AUGUSTA GOLD ANNOUNCES FEASIBILITY STUDY RESULTS FOR ITS 100% OWNED, CONSTRUCTION-READY REWARD PROJECT; INITIATES STRATEGIC PROCESS

Original announcement by tmx on

Company
Augusta Gold Corp.
Ticker
G
Exchange
TSX
Region
Nevada
Primary commodity
Gold
Secondary commodities
Silver
Document categories
Resource update, Metallurgy
Extracted
2026-09-12 05:58:00 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Augusta Gold announced positive Feasibility Study results for its 100% owned, construction-ready Reward Project in Nevada. The study outlines Proven and Probable Mineral Reserves of 370,000 ounces of gold at 0.86 g/t, with an after-tax NPV5% of US$50.6 million and an IRR of 16.6% at a base case gold price of US$1,975/oz. The project is fully permitted, has an estimated pre-production capital cost of US$89.7 million, an All-in Sustaining Cost of US$1,328 per ounce, and gold recoveries of 79% for the heap leach operation.

Reasoning: Augusta Gold announced positive Feasibility Study results for its construction-ready Reward Project, establishing significant gold reserves, strong economic metrics, and high metallurgical recoveries, while also initiating a strategic review process.

Positive factors

  • Feasibility Study confirms economic viability
  • Project is construction-ready with all permits in place
  • Significant Proven and Probable gold reserves established
  • Positive financial metrics (NPV, IRR, low AISC)
  • High gold recovery for heap leach operation
  • Strategic location in a prolific gold district

Negative factors

  • Initiation of strategic review process may indicate funding challenges or potential sale
  • Loan term extension needed

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 12

Classification and evidence

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: the document describes a heap_leach route ("heap leach")

Extracted facts

Stored fact records: 12. Some facts used in scoring do not have a stored record.

Resource Estimates (11)

provenReward Project · goldTonnes: 5490000Contained Metal: 164Contained Unit: k oz auView all details
Link to this fact

Identity

Project
Reward Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101, sec_sk1300
QP Signed
Yes
Qualified person names
Thomas L. Dyer
Resource group id
resource:903e18417d4aa8d24f23

Resource Data

Category
proven
Tonnes
5490000
Contained Metal
164
Contained Unit
k oz au
Cutoff Grade
0.008
Cutoff Unit
oz Au/ton

Prior Estimate

Resource Date
2024-09-03

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Proven Mineral Reserves confirm a high-confidence, economically viable portion of the construction-ready Reward Project.

Positive factors

  • High confidence category
  • Economic viability demonstrated
  • Part of construction-ready project

Evidence · table

“Proven”

Context: 6,052

probableReward Project · goldTonnes: 8164000Contained Metal: 205Contained Unit: k oz auView all details
Link to this fact

Identity

Project
Reward Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101, sec_sk1300
QP Signed
Yes
Qualified person names
Thomas L. Dyer
Resource group id
resource:63d4cd037cc15b40aadf

Resource Data

Category
probable
Tonnes
8164000
Contained Metal
205
Contained Unit
k oz au
Cutoff Grade
0.008
Cutoff Unit
oz Au/ton

Prior Estimate

Resource Date
2024-09-03

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Probable Mineral Reserves confirm a high-confidence, economically viable portion of the construction-ready Reward Project.

Positive factors

  • High confidence category
  • Economic viability demonstrated
  • Part of construction-ready project

Evidence · table

“Probable”

Context: 8,999

probableReward Project · goldTonnes: 13656000Contained Metal: 370Contained Unit: k oz auView all details
Link to this fact

Identity

Project
Reward Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101, sec_sk1300
QP Signed
Yes
Qualified person names
Thomas L. Dyer
Resource group id
resource:32a5d85b5ef9359a2378

Resource Data

Category
probable
Tonnes
13656000
Contained Metal
370
Contained Unit
k oz au
Cutoff Grade
0.008
Cutoff Unit
oz Au/ton

Prior Estimate

Resource Date
2024-09-03

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Proven and Probable Mineral Reserves confirm a high-confidence, economically viable portion of the construction-ready Reward Project.

Positive factors

  • High confidence category
  • Economic viability demonstrated
  • Part of construction-ready project

Evidence · table

“Proven and Probable”

Context: 15,052

measuredBullfrog Project · goldTonnes: 30130000Grade: 0.544Grade Unit: g/tContained Metal: 526.68Contained Unit: kozView all details
Link to this fact

Identity

Project
Bullfrog Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
resource
Reporting standards
sec_sk1300, ni_43_101
QP Signed
Yes
Qualified person names
Russ Downer, Adam House
Resource group id
resource:b3bcd39d1691676f5020

Resource Data

Category
measured
Tonnes
30130000
Grade
0.544
Grade Unit
g/t
Contained Metal
526.68
Contained Unit
koz

Prior Estimate

Resource Date
2021-12-31

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Measured Mineral Resources provide a high-confidence estimate for the Bullfrog Project, though the estimate is from 2021.

Positive factors

  • High confidence category
  • Large tonnage
  • Supports larger project potential

Negative factors

  • Stale estimate (effective date 2021)

Evidence · table

“Measured”

Context: 30.13

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.7 years before this release

measuredBullfrog Project · silverTonnes: 30130000Grade: 1.35Grade Unit: g/tContained Metal: 1309.13Contained Unit: kozView all details
Link to this fact

Identity

Project
Bullfrog Project
Commodity
silver
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
resource
Reporting standards
sec_sk1300, ni_43_101
QP Signed
Yes
Qualified person names
Russ Downer, Adam House
Resource group id
resource:b3bcd39d1691676f5020

Resource Data

Category
measured
Tonnes
30130000
Grade
1.35
Grade Unit
g/t
Contained Metal
1309.13
Contained Unit
koz

Prior Estimate

Resource Date
2021-12-31

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Measured Mineral Resources provide a high-confidence estimate for the Bullfrog Project, though the estimate is from 2021.

Positive factors

  • High confidence category
  • Large tonnage
  • Supports larger project potential

Negative factors

  • Stale estimate (effective date 2021)

Evidence · table

“Measured”

Context: 30.13

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.7 years before this release

indicatedBullfrog Project · goldTonnes: 40880000Grade: 0.519Grade Unit: g/tContained Metal: 682.61Contained Unit: kozView all details
Link to this fact

Identity

Project
Bullfrog Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
resource
Reporting standards
sec_sk1300, ni_43_101
QP Signed
Yes
Qualified person names
Russ Downer, Adam House
Resource group id
resource:177b9de6cd4ff825ed59

Resource Data

Category
indicated
Tonnes
40880000
Grade
0.519
Grade Unit
g/t
Contained Metal
682.61
Contained Unit
koz

Prior Estimate

Resource Date
2021-12-31

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Indicated Mineral Resources provide a high-confidence estimate for the Bullfrog Project, though the estimate is from 2021.

Positive factors

  • High confidence category
  • Large tonnage
  • Supports larger project potential

Negative factors

  • Stale estimate (effective date 2021)

Evidence · table

“Indicated”

Context: 40.88

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.7 years before this release

indicatedBullfrog Project · silverTonnes: 40880000Grade: 1.18Grade Unit: g/tContained Metal: 1557.49Contained Unit: kozView all details
Link to this fact

Identity

Project
Bullfrog Project
Commodity
silver
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
resource
Reporting standards
sec_sk1300, ni_43_101
QP Signed
Yes
Qualified person names
Russ Downer, Adam House
Resource group id
resource:177b9de6cd4ff825ed59

Resource Data

Category
indicated
Tonnes
40880000
Grade
1.18
Grade Unit
g/t
Contained Metal
1557.49
Contained Unit
koz

Prior Estimate

Resource Date
2021-12-31

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Indicated Mineral Resources provide a high-confidence estimate for the Bullfrog Project, though the estimate is from 2021.

Positive factors

  • High confidence category
  • Large tonnage
  • Supports larger project potential

Negative factors

  • Stale estimate (effective date 2021)

Evidence · table

“Indicated”

Context: 40.88

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.7 years before this release

indicatedBullfrog Project · goldTonnes: 71010000Grade: 0.53Grade Unit: g/tContained Metal: 1209.29Contained Unit: kozView all details
Link to this fact

Identity

Project
Bullfrog Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
resource
Reporting standards
sec_sk1300, ni_43_101
QP Signed
Yes
Qualified person names
Russ Downer, Adam House
Resource group id
resource:63fefd9937038044b7ce

Resource Data

Category
indicated
Tonnes
71010000
Grade
0.53
Grade Unit
g/t
Contained Metal
1209.29
Contained Unit
koz

Prior Estimate

Resource Date
2021-12-31

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Measured and Indicated Mineral Resources provide a high-confidence estimate for the Bullfrog Project, though the estimate is from 2021.

Positive factors

  • High confidence category
  • Large tonnage
  • Supports larger project potential

Negative factors

  • Stale estimate (effective date 2021)

Evidence · table

“Measured and Indicated”

Context: 71.01

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.7 years before this release

indicatedBullfrog Project · silverTonnes: 71010000Grade: 1.26Grade Unit: g/tContained Metal: 2866.62Contained Unit: kozView all details
Link to this fact

Identity

Project
Bullfrog Project
Commodity
silver
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
resource
Reporting standards
sec_sk1300, ni_43_101
QP Signed
Yes
Qualified person names
Russ Downer, Adam House
Resource group id
resource:63fefd9937038044b7ce

Resource Data

Category
indicated
Tonnes
71010000
Grade
1.26
Grade Unit
g/t
Contained Metal
2866.62
Contained Unit
koz

Prior Estimate

Resource Date
2021-12-31

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Measured and Indicated Mineral Resources provide a high-confidence estimate for the Bullfrog Project, though the estimate is from 2021.

Positive factors

  • High confidence category
  • Large tonnage
  • Supports larger project potential

Negative factors

  • Stale estimate (effective date 2021)

Evidence · table

“Measured and Indicated”

Context: 71.01

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.7 years before this release

inferredBullfrog Project · goldTonnes: 16690000Grade: 0.481Grade Unit: g/tContained Metal: 257.9Contained Unit: kozView all details
Link to this fact

Identity

Project
Bullfrog Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
resource
Reporting standards
sec_sk1300, ni_43_101
QP Signed
Yes
Qualified person names
Russ Downer, Adam House
Resource group id
resource:b9abf0491b93528d24f8

Resource Data

Category
inferred
Tonnes
16690000
Grade
0.481
Grade Unit
g/t
Contained Metal
257.9
Contained Unit
koz

Prior Estimate

Resource Date
2021-12-31

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Inferred Mineral Resources add to the Bullfrog Project's overall potential but represent a lower confidence category from an older estimate.

Positive factors

  • Adds to overall resource base
  • Potential for future upgrade

Negative factors

  • Low confidence category
  • Stale estimate (effective date 2021)

Evidence · table

“Inferred”

Context: 16.69

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.7 years before this release

inferredBullfrog Project · silverTonnes: 16690000Grade: 0.96Grade Unit: g/tContained Metal: 515.72Contained Unit: kozView all details
Link to this fact

Identity

Project
Bullfrog Project
Commodity
silver
Region
usa_nv
Reported Region
Nevada
Ticker
G

Resource scope

Estimate type
resource
Reporting standards
sec_sk1300, ni_43_101
QP Signed
Yes
Qualified person names
Russ Downer, Adam House
Resource group id
resource:b9abf0491b93528d24f8

Resource Data

Category
inferred
Tonnes
16690000
Grade
0.96
Grade Unit
g/t
Contained Metal
515.72
Contained Unit
koz

Prior Estimate

Resource Date
2021-12-31

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: Inferred Mineral Resources add to the Bullfrog Project's overall potential but represent a lower confidence category from an older estimate.

Positive factors

  • Adds to overall resource base
  • Potential for future upgrade

Negative factors

  • Low confidence category
  • Stale estimate (effective date 2021)

Evidence · table

“Inferred”

Context: 16.69

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.7 years before this release

Metallurgical Results (1)

Fact 1Reward Project · goldRecovery: 79 %View all details
Link to this fact

Identity

Project
Reward Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada
Ticker
G

Test Work

Program Status
detailed
Processing Route
heap leach

Recovery

Recovery
79 %
Recovery Basis
actual_test

Lab

Laboratory
McClelland labs

Review

Needs Review
No
Historical
No

Dates

Event date
2024-09-05T00:00:00.000Z

Reasoning: The 79% gold recovery for the heap leach operation is excellent and supports the economic viability of the Reward Project.

Positive factors

  • High gold recovery for heap leach
  • Supports project economics

Evidence · text

“Metallurgical testing by McClelland labs has indicated gold recoveries of approximately 81%. Recoveries used for the Reward study are 79% applying a 2% deduction for potential operational losses.”

Tags used in scoring

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: processing_route matches the heap_leach signal

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.