# Ceramic Clay Deposit and Brick Plant Site, Greater Poland

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/ceramic-clay-deposit-and-brick-plant-site-greater-poland--69471cb3-2f98-4414-abff-d4d57ffb9ca3

Original source: https://minemarket.ai/listing/150526b9-43a5-4983-8579-39b585ce0417

Publisher: minemarket

Original announcement: 2026-09-22T00:21:43.991Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Unavailable

- Ticker: Unavailable

- Exchange: Unavailable

- Region: Greater Poland

- Primary commodity: Clay

- Secondary commodities: None reported

- Document categories: Resource update, Economic study

- Extracted: 2026-09-22 00:32:01 UTC

Narrative sentiment: 0.40 · Bullish

## Minestarters Atlas summary

An investment opportunity for a ceramic clay deposit and an idle brick plant in Greater Poland, Poland. The asset includes 6.96 Mt of approved reserves supporting ~29 years of production and an active mining concession valid until 2042.

Reasoning: The document describes a sale opportunity for a ceramic clay deposit and brick plant. While the approved reserves provide a solid 29-year mine life, the total scale relies heavily on unapproved adjacent parcels.

- Positive factor: Long reserve life of ~29 years for approved reserves

- Positive factor: Turnkey engineering study available for plant restart

- Positive factor: Active mining concession valid until 2042

- Positive factor: High-quality clay with low marl and zero lime index

- Negative factor: Significant portion of total clay \(~46%\) is unapproved seller estimate

- Negative factor: Asset is an idle plant requiring restart

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 3

## Classification and evidence

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document reports 6.96 Mt in categories B + C1, which in the Polish classification system corresponds to reserves.

Evidence · text

> Approved reserves: 6.96 Mt in categories B + C1

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component. No prior estimate exists, so every change band is not applicable.

Why it applies: The document refers to a 2007-2008 evaluation and 60 years of work, but does not explicitly label this as a maiden resource; however, it establishes a baseline.

Evidence · text

> investigated over sixty years of geological work

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: A 72-page engineering study exists for a 600 tpd plant, though its specific AACE class is not stated.

Evidence · text

> 72-page engineering study \(2023\) for a 600 tonnes/day brick plant

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### probable

[Link to this fact](https://atlas-extractions.minestarters.com/news/ceramic-clay-deposit-and-brick-plant-site-greater-poland--69471cb3-2f98-4414-abff-d4d57ffb9ca3#fact-resource-facts-0)

Ceramic Clay Deposit, Greater Poland · clay

#### Identity

- Project: Ceramic Clay Deposit, Greater Poland
- Commodity: clay
- Region: greater poland
- Reported Region: Greater Poland

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:0300f4ac4faa1dd53965
- Mining method: other
- Material type: Pliocene ceramic clay

#### Resource Data

- Category: probable
- Tonnes: 6960000

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-22T00:00:00.000Z

Reasoning: Approved reserve quantity is clearly stated.

- Positive factor: Formally approved by Chief State Geologist

Evidence · text

> Approved reserves: 6.96 Mt in categories B + C1

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/ceramic-clay-deposit-and-brick-plant-site-greater-poland--69471cb3-2f98-4414-abff-d4d57ffb9ca3#fact-resource-facts-1)

Ceramic Clay Deposit, Greater Poland · clay

#### Identity

- Project: Ceramic Clay Deposit, Greater Poland
- Commodity: clay
- Region: greater poland
- Reported Region: Greater Poland

#### Resource scope

- Estimate type: resource
- Resource group id: resource:8bbaf74a98bd05d1ad0d
- Mining method: other
- Material type: Pliocene ceramic clay

#### Resource Data

- Category: inferred
- Tonnes: 6000000

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-22T00:00:00.000Z

Reasoning: This is an unverified estimate provided by the seller.

- Negative factor: Not yet formally approved

Evidence · text

> a further ~6 Mt on adjacent parcels within the same ownership \(seller's figure, not yet approved\)

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
