DPM Metals Extends Chelopech Mine Life to Ten Years; Provides Updated Mineral Reserve and Resource Estimate and Life of Mine Plan

Original announcement by tmx on

Company
DPM Metals Inc.
Ticker
DPM
Exchange
TSX
Region
Bulgaria
Primary commodity
Gold
Secondary commodities
Copper, Silver
Document categories
Resource update, Economic study
Extracted
2026-09-17 19:21:37 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

DPM Metals has announced an updated Mineral Reserve and Resource estimate for its Chelopech mine in Bulgaria, extending the mine life to 10 years. Proven and Probable Mineral Reserves increased by 42% in tonnage, with contained gold up 12% and copper up 10%. Measured and Indicated Mineral Resources, exclusive of reserves, also grew by 20%. The updated life of mine plan supports an average annual production of approximately 160,000 gold equivalent ounces.

Reasoning: The announcement details a substantial update to mineral reserves and resources, leading to a significant extension of the mine life for the Chelopech operation. The increase in both tonnage and contained metal in reserves, coupled with the growth in Measured and Indicated resources and the discovery of a new high-grade zone, are strong positive indicators for the company's future prospects. The study is NI 43-101 compliant with named QPs.

Positive factors

  • Significant increase in Proven and Probable Mineral Reserves by 42% in tonnage and 12% for gold, 10% for copper metal content.
  • Mine life extended to 10 years, supporting sustained average production.
  • Measured and Indicated Mineral Resources, exclusive of reserves, increased by 20% in tonnage.
  • New high-grade discovery (WZD) not yet included in the estimate, indicating future upside.

Negative factors

  • The LOM plan's metal price assumptions are not explicitly compared against spot, 3-year average, or consensus, making conservatism assessment difficult.
  • No explicit price sensitivity analysis for the LOM plan is disclosed.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 39

Classification and evidence

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: A current resource fact retains the disclosed cut-off grade

Extracted facts

Stored fact records: 33. Some facts used in scoring do not have a stored record.

Resource Estimates (33)

provenChelopech mine · goldTonnes: 6977000Grade: 2.14Grade Unit: g/tContained Metal: 479Contained Unit: koz.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:258cb0ccec074065f56f

Resource Data

Category
proven
Tonnes
6977000
Grade
2.14
Grade Unit
g/t
Contained Metal
479
Contained Unit
koz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Proven reserves are the highest confidence category, indicating well-established tonnage and grade. This is part of a new reserve estimate.

Positive factors

  • Proven category represents the highest level of geological confidence.

Evidence · table

“2.14”

Context: 6,977

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

provenChelopech mine · silverTonnes: 6977000Grade: 6.22Grade Unit: g/tContained Metal: 1396Contained Unit: koz.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:258cb0ccec074065f56f

Resource Data

Category
proven
Tonnes
6977000
Grade
6.22
Grade Unit
g/t
Contained Metal
1396
Contained Unit
koz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Proven reserves are the highest confidence category, indicating well-established tonnage and grade. This is part of a new reserve estimate.

Positive factors

  • Proven category represents the highest level of geological confidence.

Evidence · table

“6.22”

Context: 6,977

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

provenChelopech mine · copperTonnes: 6977000Grade: 0.61Grade Unit: %Contained Metal: 94.57Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:258cb0ccec074065f56f

Resource Data

Category
proven
Tonnes
6977000
Grade
0.61
Grade Unit
%
Contained Metal
94.57
Contained Unit
mlbs.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Proven reserves are the highest confidence category, indicating well-established tonnage and grade. This is part of a new reserve estimate.

Positive factors

  • Proven category represents the highest level of geological confidence.

Evidence · table

“0.61”

Context: 6,977

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableChelopech mine · goldTonnes: 16232000Grade: 2.2Grade Unit: g/tContained Metal: 1149Contained Unit: koz.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:ae20fe554071c8d383f6

Resource Data

Category
probable
Tonnes
16232000
Grade
2.2
Grade Unit
g/t
Contained Metal
1149
Contained Unit
koz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Probable reserves represent a good level of confidence, suitable for economic studies. This is part of a new reserve estimate.

Positive factors

  • Probable category indicates good geological confidence and forms the basis for probable reserves.

Evidence · table

“2.20”

Context: 16,232

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableChelopech mine · silverTonnes: 16232000Grade: 9.27Grade Unit: g/tContained Metal: 4836Contained Unit: koz.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:ae20fe554071c8d383f6

Resource Data

Category
probable
Tonnes
16232000
Grade
9.27
Grade Unit
g/t
Contained Metal
4836
Contained Unit
koz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Probable reserves represent a good level of confidence, suitable for economic studies. This is part of a new reserve estimate.

Positive factors

  • Probable category indicates good geological confidence and forms the basis for probable reserves.

Evidence · table

“9.27”

Context: 16,232

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableChelopech mine · copperTonnes: 16232000Grade: 0.6Grade Unit: %Contained Metal: 213.81Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:ae20fe554071c8d383f6

Resource Data

Category
probable
Tonnes
16232000
Grade
0.6
Grade Unit
%
Contained Metal
213.81
Contained Unit
mlbs.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Probable reserves represent a good level of confidence, suitable for economic studies. This is part of a new reserve estimate.

Positive factors

  • Probable category indicates good geological confidence and forms the basis for probable reserves.

Evidence · table

“0.60”

Context: 16,232

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableChelopech mine · goldTonnes: 23209000Grade: 2.18Grade Unit: g/tContained Metal: 1628Contained Unit: koz.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:aea313ca3b19624c84dd

Resource Data

Category
probable
Tonnes
23209000
Grade
2.18
Grade Unit
g/t
Contained Metal
1628
Contained Unit
koz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31
Prior Tonnes
16300000
Prior Contained Metal
1454

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: The total Proven and Probable reserves show a substantial increase in contained gold and tonnage, indicating successful reserve replacement and growth.

Positive factors

  • Significant increase in total contained gold in reserves (12% increase).
  • Total tonnage increased by 42%.

Evidence · table

“2.18”

Context: 23,209

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Growthpositive

Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.

Why it applies: 23209000 against 16300000 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 1628 against 1454 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableChelopech mine · silverTonnes: 23209000Grade: 8.35Grade Unit: g/tContained Metal: 6231Contained Unit: koz.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:aea313ca3b19624c84dd

Resource Data

Category
probable
Tonnes
23209000
Grade
8.35
Grade Unit
g/t
Contained Metal
6231
Contained Unit
koz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31
Prior Tonnes
16300000

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: The total Proven and Probable reserves show a substantial increase in tonnage, which is a positive for the project.

Positive factors

  • Total tonnage increased by 42%.

Evidence · table

“8.35”

Context: 23,209

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Growthpositive

Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.

Why it applies: 23209000 against 16300000 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableChelopech mine · copperTonnes: 23209000Grade: 0.6Grade Unit: %Contained Metal: 308.38Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech mine
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
reserve
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:aea313ca3b19624c84dd

Resource Data

Category
probable
Tonnes
23209000
Grade
0.6
Grade Unit
%
Contained Metal
308.38
Contained Unit
mlbs.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31
Prior Tonnes
16300000
Prior Contained Metal
280.38

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: The total Proven and Probable reserves show a substantial increase in contained copper and tonnage, indicating successful reserve replacement and growth.

Positive factors

  • Significant increase in total contained copper in reserves (10% increase).
  • Total tonnage increased by 42%.

Evidence · table

“0.60”

Context: 23,209

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Growthpositive

Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.

Why it applies: 23209000 against 16300000 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 308.38 against 280.38 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredChelopech · goldTonnes: 8100000Grade: 2.32Grade Unit: g/tContained Metal: 0.604Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:e8be710d66e421890522

Resource Data

Category
measured
Tonnes
8100000
Grade
2.32
Grade Unit
g/t
Contained Metal
0.604
Contained Unit
moz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Measured resources provide high confidence in the estimate, supporting future studies and mine planning. This is part of a new resource estimate.

Positive factors

  • Measured category represents the highest level of geological confidence for resources.

Evidence · table

“2.32”

Context: 8.1

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredChelopech · silverTonnes: 8100000Grade: 8.05Grade Unit: g/tContained Metal: 2.096Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:e8be710d66e421890522

Resource Data

Category
measured
Tonnes
8100000
Grade
8.05
Grade Unit
g/t
Contained Metal
2.096
Contained Unit
moz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Measured resources provide high confidence in the estimate, supporting future studies and mine planning. This is part of a new resource estimate.

Positive factors

  • Measured category represents the highest level of geological confidence for resources.

Evidence · table

“8.05”

Context: 8.1

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredChelopech · copperTonnes: 8100000Grade: 0.72Grade Unit: %Contained Metal: 129Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:e8be710d66e421890522

Resource Data

Category
measured
Tonnes
8100000
Grade
0.72
Grade Unit
%
Contained Metal
129
Contained Unit
mlbs.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Measured resources provide high confidence in the estimate, supporting future studies and mine planning. This is part of a new resource estimate.

Positive factors

  • Measured category represents the highest level of geological confidence for resources.

Evidence · table

“0.72”

Context: 8.1

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · goldTonnes: 7200000Grade: 2.03Grade Unit: g/tContained Metal: 0.47Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:2f1d548fce45793a230b

Resource Data

Category
indicated
Tonnes
7200000
Grade
2.03
Grade Unit
g/t
Contained Metal
0.47
Contained Unit
moz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Indicated resources are a key component for future reserve conversion and economic studies. This is part of a new resource estimate.

Positive factors

  • Indicated category provides reasonable geological confidence for resource estimation.

Evidence · table

“2.03”

Context: 7.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · silverTonnes: 7200000Grade: 10.47Grade Unit: g/tContained Metal: 2.424Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:2f1d548fce45793a230b

Resource Data

Category
indicated
Tonnes
7200000
Grade
10.47
Grade Unit
g/t
Contained Metal
2.424
Contained Unit
moz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Indicated resources are a key component for future reserve conversion and economic studies. This is part of a new resource estimate.

Positive factors

  • Indicated category provides reasonable geological confidence for resource estimation.

Evidence · table

“10.47”

Context: 7.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · copperTonnes: 7200000Grade: 0.56Grade Unit: %Contained Metal: 89Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:2f1d548fce45793a230b

Resource Data

Category
indicated
Tonnes
7200000
Grade
0.56
Grade Unit
%
Contained Metal
89
Contained Unit
mlbs.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: Indicated resources are a key component for future reserve conversion and economic studies. This is part of a new resource estimate.

Positive factors

  • Indicated category provides reasonable geological confidence for resource estimation.

Evidence · table

“0.56”

Context: 7.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · goldTonnes: 15300000Grade: 1.1Grade Unit: moz.Contained Metal: 1.1Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:e123149e570de9dad21f

Resource Data

Category
indicated
Tonnes
15300000
Grade
1.1
Grade Unit
moz.
Contained Metal
1.1
Contained Unit
moz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • This row represents the base case for the Measured & Indicated Resource, which is also presented in the main resource table.

Evidence · table

“1.1”

Context: 15.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · silverTonnes: 15300000Grade: 4.5Grade Unit: moz.Contained Metal: 4.5Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:e123149e570de9dad21f

Resource Data

Category
indicated
Tonnes
15300000
Grade
4.5
Grade Unit
moz.
Contained Metal
4.5
Contained Unit
moz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • This row represents the base case for the Measured & Indicated Resource, which is also presented in the main resource table.

Evidence · table

“4.5”

Context: 15.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · copperTonnes: 15300000Grade: 216Grade Unit: mlbs.Contained Metal: 216Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:e123149e570de9dad21f

Resource Data

Category
indicated
Tonnes
15300000
Grade
216
Grade Unit
mlbs.
Contained Metal
216
Contained Unit
mlbs.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • This row represents the base case for the Measured & Indicated Resource, which is also presented in the main resource table.

Evidence · table

“216”

Context: 15.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredChelopech · goldTonnes: 9100000Grade: 1.96Grade Unit: g/tContained Metal: 0.573Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:8825fdbbfafca8abe2b3

Resource Data

Category
inferred
Tonnes
9100000
Grade
1.96
Grade Unit
g/t
Contained Metal
0.573
Contained Unit
moz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31
Prior Tonnes
2900000
Prior Contained Metal
0.24

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: The substantial increase in Inferred resources suggests good exploration potential and future growth, although it is the lowest confidence category.

Positive factors

  • Inferred resources increased significantly by 6.2 Mt and 333,000 ounces of gold, indicating potential for future conversion.

Evidence · table

“1.96”

Context: 9.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Growthpositive

Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.

Why it applies: 9100000 against 2900000 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 0.573 against 0.24 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredChelopech · silverTonnes: 9100000Grade: 9.38Grade Unit: g/tContained Metal: 2.744Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:8825fdbbfafca8abe2b3

Resource Data

Category
inferred
Tonnes
9100000
Grade
9.38
Grade Unit
g/t
Contained Metal
2.744
Contained Unit
moz.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31
Prior Tonnes
2900000

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: The substantial increase in Inferred resources suggests good exploration potential and future growth, although it is the lowest confidence category.

Positive factors

  • Inferred resources increased significantly by 6.2 Mt and 65 Mlbs of copper, indicating potential for future conversion.

Evidence · table

“9.38”

Context: 9.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Growthpositive

Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.

Why it applies: 9100000 against 2900000 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredChelopech · copperTonnes: 9100000Grade: 0.57Grade Unit: %Contained Metal: 114Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:8825fdbbfafca8abe2b3

Resource Data

Category
inferred
Tonnes
9100000
Grade
0.57
Grade Unit
%
Contained Metal
114
Contained Unit
mlbs.
Cutoff Grade
0
Cutoff Unit
$/t

Prior Estimate

Resource Date
2025-05-31
Prior Tonnes
2900000
Prior Contained Metal
49

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: The substantial increase in Inferred resources suggests good exploration potential and future growth, although it is the lowest confidence category.

Positive factors

  • Inferred resources increased significantly by 6.2 Mt and 65 Mlbs of copper, indicating potential for future conversion.

Evidence · table

“0.57”

Context: 9.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Growthpositive

Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.

Why it applies: 9100000 against 2900000 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 114 against 49 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · goldTonnes: 26700000Grade: 1.4Grade Unit: moz.Contained Metal: 1.4Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:58892ab38b5c7ed5c1c9

Resource Data

Category
indicated
Tonnes
26700000
Grade
1.4
Grade Unit
moz.
Contained Metal
1.4
Contained Unit
moz.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“1.4”

Context: 26.7

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · silverTonnes: 26700000Grade: 6.1Grade Unit: moz.Contained Metal: 6.1Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:58892ab38b5c7ed5c1c9

Resource Data

Category
indicated
Tonnes
26700000
Grade
6.1
Grade Unit
moz.
Contained Metal
6.1
Contained Unit
moz.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“6.1”

Context: 26.7

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · copperTonnes: 26700000Grade: 276Grade Unit: mlbs.Contained Metal: 276Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:58892ab38b5c7ed5c1c9

Resource Data

Category
indicated
Tonnes
26700000
Grade
276
Grade Unit
mlbs.
Contained Metal
276
Contained Unit
mlbs.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“276”

Context: 26.7

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · goldTonnes: 19600000Grade: 1.2Grade Unit: moz.Contained Metal: 1.2Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:59f364bc894ba0c2ab35

Resource Data

Category
indicated
Tonnes
19600000
Grade
1.2
Grade Unit
moz.
Contained Metal
1.2
Contained Unit
moz.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“1.2”

Context: 19.6

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · silverTonnes: 19600000Grade: 5.1Grade Unit: moz.Contained Metal: 5.1Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:59f364bc894ba0c2ab35

Resource Data

Category
indicated
Tonnes
19600000
Grade
5.1
Grade Unit
moz.
Contained Metal
5.1
Contained Unit
moz.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“5.1”

Context: 19.6

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · copperTonnes: 19600000Grade: 242Grade Unit: mlbs.Contained Metal: 242Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:59f364bc894ba0c2ab35

Resource Data

Category
indicated
Tonnes
19600000
Grade
242
Grade Unit
mlbs.
Contained Metal
242
Contained Unit
mlbs.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“242”

Context: 19.6

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · goldTonnes: 12900000Grade: 1Grade Unit: moz.Contained Metal: 1Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:9c582a3fa7e7c3b2ffb6

Resource Data

Category
indicated
Tonnes
12900000
Grade
1
Grade Unit
moz.
Contained Metal
1
Contained Unit
moz.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“1.0”

Context: 12.9

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · silverTonnes: 12900000Grade: 4.2Grade Unit: moz.Contained Metal: 4.2Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:9c582a3fa7e7c3b2ffb6

Resource Data

Category
indicated
Tonnes
12900000
Grade
4.2
Grade Unit
moz.
Contained Metal
4.2
Contained Unit
moz.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“4.2”

Context: 12.9

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · copperTonnes: 12900000Grade: 205Grade Unit: mlbs.Contained Metal: 205Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:9c582a3fa7e7c3b2ffb6

Resource Data

Category
indicated
Tonnes
12900000
Grade
205
Grade Unit
mlbs.
Contained Metal
205
Contained Unit
mlbs.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“205”

Context: 12.9

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · goldTonnes: 11400000Grade: 0.9Grade Unit: moz.Contained Metal: 0.9Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
gold
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:2a1ca3e7f21c10c29d99

Resource Data

Category
indicated
Tonnes
11400000
Grade
0.9
Grade Unit
moz.
Contained Metal
0.9
Contained Unit
moz.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“0.9”

Context: 11.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · silverTonnes: 11400000Grade: 3.9Grade Unit: moz.Contained Metal: 3.9Contained Unit: moz.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
silver
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:2a1ca3e7f21c10c29d99

Resource Data

Category
indicated
Tonnes
11400000
Grade
3.9
Grade Unit
moz.
Contained Metal
3.9
Contained Unit
moz.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“3.9”

Context: 11.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedChelopech · copperTonnes: 11400000Grade: 194Grade Unit: mlbs.Contained Metal: 194Contained Unit: mlbs.View all details
Link to this fact

Identity

Project
Chelopech
Commodity
copper
Region
bulgaria
Reported Region
Bulgaria
Ticker
DPM

Resource scope

Estimate type
resource
Effective date
2025-05-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Malcolm Titley, Nick MacNulty, Ross Overall
Resource group id
resource:2a1ca3e7f21c10c29d99

Resource Data

Category
indicated
Tonnes
11400000
Grade
194
Grade Unit
mlbs.
Contained Metal
194
Contained Unit
mlbs.

Prior Estimate

Resource Date
2025-05-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-05T00:00:00.000Z

Reasoning: This fact is part of a grade/tonnage sensitivity analysis, showing the potential for increased resources at a lower profit indicator, which could be relevant in a higher metal price environment.

Positive factors

  • Demonstrates potential for additional mineralization at lower cut-off values.

Evidence · table

“194”

Context: 11.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.