CleanTech to Submit Fluorspar Mine Permit by Year End with State Approval Decision in 2027 at Kentucky Fluorspar District

Original announcement by tmx on

Company
CleanTech Vanadium Mining Corp.
Ticker
CTV
Exchange
TSX
Region
Kentucky
Primary commodity
Fluorspar
Secondary commodities
Zinc, Lead
Document categories
Resource update, Permitting, Other
Extracted
2026-09-15 18:42:15 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

CleanTech Vanadium Mining Corp. announced a regulatory roadmap for its Campbell-Crotser Fluorspar Project in Kentucky, targeting permit submissions by the end of 2026. The company aims for permit issuance in the first half of 2027 and expects to sign its first binding off-take agreement by November 2026.

Reasoning: The company is advancing a permitting roadmap for a strategic fluorspar project, though the timeline to operational readiness is multi-year.

Positive factors

  • clear regulatory roadmap
  • strategic critical mineral positioning
  • appointment of permitting specialist

Negative factors

  • long timeline to permit issuance (2027)
  • reliance on historical data for project scale

Facts used in scoring: 10

Classification and evidence

No QA/QC Disclosurenegative · Story-specific tag

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: The historical resource estimate is explicitly noted as predating modern QA/QC procedures and has not been independently verified.

Evidence · text

“The Historical Estimate predates modern quality-assurance and quality-control ("QA/QC") procedures”

Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

Resource Estimates (6)

indicatedCampbell-Crotser · fluorsparTonnes: 645117Grade: 37.38Grade Unit: %CaF2Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Campbell-Crotser
Commodity
fluorspar
Region
kentucky
Reported Region
Kentucky
Ticker
CTV

Resource scope

Estimate type
resource
QP Signed
No
Resource group id
resource:8d71f51a0cddeb703e05
Deposit or zone
Campbell-Crotser

Resource Data

Category
indicated
Tonnes
645117
Grade
37.38
Grade Unit
%CaF2

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1974-01-01T00:00:00.000Z

Dates

Event date
2026-07-07T00:00:00.000Z

Reasoning: This is a restatement of a 1974 estimate with no modern verification.

Negative factors

  • historical data
  • no QA/QC

Evidence · text

“Indicated 645,117 37.38 3.10 0.92”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 52.5 years before this release

indicatedCampbell-Crotser · zincTonnes: 645117Grade: 3.1Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Campbell-Crotser
Commodity
zinc
Region
kentucky
Reported Region
Kentucky
Ticker
CTV

Resource scope

Estimate type
resource
QP Signed
No
Resource group id
resource:8d71f51a0cddeb703e05
Deposit or zone
Campbell-Crotser

Resource Data

Category
indicated
Tonnes
645117
Grade
3.1
Grade Unit
%

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1974-01-01T00:00:00.000Z

Dates

Event date
2026-07-07T00:00:00.000Z

Reasoning: Historical byproduct grade from 1974.

Negative factors

  • historical data

Evidence · text

“Indicated 645,117 37.38 3.10 0.92”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 52.5 years before this release

indicatedCampbell-Crotser · leadTonnes: 645117Grade: 0.92Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Campbell-Crotser
Commodity
lead
Region
kentucky
Reported Region
Kentucky
Ticker
CTV

Resource scope

Estimate type
resource
QP Signed
No
Resource group id
resource:8d71f51a0cddeb703e05
Deposit or zone
Campbell-Crotser

Resource Data

Category
indicated
Tonnes
645117
Grade
0.92
Grade Unit
%

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1974-01-01T00:00:00.000Z

Dates

Event date
2026-07-07T00:00:00.000Z

Reasoning: Historical byproduct grade from 1974.

Negative factors

  • historical data

Evidence · text

“Indicated 645,117 37.38 3.10 0.92”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 52.5 years before this release

inferredCampbell-Crotser · fluorsparTonnes: 160724Grade: 35.97Grade Unit: %CaF2Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Campbell-Crotser
Commodity
fluorspar
Region
kentucky
Reported Region
Kentucky
Ticker
CTV

Resource scope

Estimate type
resource
QP Signed
No
Resource group id
resource:8b315ff93f7e81108fd9
Deposit or zone
Campbell-Crotser

Resource Data

Category
inferred
Tonnes
160724
Grade
35.97
Grade Unit
%CaF2

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1974-01-01T00:00:00.000Z

Dates

Event date
2026-07-07T00:00:00.000Z

Reasoning: Historical Inferred resource from 1974.

Negative factors

  • historical data
  • low confidence category

Evidence · text

“Inferred 160,724 35.97 3.75 1.25”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 52.5 years before this release

inferredCampbell-Crotser · zincTonnes: 160724Grade: 3.75Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Campbell-Crotser
Commodity
zinc
Region
kentucky
Reported Region
Kentucky
Ticker
CTV

Resource scope

Estimate type
resource
QP Signed
No
Resource group id
resource:8b315ff93f7e81108fd9
Deposit or zone
Campbell-Crotser

Resource Data

Category
inferred
Tonnes
160724
Grade
3.75
Grade Unit
%

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1974-01-01T00:00:00.000Z

Dates

Event date
2026-07-07T00:00:00.000Z

Reasoning: Historical byproduct grade from 1974.

Negative factors

  • historical data

Evidence · text

“Inferred 160,724 35.97 3.75 1.25”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 52.5 years before this release

inferredCampbell-Crotser · leadTonnes: 160724Grade: 1.25Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Campbell-Crotser
Commodity
lead
Region
kentucky
Reported Region
Kentucky
Ticker
CTV

Resource scope

Estimate type
resource
QP Signed
No
Resource group id
resource:8b315ff93f7e81108fd9
Deposit or zone
Campbell-Crotser

Resource Data

Category
inferred
Tonnes
160724
Grade
1.25
Grade Unit
%

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1974-01-01T00:00:00.000Z

Dates

Event date
2026-07-07T00:00:00.000Z

Reasoning: Historical byproduct grade from 1974.

Negative factors

  • historical data

Evidence · text

“Inferred 160,724 35.97 3.75 1.25”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 52.5 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.