
- High-grade intercept extending underground mineral potential to the west.
Evidence · table
“13.5”
Context: DLM26-1297AW
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 13.5 g/t is well above the deposit-type norm for an open-pit gold project.
Evidence · table
“13.5”
Context: DLM26-1297AW
Step-Out Extensionpositive
Mineralization extended beyond the previously known limit.
Why it applies: Mineralization extended approximately 1.0 kilometre west of the resource-pit outline.
Evidence · text
“approximately 1.0 kilometre west of the resource-pit outline”
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“2.5”
Context: DLM26-1297AW
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
DLM26-1290Detour Lake · goldGrade: 20.8Grade Unit: g/tIntercept: 4.8 mView all detailsHide details
Identity
- Hole ID
- DLM26-1290
- Project
- Detour Lake
- Commodity
- gold
- Region
- canada
- Reported Region
- canada
- Ticker
- AEM
Geometry
- Grade
- 20.8
- Grade Unit
- g/t
- Intercept
- 4.8 m
- True Width
- 4.8 m
- From
- 977.6 m
- To
- 983 m
- Hole Depth
- 1152 m
- Intercept Depth
- 836 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- DLM26-1290:977.6-983
Location
- Location
- West Extension
- Easting
- 584833
- Northing
- 5542350
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 296 m
- Azimuth
- 185 °
- Dip
- -60 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This exceptional high-grade intercept is a very strong positive, extending mineralization significantly to the west and indicating strong potential for resource expansion.
Positive factors
- Exceptional high-grade intercept extending underground mineral potential significantly to the west.
Evidence · table
“20.8”
Context: DLM26-1290
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 20.8 g/t is well above the deposit-type norm for an open-pit gold project.
Evidence · table
“20.8”
Context: DLM26-1290
Step-Out Extensionpositive
Mineralization extended beyond the previously known limit.
Why it applies: Mineralization extended approximately 2.3 kilometres west of the resource-pit outline.
Evidence · text
“approximately 2.3 kilometres west of the resource-pit outline”
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“4.8”
Context: DLM26-1290
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-915W7Upper Beaver · goldGrade: 8.4Grade Unit: g/tIntercept: 6.8 mView all detailsHide details
Identity
- Hole ID
- KLUB26-915W7
- Project
- Upper Beaver
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 8.4
- Grade Unit
- g/t
- Intercept
- 6.8 m
- True Width
- 6.8 m
- From
- 621.7 m
- To
- 629.1 m
- Hole Depth
- 680 m
- Intercept Depth
- 558 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-915W7:621.7-629.1
Location
- Location
- Zone 107
- Easting
- 591844
- Northing
- 5336055
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 302 m
- Azimuth
- 150 °
- Dip
- -69 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade gold intercept with copper supports the validation of the mineral resource model at Upper Beaver.
Positive factors
- High-grade gold intercept with associated copper, validating the mineral resource model.
Evidence · table
“8.4”
Context: KLUB26-915W7
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“6.8”
Context: KLUB26-915W7
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-915W7Upper Beaver · copperGrade: 0.1Grade Unit: %Intercept: 6.8 mView all detailsHide details
Identity
- Hole ID
- KLUB26-915W7
- Project
- Upper Beaver
- Commodity
- copper
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 0.1
- Grade Unit
- %
- Intercept
- 6.8 m
- True Width
- 6.8 m
- From
- 621.7 m
- To
- 629.1 m
- Hole Depth
- 680 m
- Intercept Depth
- 558 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-915W7:621.7-629.1
Location
- Location
- Zone 107
- Easting
- 591844
- Northing
- 5336055
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 302 m
- Azimuth
- 150 °
- Dip
- -69 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This copper intercept, while low grade, is associated with a significant gold intercept, contributing to the overall understanding of the deposit.
Positive factors
- Associated copper mineralization with gold intercept.
Evidence · table
“0.10”
Context: KLUB26-915W7
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“6.8”
Context: KLUB26-915W7
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-915W7Upper Beaver · goldGrade: 17.4Grade Unit: g/tIntercept: 1.5 mView all detailsHide details
Identity
- Hole ID
- KLUB26-915W7
- Project
- Upper Beaver
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 17.4
- Grade Unit
- g/t
- Intercept
- 1.5 m
- True Width
- 1.5 m
- From
- 627.5 m
- To
- 629.1 m
- Hole Depth
- 680 m
- Intercept Depth
- 561 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-915W7:627.5-629.1
Location
- Location
- Zone 107
- Easting
- 591844
- Northing
- 5336055
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 302 m
- Azimuth
- 150 °
- Dip
- -69 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This exceptional high-grade sub-interval further confirms strong mineralization in Zone 107.
Positive factors
- Exceptional high-grade gold intercept within a broader zone.
Evidence · table
“17.4”
Context: KLUB26-915W7
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 17.4 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“17.4”
Context: KLUB26-915W7
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“1.5”
Context: KLUB26-915W7
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-915W7Upper Beaver · copperGrade: 0.31Grade Unit: %Intercept: 1.5 mView all detailsHide details
Identity
- Hole ID
- KLUB26-915W7
- Project
- Upper Beaver
- Commodity
- copper
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 0.31
- Grade Unit
- %
- Intercept
- 1.5 m
- True Width
- 1.5 m
- From
- 627.5 m
- To
- 629.1 m
- Hole Depth
- 680 m
- Intercept Depth
- 561 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-915W7:627.5-629.1
Location
- Location
- Zone 107
- Easting
- 591844
- Northing
- 5336055
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 302 m
- Azimuth
- 150 °
- Dip
- -69 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This higher-grade copper sub-interval adds to the polymetallic nature of the deposit.
Positive factors
- Higher-grade copper within a gold intercept.
Evidence · table
“0.31”
Context: KLUB26-915W7
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“1.5”
Context: KLUB26-915W7
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-917W5Upper Beaver · goldGrade: 8.3Grade Unit: g/tIntercept: 4.5 mView all detailsHide details
Identity
- Hole ID
- KLUB26-917W5
- Project
- Upper Beaver
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 8.3
- Grade Unit
- g/t
- Intercept
- 4.5 m
- True Width
- 4.5 m
- From
- 727 m
- To
- 731.5 m
- Hole Depth
- 768 m
- Intercept Depth
- 682 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-917W5:727-731.5
Location
- Location
- Zone 107
- Easting
- 591783
- Northing
- 5336010
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 304 m
- Azimuth
- 130 °
- Dip
- -75 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade gold intercept with copper supports the validation of the mineral resource model at Upper Beaver.
Positive factors
- High-grade gold intercept with associated copper, validating the mineral resource model.
Evidence · table
“8.3”
Context: KLUB26-917W5
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“4.5”
Context: KLUB26-917W5
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-917W5Upper Beaver · copperGrade: 0.26Grade Unit: %Intercept: 4.5 mView all detailsHide details
Identity
- Hole ID
- KLUB26-917W5
- Project
- Upper Beaver
- Commodity
- copper
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 0.26
- Grade Unit
- %
- Intercept
- 4.5 m
- True Width
- 4.5 m
- From
- 727 m
- To
- 731.5 m
- Hole Depth
- 768 m
- Intercept Depth
- 682 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-917W5:727-731.5
Location
- Location
- Zone 107
- Easting
- 591783
- Northing
- 5336010
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 304 m
- Azimuth
- 130 °
- Dip
- -75 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This copper intercept, while low grade, is associated with a significant gold intercept, contributing to the overall understanding of the deposit.
Positive factors
- Associated copper mineralization with gold intercept.
Evidence · table
“0.26”
Context: KLUB26-917W5
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“4.5”
Context: KLUB26-917W5
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-917W5Upper Beaver · goldGrade: 12Grade Unit: g/tIntercept: 5.6 mView all detailsHide details
Identity
- Hole ID
- KLUB26-917W5
- Project
- Upper Beaver
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 12
- Grade Unit
- g/t
- Intercept
- 5.6 m
- True Width
- 5.6 m
- From
- 736.3 m
- To
- 742 m
- Hole Depth
- 768 m
- Intercept Depth
- 691 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-917W5:736.3-742
Location
- Location
- Zone 107
- Easting
- 591783
- Northing
- 5336010
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 304 m
- Azimuth
- 130 °
- Dip
- -75 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade gold intercept with copper supports the validation of the mineral resource model at Upper Beaver.
Positive factors
- High-grade gold intercept with associated copper, validating the mineral resource model.
Evidence · table
“12.0”
Context: KLUB26-917W5
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 12 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“12.0”
Context: KLUB26-917W5
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“5.6”
Context: KLUB26-917W5
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-917W5Upper Beaver · copperGrade: 0.55Grade Unit: %Intercept: 5.6 mView all detailsHide details
Identity
- Hole ID
- KLUB26-917W5
- Project
- Upper Beaver
- Commodity
- copper
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 0.55
- Grade Unit
- %
- Intercept
- 5.6 m
- True Width
- 5.6 m
- From
- 736.3 m
- To
- 742 m
- Hole Depth
- 768 m
- Intercept Depth
- 691 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-917W5:736.3-742
Location
- Location
- Zone 107
- Easting
- 591783
- Northing
- 5336010
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 304 m
- Azimuth
- 130 °
- Dip
- -75 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This higher-grade copper sub-interval adds to the polymetallic nature of the deposit.
Positive factors
- Higher-grade copper within a gold intercept.
Evidence · table
“0.55”
Context: KLUB26-917W5
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“5.6”
Context: KLUB26-917W5
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-917W5Upper Beaver · goldGrade: 28.8Grade Unit: g/tIntercept: 1.6 mView all detailsHide details
Identity
- Hole ID
- KLUB26-917W5
- Project
- Upper Beaver
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 28.8
- Grade Unit
- g/t
- Intercept
- 1.6 m
- True Width
- 1.6 m
- From
- 738.8 m
- To
- 740.4 m
- Hole Depth
- 768 m
- Intercept Depth
- 692 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-917W5:738.8-740.4
Location
- Location
- Zone 107
- Easting
- 591783
- Northing
- 5336010
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 304 m
- Azimuth
- 130 °
- Dip
- -75 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This exceptional high-grade sub-interval further confirms strong mineralization in Zone 107.
Positive factors
- Exceptional high-grade gold intercept within a broader zone.
Evidence · table
“28.8”
Context: KLUB26-917W5
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 28.8 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“28.8”
Context: KLUB26-917W5
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“1.6”
Context: KLUB26-917W5
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
KLUB26-917W5Upper Beaver · copperGrade: 1.01Grade Unit: %Intercept: 1.6 mView all detailsHide details
Identity
- Hole ID
- KLUB26-917W5
- Project
- Upper Beaver
- Commodity
- copper
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 1.01
- Grade Unit
- %
- Intercept
- 1.6 m
- True Width
- 1.6 m
- From
- 738.8 m
- To
- 740.4 m
- Hole Depth
- 768 m
- Intercept Depth
- 692 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- KLUB26-917W5:738.8-740.4
Location
- Location
- Zone 107
- Easting
- 591783
- Northing
- 5336010
- CRS
- NAD 1983 UTM Zone 17N
- Elevation
- 304 m
- Azimuth
- 130 °
- Dip
- -75 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade copper sub-interval further enhances the polymetallic nature of the deposit.
Positive factors
- High-grade copper within a gold intercept.
Evidence · table
“1.01”
Context: KLUB26-917W5
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“1.6”
Context: KLUB26-917W5
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
HBM26-481Hope Bay · goldGrade: 18.5Grade Unit: g/tIntercept: 11.3 mView all detailsHide details
Identity
- Hole ID
- HBM26-481
- Project
- Hope Bay
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 18.5
- Grade Unit
- g/t
- Intercept
- 11.3 m
- True Width
- 11.3 m
- From
- 362 m
- To
- 375 m
- Hole Depth
- 635 m
- Intercept Depth
- 328 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- HBM26-481:362-375
Location
- Location
- Patch 7
- Easting
- 435107
- Northing
- 7548039
- CRS
- NAD 1983 UTM Zone 13N
- Elevation
- 38 m
- Azimuth
- 68 °
- Dip
- -71 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This exceptional high-grade intercept from conversion drilling is a strong positive, expected to improve the mineral resource estimate.
Positive factors
- Exceptional high-grade intercept from conversion drilling, contributing positively to the mineral resource estimate.
Evidence · table
“18.5”
Context: HBM26-481
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 18.5 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“18.5”
Context: HBM26-481
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“11.3”
Context: HBM26-481
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
HBM26-466Hope Bay · goldGrade: 13.7Grade Unit: g/tIntercept: 15.4 mView all detailsHide details
Identity
- Hole ID
- HBM26-466
- Project
- Hope Bay
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 13.7
- Grade Unit
- g/t
- Intercept
- 15.4 m
- True Width
- 15.4 m
- From
- 708 m
- To
- 726.9 m
- Hole Depth
- 831 m
- Intercept Depth
- 609 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- HBM26-466:708-726.9
Location
- Location
- Patch 7
- Easting
- 434650
- Northing
- 7548666
- CRS
- NAD 1983 UTM Zone 13N
- Elevation
- 26 m
- Azimuth
- 70 °
- Dip
- -70 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept from conversion drilling is a strong positive, expected to improve the mineral resource estimate.
Positive factors
- High-grade intercept from conversion drilling, contributing positively to the mineral resource estimate.
Evidence · table
“13.7”
Context: HBM26-466
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 13.7 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“13.7”
Context: HBM26-466
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“15.4”
Context: HBM26-466
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
HBM26-478AHope Bay · goldGrade: 15.2Grade Unit: g/tIntercept: 15.6 mView all detailsHide details
Identity
- Hole ID
- HBM26-478A
- Project
- Hope Bay
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 15.2
- Grade Unit
- g/t
- Intercept
- 15.6 m
- True Width
- 15.6 m
- From
- 977 m
- To
- 998.4 m
- Hole Depth
- 1125 m
- Intercept Depth
- 710 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- HBM26-478A:977-998.4
Location
- Location
- Patch 7
- Easting
- 434334
- Northing
- 7548811
- CRS
- NAD 1983 UTM Zone 13N
- Elevation
- 51 m
- Azimuth
- 77 °
- Dip
- -63 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This exceptional high-grade intercept from conversion drilling is a strong positive, expected to improve the mineral resource estimate.
Positive factors
- Exceptional high-grade intercept from conversion drilling, contributing positively to the mineral resource estimate.
Evidence · table
“15.2”
Context: HBM26-478A
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 15.2 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“15.2”
Context: HBM26-478A
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“15.6”
Context: HBM26-478A
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
HBM26-469Hope Bay · goldGrade: 31.6Grade Unit: g/tIntercept: 3.8 mView all detailsHide details
Identity
- Hole ID
- HBM26-469
- Project
- Hope Bay
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 31.6
- Grade Unit
- g/t
- Intercept
- 3.8 m
- True Width
- 3.8 m
- From
- 1172 m
- To
- 1176 m
- Hole Depth
- 1246 m
- Intercept Depth
- 852 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- HBM26-469:1172-1176
Location
- Location
- Patch 7
- Easting
- 434279
- Northing
- 7548409
- CRS
- NAD 1983 UTM Zone 13N
- Elevation
- 38 m
- Azimuth
- 57 °
- Dip
- -57 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This exceptional high-grade intercept at depth is a significant positive exploration result, indicating strong potential for resource expansion.
Positive factors
- Exceptional high-grade intercept in one of the deepest intersections of the Patch 7 zone.
Evidence · table
“31.6”
Context: HBM26-469
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 31.6 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“31.6”
Context: HBM26-469
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“3.8”
Context: HBM26-469
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
HBM26-464Hope Bay · goldGrade: 6.7Grade Unit: g/tIntercept: 8.9 mView all detailsHide details
Identity
- Hole ID
- HBM26-464
- Project
- Hope Bay
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 6.7
- Grade Unit
- g/t
- Intercept
- 8.9 m
- True Width
- 8.9 m
- From
- 155 m
- To
- 167 m
- Hole Depth
- 413 m
- Intercept Depth
- 129 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- HBM26-464:155-167
Location
- Location
- Suluk
- Easting
- 434720
- Northing
- 7549517
- CRS
- NAD 1983 UTM Zone 13N
- Elevation
- 26 m
- Azimuth
- 104 °
- Dip
- -51 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept indicates potential for resource expansion at shallow depths near planned infrastructure.
Positive factors
- Good grade and width, demonstrating potential for mineral resource expansion at shallow depths.
Evidence · table
“6.7”
Context: HBM26-464
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“8.9”
Context: HBM26-464
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
ML425-8846-D15Meliadine · goldGrade: 10.9Grade Unit: g/tIntercept: 6.6 mView all detailsHide details
Identity
- Hole ID
- ML425-8846-D15
- Project
- Meliadine
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 10.9
- Grade Unit
- g/t
- Intercept
- 6.6 m
- True Width
- 6.6 m
- From
- 171.6 m
- To
- 178.5 m
- Hole Depth
- 334 m
- Intercept Depth
- 694 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- ML425-8846-D15:171.6-178.5
Location
- Location
- Tiriganiaq
- Easting
- 538846
- Northing
- 6988969
- CRS
- NAD 1983 UTM Zone 14N
- Elevation
- -493 m
- Azimuth
- 163 °
- Dip
- -57 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept extends the known mineralization at depth, indicating potential for resource expansion.
Positive factors
- High-grade intercept extending mineralization in the western deep extension of Tiriganiaq.
Evidence · table
“10.9”
Context: ML425-8846-D15
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 10.9 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“10.9”
Context: ML425-8846-D15
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“6.6”
Context: ML425-8846-D15
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
ML425-10071-D9Meliadine · goldGrade: 9Grade Unit: g/tIntercept: 4.9 mView all detailsHide details
Identity
- Hole ID
- ML425-10071-D9
- Project
- Meliadine
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 9
- Grade Unit
- g/t
- Intercept
- 4.9 m
- True Width
- 4.9 m
- From
- 251.1 m
- To
- 256 m
- Hole Depth
- 422 m
- Intercept Depth
- 663 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- ML425-10071-D9:251.1-256
Location
- Location
- Tiriganiaq
- Easting
- 540071
- Northing
- 6989004
- CRS
- NAD 1983 UTM Zone 14N
- Elevation
- -432 m
- Azimuth
- 176 °
- Dip
- -47 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept extends mineralization north of existing resources, indicating potential for resource expansion.
Positive factors
- High-grade intercept approximately 150 metres north of mineral resources.
Evidence · table
“9.0”
Context: ML425-10071-D9
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“4.9”
Context: ML425-10071-D9
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
ML425-9408-D20Meliadine · goldGrade: 11.3Grade Unit: g/tIntercept: 7.7 mView all detailsHide details
Identity
- Hole ID
- ML425-9408-D20
- Project
- Meliadine
- Commodity
- gold
- Region
- canada_nu
- Reported Region
- canada_nu
- Ticker
- AEM
Geometry
- Grade
- 11.3
- Grade Unit
- g/t
- Intercept
- 7.7 m
- True Width
- 7.7 m
- From
- 401 m
- To
- 408.7 m
- Hole Depth
- 621 m
- Intercept Depth
- 744 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- ML425-9408-D20:401-408.7
Location
- Location
- Wesmeg N
- Easting
- 539408
- Northing
- 6988922
- CRS
- NAD 1983 UTM Zone 14N
- Elevation
- -424 m
- Azimuth
- 169 °
- Dip
- -50 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept confirms the depth potential of the Wesmeg North deposit.
Positive factors
- High-grade intercept demonstrating depth potential of mineralization.
Evidence · table
“11.3”
Context: ML425-9408-D20
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 11.3 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“11.3”
Context: ML425-9408-D20
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“7.7”
Context: ML425-9408-D20
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
ML425-9408-D1CMeliadine · goldGrade: 10.1Grade Unit: g/tIntercept: 3 mView all detailsHide details
Identity
- Hole ID
- ML425-9408-D1C
- Project
- Meliadine
- Commodity
- gold
- Region
- australia
- Reported Region
- australia
- Ticker
- AEM
Geometry
- Grade
- 10.1
- Grade Unit
- g/t
- Intercept
- 3 m
- True Width
- 3 m
- From
- 401.7 m
- To
- 405 m
- Hole Depth
- 742 m
- Intercept Depth
- 855 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- ML425-9408-D1C:401.7-405
Location
- Location
- Wesmeg N
- Easting
- 539408
- Northing
- 6988922
- CRS
- NAD 1983 UTM Zone 14N
- Elevation
- -425 m
- Azimuth
- 202 °
- Dip
- -73 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept confirms the depth potential of the Wesmeg North deposit.
Positive factors
- High-grade intercept demonstrating depth potential of mineralization.
Evidence · table
“10.1”
Context: ML425-9408-D1C
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 10.1 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“10.1”
Context: ML425-9408-D1C
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“3.0”
Context: ML425-9408-D1C
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UDH5161Fosterville · goldGrade: 9.6Grade Unit: g/tIntercept: 10.2 mView all detailsHide details
Identity
- Hole ID
- UDH5161
- Project
- Fosterville
- Commodity
- gold
- Region
- australia
- Reported Region
- australia
- Ticker
- AEM
Geometry
- Grade
- 9.6
- Grade Unit
- g/t
- Intercept
- 10.2 m
- True Width
- 10.2 m
- From
- 381 m
- To
- 391.8 m
- Hole Depth
- 404 m
- Intercept Depth
- 1785 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- UDH5161:381-391.8
Location
- Location
- Cardinal
- Easting
- 1486
- Northing
- 4973
- CRS
- Mine grid including elevation
- Elevation
- 3695 m
- Azimuth
- 82 °
- Dip
- -58 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept extends mineralization down-plunge from existing reserves, indicating potential for resource expansion.
Positive factors
- High-grade intercept down-plunge from mineral reserves.
Evidence · table
“9.6”
Context: UDH5161
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“10.2”
Context: UDH5161
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UDH5162AFosterville · goldGrade: 16.8Grade Unit: g/tIntercept: 4.5 mView all detailsHide details
Identity
- Hole ID
- UDH5162A
- Project
- Fosterville
- Commodity
- gold
- Region
- australia
- Reported Region
- australia
- Ticker
- AEM
Geometry
- Grade
- 16.8
- Grade Unit
- g/t
- Intercept
- 4.5 m
- True Width
- 4.5 m
- From
- 380.1 m
- To
- 385.3 m
- Hole Depth
- 407 m
- Intercept Depth
- 1789 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- UDH5162A:380.1-385.3
Location
- Location
- Cardinal
- Easting
- 1485
- Northing
- 4973
- CRS
- Mine grid including elevation
- Elevation
- 3695 m
- Azimuth
- 92 °
- Dip
- -61 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept indicates potential for mineralization in an area of interest.
Positive factors
- High-grade intercept above a previously interpreted plunging visible-gold trend.
Evidence · table
“16.8”
Context: UDH5162A
Tags used in scoring
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Gold grade of 16.8 g/t is well above the deposit-type norm for an underground gold project.
Evidence · table
“16.8”
Context: UDH5162A
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“4.5”
Context: UDH5162A
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UDH5178Fosterville · goldGrade: 5.1Grade Unit: g/tIntercept: 21.4 mView all detailsHide details
Identity
- Hole ID
- UDH5178
- Project
- Fosterville
- Commodity
- gold
- Region
- australia
- Reported Region
- australia
- Ticker
- AEM
Geometry
- Grade
- 5.1
- Grade Unit
- g/t
- Intercept
- 21.4 m
- True Width
- 21.4 m
- From
- 444.3 m
- To
- 467.9 m
- Hole Depth
- 484 m
- Intercept Depth
- 1845 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- UDH5178:444.3-467.9
Location
- Location
- Swan
- Easting
- 1487
- Northing
- 4945
- CRS
- Mine grid including elevation
- Elevation
- 3690 m
- Azimuth
- 33 °
- Dip
- -56 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept extends mineralization south of existing reserves, indicating potential for resource expansion.
Positive factors
- Good grade over a significant width, extending mineralization south of current mineral reserves.
Evidence · table
“5.1”
Context: UDH5178
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“21.4”
Context: UDH5178
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UDH5188Fosterville · goldGrade: 9.9Grade Unit: g/tIntercept: 6 mView all detailsHide details
Identity
- Hole ID
- UDH5188
- Project
- Fosterville
- Commodity
- gold
- Region
- finland
- Reported Region
- finland
- Ticker
- AEM
Geometry
- Grade
- 9.9
- Grade Unit
- g/t
- Intercept
- 6 m
- True Width
- 6 m
- From
- 272.3 m
- To
- 278.7 m
- Hole Depth
- 341 m
- Intercept Depth
- 810 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- UDH5188:272.3-278.7
Location
- Location
- SW Linker 1
- Easting
- 2978
- Northing
- 12054
- CRS
- Mine grid including elevation
- Elevation
- 4556 m
- Azimuth
- 104 °
- Dip
- -54 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept indicates potential for mineralization near existing reserves.
Positive factors
- High-grade intercept laterally from nearby mineral reserves.
Evidence · table
“9.9”
Context: UDH5188
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“6.0”
Context: UDH5188
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
UDH5214Fosterville · goldGrade: 9.1Grade Unit: g/tIntercept: 4.8 mView all detailsHide details
Identity
- Hole ID
- UDH5214
- Project
- Fosterville
- Commodity
- gold
- Region
- finland
- Reported Region
- finland
- Ticker
- AEM
Geometry
- Grade
- 9.1
- Grade Unit
- g/t
- Intercept
- 4.8 m
- True Width
- 4.8 m
- From
- 182.2 m
- To
- 189.6 m
- Hole Depth
- 209 m
- Intercept Depth
- 477 m
Classification
- Deposit Type
- epithermal
- Program
- exploration
- Sample Type
- drill
- Group ID
- UDH5214:182.2-189.6
Location
- Location
- Curie
- Easting
- 3297
- Northing
- 11802
- CRS
- Mine grid including elevation
- Elevation
- 4650 m
- Azimuth
- 38 °
- Dip
- 8 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This high-grade intercept indicates potential for mineralization immediately above existing reserves.
Positive factors
- High-grade intercept immediately above current mineral reserves.
Evidence · table
“9.1”
Context: UDH5214
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“4.8”
Context: UDH5214
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
SEU25-602Kittila · goldGrade: 5.9Grade Unit: g/tIntercept: 6.7 mView all detailsHide details
Identity
- Hole ID
- SEU25-602
- Project
- Kittila
- Commodity
- gold
- Region
- finland
- Reported Region
- finland
- Ticker
- AEM
Geometry
- Grade
- 5.9
- Grade Unit
- g/t
- Intercept
- 6.7 m
- True Width
- 6.7 m
- From
- 70 m
- To
- 78 m
- Hole Depth
- 211 m
- Intercept Depth
- 961 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- SEU25-602:70-78
Location
- Location
- Main / Seuru
- Easting
- 2558636
- Northing
- 7539798
- CRS
- Finnish Coordinate System KKJ Zone 2
- Elevation
- -738 m
- Azimuth
- 64 °
- Dip
- -2 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept extends the known mineralization, indicating potential for resource expansion.
Positive factors
- Good grade and width, extending Main Zone mineralization northwards.
Evidence · table
“5.9”
Context: SEU25-602
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“6.7”
Context: SEU25-602
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
SEU25-700LKittila · goldGrade: 5.4Grade Unit: g/tIntercept: 6.2 mView all detailsHide details
Identity
- Hole ID
- SEU25-700L
- Project
- Kittila
- Commodity
- gold
- Region
- finland
- Reported Region
- finland
- Ticker
- AEM
Geometry
- Grade
- 5.4
- Grade Unit
- g/t
- Intercept
- 6.2 m
- True Width
- 6.2 m
- From
- 572 m
- To
- 584.6 m
- Hole Depth
- 642 m
- Intercept Depth
- 1401 m
Classification
- Deposit Type
- orogenic
- Program
- exploration
- Sample Type
- drill
- Group ID
- SEU25-700L:572-584.6
Location
- Location
- Main / Seuru
- Easting
- 2558633
- Northing
- 7539697
- CRS
- Finnish Coordinate System KKJ Zone 2
- Elevation
- -726 m
- Azimuth
- 90 °
- Dip
- -66 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- QP Signed
- Yes
Metal Equivalent
- Assumptions Disclosed
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-07-29T00:00:00.000Z
Reasoning: This intercept extends the known mineralization, indicating potential for resource expansion.
Positive factors
- Good grade and width, extending Main Zone mineralization northwards.
Evidence · table
“5.4”
Context: SEU25-700L
Tags used in scoring
True Width Disclosedpositive
Actual thickness perpendicular to structure is stated, not just downhole length.
Why it applies: Actual thickness perpendicular to structure is stated, not just downhole length.
Evidence · table
“6.2”
Context: SEU25-700L
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.