Summary

Cobra Resources has completed desorption testing at its Wudinna rare earth project, establishing a measured recovery curve for both the Boland and Head prospects. The tests demonstrate that significant NdPr and HREE recoveries can be maintained even with a 40% reduction in ammonium sulfate concentration or by using acidified groundwater alone.

Reasoning: The desorption test results provide a quantified technical envelope for the project's economics, replacing single-point assumptions with a measured response curve, which significantly de-risks the metallurgical component of the upcoming scoping study.

Positive factors

  • Measured recovery curve established across multiple reagent strengths and pH levels
  • High recovery retention (91%+) when reducing reagent concentration by 40%
  • Significant 'reagent-free' floor established via acidified groundwater
  • In situ recovery (ISR) method identified as cost-effective and amenable to mineralization

Negative factors

  • Head prospect shows significantly lower absolute NdPr recovery compared to Boland
  • Commercial reagent consumption and preferred operating conditions not yet determined

Facts used in scoring: 5

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The project utilizes in situ recovery (ISR) which is a solution-based extraction method.

Evidence · text

“That confinement lets the deposit be worked by in situ recovery (ISR), a method that dissolves the metal underground instead of excavating it.”

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The results are derived from 24-hour desorption tests on bulk composites, which are bench-scale/screening level.

Evidence · text

“Bench-scale testing indicates the mineralization is amenable to ISR recovery techniques.”

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: 2 distinct composites were tested

Extracted facts

Stored fact records: 5. Some facts used in scoring do not have a stored record.

Metallurgical Results (5)

desorption testsWudinna · neodymium and praseodymiumRecovery: 77 %Head Grade: 605Head Grade Unit: ppmView all details
Link to this fact

Identity

Project
Wudinna
Commodity
neodymium and praseodymium
Region
australia_sa
Reported Region
South Australia
Ticker
COBR

Test Work

Program Status
preliminary
Test Type
desorption tests
Processing Route
in situ recovery (ISR)
Sample
Boland composite, 0.5 M AMSUL, pH 3

Recovery

Recovery
77 %
Head Grade
605
Head Grade Unit
ppm

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-17T00:00:00.000Z

Reasoning: High recovery at full strength reagent concentration.

Evidence · text

“At pH 3, the Boland composite recovered 77% of its neodymium and praseodymium (NdPr)”
desorption testsWudinna · neodymium and praseodymiumRecovery: 70 %Head Grade: 605Head Grade Unit: ppmView all details
Link to this fact

Identity

Project
Wudinna
Commodity
neodymium and praseodymium
Region
australia_sa
Reported Region
South Australia
Ticker
COBR

Test Work

Program Status
preliminary
Test Type
desorption tests
Processing Route
in situ recovery (ISR)
Sample
Boland composite, 0.3 M AMSUL, pH 3

Recovery

Recovery
70 %
Head Grade
605
Head Grade Unit
ppm

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-17T00:00:00.000Z

Reasoning: Demonstrates high efficiency in reagent reduction.

Positive factors

  • Maintains 91% of the 0.5M recovery with 40% less reagent

Evidence · text

“Moving to 0.3 M, a 40% reduction in reagent concentration, returned 70% NdPr”
desorption testsWudinna · neodymium and praseodymiumRecovery: 51 %Head Grade: 605Head Grade Unit: ppmView all details
Link to this fact

Identity

Project
Wudinna
Commodity
neodymium and praseodymium
Region
australia_sa
Reported Region
South Australia
Ticker
COBR

Test Work

Program Status
preliminary
Test Type
desorption tests
Processing Route
in situ recovery (ISR)
Sample
Boland composite, acidified groundwater (no AMSUL), pH 3

Recovery

Recovery
51 %
Head Grade
605
Head Grade Unit
ppm

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-17T00:00:00.000Z

Reasoning: Provides a baseline for minimum reagent-free recovery.

Positive factors

  • Establishes a significant recovery floor without external reagent

Evidence · text

“acidified site groundwater with no added AMSUL still recovered 51% NdPr”
desorption testsWudinna · neodymium and praseodymiumRecovery: 40 %Head Grade: 706Head Grade Unit: ppmView all details
Link to this fact

Identity

Project
Wudinna
Commodity
neodymium and praseodymium
Region
australia_sa
Reported Region
South Australia
Ticker
COBR

Test Work

Program Status
preliminary
Test Type
desorption tests
Processing Route
in situ recovery (ISR)
Sample
Head composite, 0.5 M AMSUL, pH 3

Recovery

Recovery
40 %
Head Grade
706
Head Grade Unit
ppm

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-17T00:00:00.000Z

Reasoning: Lower absolute recovery levels at the Head prospect.

Negative factors

  • Significantly lower absolute recovery compared to Boland

Evidence · text

“At 0.5 M and pH 3, the Head prospect recovered 40% NdPr”
desorption testsWudinna · uraniumRecovery: 5 %View all details
Link to this fact

Identity

Project
Wudinna
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
COBR

Test Work

Program Status
preliminary
Test Type
desorption tests
Processing Route
in situ recovery (ISR)
Sample
Boland composite, 0.5 M vs 0.0 M AMSUL, pH 3

Recovery

Recovery
5 %

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-17T00:00:00.000Z

Reasoning: Shows uranium recovery is highly sensitive to reagent presence.

Negative factors

  • Uranium recovery drops significantly when reagent is removed

Evidence · text

“reducing AMSUL from 0.5 M to 0.0 M reduced uranium recovery from 29% to 5%”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.