Summary

Borealis Mining has released an updated Preliminary Economic Assessment (PEA) for the Sandman Gold Project in Nevada, showing a base-case NPV of US$203 million and an IRR of 105% at US$2,600 gold. The update highlights strong leverage to gold prices and capital efficiency through the use of existing ADR infrastructure, although the project remains based on inferred mineral resources.

Reasoning: The updated PEA demonstrates substantial economic uplift due to higher gold price assumptions and improved cost modeling, despite using the same underlying inferred resource.

Positive factors

  • Strong base-case economics with US$203M NPV and 105% IRR
  • Significant leverage to gold price (NPV increases to US$696M at US$4,550 gold)
  • Rapid payback period of 1.1 years
  • Utilization of existing ADR infrastructure for capital efficiency

Negative factors

  • Economics based on Inferred resources which are geologically speculative
  • Sensitivity to cost inflation noted

Facts used in scoring: 1

Classification and evidence

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The PEA is based on inferred mineral resources which are considered too speculative for reserves.

Evidence · text

“The PEA includes inferred mineral resources that are considered too speculative geologically”

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The technical report is an updated NI 43-101 Preliminary Economic Assessment.

Evidence · text

“updated NI 43-101 Preliminary Economic Assessment”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Jerod Eastman, an independent Qualified Person, is responsible for and has approved the PEA.

Evidence · text

“prepared by Jerod Eastman, President of DJ 6E Consulting LLC, an independent Qualified Person”

Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

Resource Estimates (1)

inferredSandman Gold Project · goldContained Metal: 340000Contained Unit: ozView all details
Link to this fact

Identity

Project
Sandman Gold Project
Commodity
gold
Region
usa_nv
Reported Region
Nevada, USA
Ticker
BOGO

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Jerod Eastman
Resource group id
resource:2817e911d8e4b4f7b297
Deposit or zone
Sandman
Mining method
open_pit

Resource Data

Category
inferred
Contained Metal
340000
Contained Unit
oz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-19T00:00:00.000Z

Reasoning: The resource is stated as Inferred, which carries high geological uncertainty.

Positive factors

  • Forms the basis of the updated PEA

Negative factors

  • Inferred resources are considered too speculative geologically to be categorized as reserves

Evidence · text

“The PEA includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.