# Atico Reports 2025 Fourth Quarter and Full Year Production Results

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/atico-reports-2025-fourth-quarter-and-full-year-production-results--997ff4af-2bf8-4a82-91b6-18f5f3ec6935

Original source: https://money.tmx.com/en/quote/ATY/news/8856604078456334/atico-reports-2025-fourth-quarter-and-full-year-production-results

Publisher: tmx

Original announcement: 2026-01-22T21:30:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Atico Mining Corporation

- Ticker: ATY

- Exchange: TSX

- Region: Colombia

- Primary commodity: Copper

- Secondary commodities: Gold

- Document categories: Production, Economic study, Resource update, Other

- Extracted: 2026-09-17 11:19:26 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Atico Mining Corporation announced its 2025 fourth quarter and full year production results from its El Roble mine in Colombia, reporting 2.6 million pounds of copper and 2,203 ounces of gold for Q4, and 9.2 million pounds of copper and 8,013 ounces of gold for the full year. The company met its updated production guidance for 2025 and anticipates a significant year-over-year increase in metal production for 2026, with guidance set at 11.5-12.5 million pounds of copper and 9,000-10,000 ounces of gold. Additionally, Atico is progressing permitting for its La Plata project in Ecuador and planning further drilling at El Roble to extend its mine life.

Reasoning: Atico Mining reported strong fourth-quarter 2025 production results, which helped meet its updated full-year guidance, and provided positive production and cost guidance for 2026, indicating an expected increase in metal production. The company is also advancing permitting for its La Plata project and planning further drilling at El Roble.

- Positive factor: Strong Q4 2025 production results

- Positive factor: Met updated production guidance for 2025

- Positive factor: Positive 2026 production and cost guidance

- Positive factor: Advancing permitting at La Plata project

- Positive factor: Planned in-mine and near-mine drilling at El Roble to extend mine life

- Negative factor: Overall decrease in copper and gold production for full year 2025 compared to 2024

- Negative factor: Challenges faced during transitional year migrating to upper parts of the mine

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 28

## Classification and evidence

No classification tags are available.

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### probable

[Link to this fact](https://atlas-extractions.minestarters.com/news/atico-reports-2025-fourth-quarter-and-full-year-production-results--997ff4af-2bf8-4a82-91b6-18f5f3ec6935#fact-resource-facts-25)

El Roble mine · copper

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Roble mine
- Commodity: copper
- Region: colombia
- Reported Region: Colombia
- Ticker: ATY

#### Resource scope

- Estimate type: reserve
- Effective date: 2024-03-12T00:00:00.000Z
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Qualified person names: Thomas Kelly
- Resource group id: resource:a81f5461674d57b3bc0c

#### Resource Data

- Category: probable
- Tonnes: 828000
- Grade: 2.49
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2024-03-12

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-03-12T00:00:00.000Z

#### Dates

- Event date: 2026-01-22T00:00:00.000Z

Reasoning: This fact provides historical reserve information for the El Roble mine, which is relevant context for current production but is not a new resource update.

- Positive factor: Provides context for the mine's current operations

- Positive factor: NI 43-101 compliant and QP signed

- Negative factor: Historical estimate, not a new update

Evidence · text

> El Roble’s reserves estimate, with an effective date of March 12, 2024, includes Proven and Probable mineral reserves of 828 thousand tonnes averaging 2.49% Cu, 2.20 g/t Au and a life of mine until Q1-2027.

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-extractions.minestarters.com/news/atico-reports-2025-fourth-quarter-and-full-year-production-results--997ff4af-2bf8-4a82-91b6-18f5f3ec6935#fact-resource-facts-26)

El Roble mine · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Roble mine
- Commodity: gold
- Region: colombia
- Reported Region: Colombia
- Ticker: ATY

#### Resource scope

- Estimate type: reserve
- Effective date: 2024-03-12T00:00:00.000Z
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Qualified person names: Thomas Kelly
- Resource group id: resource:a81f5461674d57b3bc0c

#### Resource Data

- Category: probable
- Tonnes: 828000
- Grade: 2.2
- Grade Unit: g/t

#### Prior Estimate

- Resource Date: 2024-03-12

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-03-12T00:00:00.000Z

#### Dates

- Event date: 2026-01-22T00:00:00.000Z

Reasoning: This fact provides historical reserve information for the El Roble mine, which is relevant context for current production but is not a new resource update.

- Positive factor: Provides context for the mine's current operations

- Positive factor: NI 43-101 compliant and QP signed

- Negative factor: Historical estimate, not a new update

Evidence · text

> El Roble’s reserves estimate, with an effective date of March 12, 2024, includes Proven and Probable mineral reserves of 828 thousand tonnes averaging 2.49% Cu, 2.20 g/t Au and a life of mine until Q1-2027.

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
