Falco Resources Announces Updated Feasibility Study for Horne 5 Project, Delivering After-Tax NPV5% C$3.35 Billion, IRR of 28.2% and Cash Flow of C$6.4 Billion at Base Case Gold Price of US$3,600/Oz

Original announcement by tmx on

Company
Falco Resources Ltd.
Ticker
FPC
Exchange
TSX
Region
Québec, Canada
Primary commodity
Gold
Secondary commodities
Silver, Copper, Zinc
Document categories
Resource update, Economic study, Metallurgy
Extracted
2026-09-17 22:45:42 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Falco Resources announced an updated Feasibility Study for its Horne 5 Project, reporting a robust after-tax NPV5% of C$3.35 billion and an IRR of 28.2% at a base case gold price of US$3,600/oz. The study outlines a 15-year underground mine with average annual gold production of 220,300 payable ounces and a low AISC of US$782/oz. This represents a significant improvement over the 2021 FS, with the project benefiting from substantial copper, zinc, and silver by-product credits and strong local support in Québec.

Reasoning: The updated Feasibility Study for the Horne 5 Project demonstrates significantly improved economics with a high after-tax NPV and IRR, low AISC, and a long mine life, positioning it as a major gold producer. The study is NI 43-101 compliant and prepared by independent QPs, indicating high confidence in the results, despite pending final permitting decisions.

Positive factors

  • Robust economics with high after-tax NPV and IRR
  • Significant increase in NPV and IRR compared to prior study
  • Low all-in sustaining costs (AISC) positioning as 1st quartile producer
  • Long mine life of 15 years with potential for further development
  • Strong local support and advanced permitting process
  • NI 43-101 compliant Feasibility Study prepared by independent QPs

Negative factors

  • Permitting not fully complete, with a government decision expected by end of 2026
  • Funding not explicitly stated as fully committed beyond the silver stream agreement

Facts used in scoring: 34

Classification and evidence

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: A current resource fact retains the disclosed cut-off grade

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The source explicitly discloses a revised resource estimate

Evidence · text

“updated mineral resource estimate”

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a mill_cil route ("CIP")

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("gravity")

Extracted facts

Stored fact records: 32. Some facts used in scoring do not have a stored record.

Resource Estimates (28)

measuredHorne 5 Project · goldTonnes: 13049000Grade: 1.3Grade Unit: g/tContained Metal: 0.547Contained Unit: mozView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
gold
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:a92e91891eb67884efde
Mining method
underground
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
13049000
Grade
1.3
Grade Unit
g/t
Contained Metal
0.547
Contained Unit
moz
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.8
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Measured gold resource contributes significantly to the project's overall value and confidence.

Positive factors

  • High confidence Measured category
  • Significant contained gold
  • NI 43-101 compliant and QP signed

Evidence · table

“1.30”

Context: 13.049

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredHorne 5 Project · silverTonnes: 13049000Grade: 14.64Grade Unit: g/tContained Metal: 6.143Contained Unit: mozView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
silver
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:a92e91891eb67884efde
Mining method
underground
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
13049000
Grade
14.64
Grade Unit
g/t
Contained Metal
6.143
Contained Unit
moz
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.8
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Measured silver resource adds significant byproduct value to the project with high confidence.

Positive factors

  • High confidence Measured category
  • Significant contained silver as a byproduct
  • NI 43-101 compliant and QP signed

Evidence · table

“14.64”

Context: 13.049

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredHorne 5 Project · copperTonnes: 13049000Grade: 0.15Grade Unit: %Contained Metal: 44.175Contained Unit: mlbsView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
copper
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:a92e91891eb67884efde
Mining method
underground
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
13049000
Grade
0.15
Grade Unit
%
Contained Metal
44.175
Contained Unit
mlbs
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.8
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Measured copper resource provides additional byproduct value and confidence to the project.

Positive factors

  • High confidence Measured category
  • Significant contained copper as a byproduct
  • NI 43-101 compliant and QP signed

Evidence · table

“0.15”

Context: 13.049

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredHorne 5 Project · zincTonnes: 13049000Grade: 0.65Grade Unit: %Contained Metal: 186.654Contained Unit: mlbsView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
zinc
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:a92e91891eb67884efde
Mining method
underground
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
13049000
Grade
0.65
Grade Unit
%
Contained Metal
186.654
Contained Unit
mlbs
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.8
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Measured zinc resource contributes valuable byproduct credits and enhances project confidence.

Positive factors

  • High confidence Measured category
  • Significant contained zinc as a byproduct
  • NI 43-101 compliant and QP signed

Evidence · table

“0.65”

Context: 13.049

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHorne 5 Project · goldTonnes: 109403000Grade: 1.33Grade Unit: g/tContained Metal: 4.669Contained Unit: mozView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
gold
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:9cf525e3aa16cb9de260
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
109403000
Grade
1.33
Grade Unit
g/t
Contained Metal
4.669
Contained Unit
moz
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.81
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Indicated gold resource represents a substantial portion of the project's gold endowment, supporting its economic viability.

Positive factors

  • Large Indicated gold resource
  • Significant contained gold
  • NI 43-101 compliant and QP signed

Evidence · table

“1.33”

Context: 109.403

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHorne 5 Project · silverTonnes: 109403000Grade: 13.27Grade Unit: g/tContained Metal: 46.678Contained Unit: mozView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
silver
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:9cf525e3aa16cb9de260
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
109403000
Grade
13.27
Grade Unit
g/t
Contained Metal
46.678
Contained Unit
moz
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.81
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Indicated silver resource provides substantial byproduct credits, enhancing the project's overall economics.

Positive factors

  • Large Indicated silver resource
  • Significant contained silver as a byproduct
  • NI 43-101 compliant and QP signed

Evidence · table

“13.27”

Context: 109.403

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHorne 5 Project · copperTonnes: 109403000Grade: 0.15Grade Unit: %Contained Metal: 363.522Contained Unit: mlbsView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
copper
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:9cf525e3aa16cb9de260
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
109403000
Grade
0.15
Grade Unit
%
Contained Metal
363.522
Contained Unit
mlbs
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.81
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Indicated copper resource adds valuable byproduct credits and contributes to the project's overall economic robustness.

Positive factors

  • Large Indicated copper resource
  • Significant contained copper as a byproduct
  • NI 43-101 compliant and QP signed

Evidence · table

“0.15”

Context: 109.403

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHorne 5 Project · zincTonnes: 109403000Grade: 0.7Grade Unit: %Contained Metal: 1693.832Contained Unit: mlbsView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
zinc
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:9cf525e3aa16cb9de260
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
109403000
Grade
0.7
Grade Unit
%
Contained Metal
1693.832
Contained Unit
mlbs
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.81
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Indicated zinc resource provides substantial byproduct credits, further enhancing the project's economic potential.

Positive factors

  • Large Indicated zinc resource
  • Significant contained zinc as a byproduct
  • NI 43-101 compliant and QP signed

Evidence · table

“0.70”

Context: 109.403

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHorne 5 Project · goldTonnes: 30071000Grade: 1.23Grade Unit: g/tContained Metal: 1.189Contained Unit: mozView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
gold
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:420c65357787cf15b270
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
30071000
Grade
1.23
Grade Unit
g/t
Contained Metal
1.189
Contained Unit
moz
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.74
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Inferred gold resource provides future exploration upside but requires further drilling to upgrade confidence.

Positive factors

  • Additional gold resource potential in the Inferred category
  • NI 43-101 compliant and QP signed

Negative factors

  • Inferred resources have lower geological confidence and cannot support economic studies alone

Evidence · table

“1.23”

Context: 30.071

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHorne 5 Project · silverTonnes: 30071000Grade: 17.17Grade Unit: g/tContained Metal: 16.601Contained Unit: mozView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
silver
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:420c65357787cf15b270
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
30071000
Grade
17.17
Grade Unit
g/t
Contained Metal
16.601
Contained Unit
moz
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.74
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Inferred silver resource offers future byproduct potential but requires further validation.

Positive factors

  • Additional silver resource potential in the Inferred category
  • NI 43-101 compliant and QP signed

Negative factors

  • Inferred resources have lower geological confidence and cannot support economic studies alone

Evidence · table

“17.17”

Context: 30.071

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHorne 5 Project · copperTonnes: 30071000Grade: 0.17Grade Unit: %Contained Metal: 110.218Contained Unit: mlbsView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
copper
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:420c65357787cf15b270
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
30071000
Grade
0.17
Grade Unit
%
Contained Metal
110.218
Contained Unit
mlbs
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.74
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Inferred copper resource provides future byproduct potential but requires further validation.

Positive factors

  • Additional copper resource potential in the Inferred category
  • NI 43-101 compliant and QP signed

Negative factors

  • Inferred resources have lower geological confidence and cannot support economic studies alone

Evidence · table

“0.17”

Context: 30.071

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHorne 5 Project · zincTonnes: 30071000Grade: 0.55Grade Unit: %Contained Metal: 363.64Contained Unit: mlbsView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
zinc
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:420c65357787cf15b270
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
30071000
Grade
0.55
Grade Unit
%
Contained Metal
363.64
Contained Unit
mlbs
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.74
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Inferred zinc resource offers future byproduct potential but requires further validation.

Positive factors

  • Additional zinc resource potential in the Inferred category
  • NI 43-101 compliant and QP signed

Negative factors

  • Inferred resources have lower geological confidence and cannot support economic studies alone

Evidence · table

“0.55”

Context: 30.071

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenHorne 5 Project · goldTonnes: 8400000Grade: 1.41Grade Unit: g/tView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
gold
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:9701e50f365dcfc91510
Mining method
underground
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
8400000
Grade
1.41
Grade Unit
g/t
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Proven gold reserve provides the highest level of confidence for the project's economic viability and mine plan.

Positive factors

  • Highest confidence Proven Reserve category
  • QP signed and CIM compliant

Evidence · table

“1.41”

Context: 8.4

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenHorne 5 Project · silverTonnes: 8400000Grade: 15.8Grade Unit: g/tView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
silver
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:9701e50f365dcfc91510
Mining method
underground
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
8400000
Grade
15.8
Grade Unit
g/t
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Proven silver reserve adds high-confidence byproduct value to the project's economic plan.

Positive factors

  • Highest confidence Proven Reserve category
  • Significant contained silver as a byproduct
  • QP signed and CIM compliant

Evidence · table

“15.8”

Context: 8.4

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenHorne 5 Project · copperTonnes: 8400000Grade: 0.17Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
copper
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:9701e50f365dcfc91510
Mining method
underground
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
8400000
Grade
0.17
Grade Unit
%
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Proven copper reserve contributes high-confidence byproduct value to the project's economic plan.

Positive factors

  • Highest confidence Proven Reserve category
  • Significant contained copper as a byproduct
  • QP signed and CIM compliant

Evidence · table

“0.17”

Context: 8.4

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenHorne 5 Project · zincTonnes: 8400000Grade: 0.75Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
zinc
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:9701e50f365dcfc91510
Mining method
underground
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
8400000
Grade
0.75
Grade Unit
%
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Proven zinc reserve adds high-confidence byproduct value to the project's economic plan.

Positive factors

  • Highest confidence Proven Reserve category
  • Significant contained zinc as a byproduct
  • QP signed and CIM compliant

Evidence · table

“0.75”

Context: 8.4

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHorne 5 Project · goldTonnes: 72500000Grade: 1.44Grade Unit: g/tView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
gold
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:f119a6b74532abf2aead
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
72500000
Grade
1.44
Grade Unit
g/t
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Probable gold reserve forms a substantial part of the project's mineable inventory, supporting the economic study.

Positive factors

  • Large Probable Reserve category
  • Significant contained gold
  • QP signed and CIM compliant

Evidence · table

“1.44”

Context: 72.5

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHorne 5 Project · silverTonnes: 72500000Grade: 14Grade Unit: g/tView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
silver
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:f119a6b74532abf2aead
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
72500000
Grade
14
Grade Unit
g/t
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Probable silver reserve adds substantial byproduct value to the project's mine plan.

Positive factors

  • Large Probable Reserve category
  • Significant contained silver as a byproduct
  • QP signed and CIM compliant

Evidence · table

“14.0”

Context: 72.5

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHorne 5 Project · copperTonnes: 72500000Grade: 0.17Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
copper
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:f119a6b74532abf2aead
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
72500000
Grade
0.17
Grade Unit
%
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Probable copper reserve contributes valuable byproduct credits to the project's mine plan.

Positive factors

  • Large Probable Reserve category
  • Significant contained copper as a byproduct
  • QP signed and CIM compliant

Evidence · table

“0.17”

Context: 72.5

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHorne 5 Project · zincTonnes: 72500000Grade: 0.78Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
zinc
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:f119a6b74532abf2aead
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
72500000
Grade
0.78
Grade Unit
%
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Probable zinc reserve adds substantial byproduct credits to the project's mine plan.

Positive factors

  • Large Probable Reserve category
  • Significant contained zinc as a byproduct
  • QP signed and CIM compliant

Evidence · table

“0.78”

Context: 72.5

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHorne 5 Project · goldTonnes: 122452000Grade: 1.32Grade Unit: g/tContained Metal: 5.216Contained Unit: mozView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
gold
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:0d01834f47b23a5af39d
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
122452000
Grade
1.32
Grade Unit
g/t
Contained Metal
5.216
Contained Unit
moz
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.81
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Indicated resource category provides a strong foundation for future reserve conversion and project development. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Large Indicated resource category
  • Significant contained metal equivalent
  • NI 43-101 compliant and QP signed

Evidence · table

“1.32”

Context: 122.452

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHorne 5 Project · silverTonnes: 122452000Grade: 13.42Grade Unit: g/tContained Metal: 52.822Contained Unit: mozView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
silver
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:0d01834f47b23a5af39d
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
122452000
Grade
13.42
Grade Unit
g/t
Contained Metal
52.822
Contained Unit
moz
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.81
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Indicated resource category provides a strong foundation for future reserve conversion and project development. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Large Indicated resource category
  • Significant contained metal equivalent
  • NI 43-101 compliant and QP signed

Evidence · table

“13.42”

Context: 122.452

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHorne 5 Project · copperTonnes: 122452000Grade: 0.15Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
copper
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:0d01834f47b23a5af39d
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
122452000
Grade
0.15
Grade Unit
%
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.81
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Indicated resource category provides a strong foundation for future reserve conversion and project development. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Large Indicated resource category
  • Significant contained metal equivalent
  • NI 43-101 compliant and QP signed

Evidence · table

“0.15”

Context: 122.452

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHorne 5 Project · zincTonnes: 122452000Grade: 0.7Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
zinc
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
resource
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Martin Perron
Resource group id
resource:0d01834f47b23a5af39d
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
122452000
Grade
0.7
Grade Unit
%
Cutoff Grade
75
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Metal Eq. Grade
1.81
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Indicated resource category provides a strong foundation for future reserve conversion and project development. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Large Indicated resource category
  • Significant contained metal equivalent
  • NI 43-101 compliant and QP signed

Evidence · table

“0.70”

Context: 122.452

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHorne 5 Project · goldTonnes: 80900000Grade: 1.44Grade Unit: g/tView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
gold
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:261d6980db25feedbfcf
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
80900000
Grade
1.44
Grade Unit
g/t
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Probable gold reserve forms a substantial part of the project's mineable inventory, supporting the economic study. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Large Probable Reserve category
  • Significant contained gold
  • QP signed and CIM compliant

Evidence · table

“1.44”

Context: 80.9

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHorne 5 Project · silverTonnes: 80900000Grade: 14.1Grade Unit: g/tView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
silver
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:261d6980db25feedbfcf
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
80900000
Grade
14.1
Grade Unit
g/t
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Probable gold reserve forms a substantial part of the project's mineable inventory, supporting the economic study. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Large Probable Reserve category
  • Significant contained gold
  • QP signed and CIM compliant

Evidence · table

“14.1”

Context: 80.9

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHorne 5 Project · copperTonnes: 80900000Grade: 0.17Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
copper
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:261d6980db25feedbfcf
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
80900000
Grade
0.17
Grade Unit
%
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Probable gold reserve forms a substantial part of the project's mineable inventory, supporting the economic study. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Large Probable Reserve category
  • Significant contained gold
  • QP signed and CIM compliant

Evidence · table

“0.17”

Context: 80.9

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHorne 5 Project · zincTonnes: 80900000Grade: 0.77Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
zinc
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Resource scope

Estimate type
reserve
Effective date
2026-06-02T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Geneviève Auger
Resource group id
resource:261d6980db25feedbfcf
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
80900000
Grade
0.77
Grade Unit
%
Cutoff Grade
119
Cutoff Unit
$/t NSR

Prior Estimate

Resource Date
2026-06-02

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The Probable gold reserve forms a substantial part of the project's mineable inventory, supporting the economic study. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Large Probable Reserve category
  • Significant contained gold
  • QP signed and CIM compliant

Evidence · table

“0.77”

Context: 80.9

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (4)

cyanide leaching, CIPHorne 5 Project · goldRecovery: 88.3 %Head Grade: 1.44Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
gold
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Test Work

Program Status
detailed
Test Type
cyanide leaching, CIP
Processing Route
SAG, ball milling, flotation, fine grinding, cyanide leaching, CIP
Grind P80
12 µm

Recovery

Recovery
88.3 %
Recovery Basis
to_payable_metal
Head Grade
1.44
Head Grade Unit
g/t

Lab

Consultant
BBA Inc.

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The high payable gold recovery is a key positive for the project's economics, indicating efficient extraction from the pyrite concentrate.

Positive factors

  • High payable gold recovery
  • Concentrates free of significant deleterious elements
  • Detailed test program supporting feasibility study

Evidence · text

“average payable recoveries are estimated at 88.3% for gold”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the mill_cil signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationHorne 5 Project · copperRecovery: 75.7 %Head Grade: 0.15Head Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
copper
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
SAG, ball milling, flotation, fine grinding, cyanide leaching, CIP
Grind P80
55 µm

Recovery

Recovery
75.7 %
Recovery Basis
to_payable_metal
Head Grade
0.15
Head Grade Unit
%
Conc. Grade
16
Conc. Grade Unit
%

Lab

Consultant
BBA Inc.

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The good payable copper recovery and high-grade concentrate contribute positively to the project's byproduct credits and marketability.

Positive factors

  • Good payable copper recovery
  • High-grade copper concentrate
  • Concentrates free of significant deleterious elements
  • Detailed test program supporting feasibility study

Evidence · text

“average payable recoveries are estimated at 75.7% for copper”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the mill_cil signal

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: 75.7% is below the weak band (80%)

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationHorne 5 Project · zincRecovery: 72.8 %Head Grade: 0.7Head Grade Unit: %View all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
zinc
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
SAG, ball milling, flotation, fine grinding, cyanide leaching, CIP
Grind P80
55 µm

Recovery

Recovery
72.8 %
Recovery Basis
to_payable_metal
Head Grade
0.7
Head Grade Unit
%
Conc. Grade
52
Conc. Grade Unit
%

Lab

Consultant
BBA Inc.

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The good payable zinc recovery and high-grade concentrate enhance the project's byproduct credits and marketability.

Positive factors

  • Good payable zinc recovery
  • High-grade zinc concentrate
  • Concentrates free of significant deleterious elements
  • Detailed test program supporting feasibility study

Evidence · text

“average payable recoveries are estimated at 72.8% for zinc”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the mill_cil signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

cyanide leaching, CIPHorne 5 Project · silverRecovery: 74.2 %Head Grade: 14.1Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Horne 5 Project
Commodity
silver
Region
canada_qc
Reported Region
Québec, Canada
Ticker
FPC

Test Work

Program Status
detailed
Test Type
cyanide leaching, CIP
Processing Route
SAG, ball milling, flotation, fine grinding, cyanide leaching, CIP
Grind P80
12 µm

Recovery

Recovery
74.2 %
Recovery Basis
to_payable_metal
Head Grade
14.1
Head Grade Unit
g/t

Lab

Consultant
BBA Inc.

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: The good payable silver recovery contributes valuable byproduct credits to the project's overall economics.

Positive factors

  • Good payable silver recovery
  • Concentrates free of significant deleterious elements
  • Detailed test program supporting feasibility study

Evidence · text

“average payable recoveries are estimated at 74.2% for silver”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the mill_cil signal

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: 74.2% is below the weak band (75%)

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.