First Majestic Announces Restart Plan for Jerritt Canyon Gold Mine

Original announcement by tmx on

Company
First Majestic Silver Corp.
Ticker
AG
Exchange
TSX
Region
Nevada, USA
Primary commodity
Gold
Secondary commodities
Silver
Document categories
Resource update, Other
Extracted
2026-09-13 11:06:50 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

First Majestic has announced a $75 million restart plan for the Jerritt Canyon Gold Mine in Nevada, targeting production in the second half of 2027. The plan includes a pre-feasibility study to be completed in Q4 2026 and a significant 2026 drilling program. The project is underpinned by a combined Measured, Indicated, and Inferred gold resource of 7.8 million ounces.

Reasoning: The announcement of a $75M restart plan and a large 7.8 Moz gold resource for a permitted mine is highly material for a developer.

Positive factors

  • significant capital commitment for restart
  • large mineral resource base (7.8 Moz total)
  • advanced stage with existing infrastructure
  • pre-feasibility study underway

Negative factors

  • production restart is not until 2027
  • project was previously in care and maintenance

Facts used in scoring: 2

Classification and evidence

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The resource estimate is disclosed in compliance with NI 43-101 standards.

Evidence · text

“disclosed in compliance with National Instrument 43-101”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: David Rowe, CPG, is named as the Qualified Person responsible for the estimates.

Evidence · text

“supervised by, or was reviewed by, David Rowe, CPG... the "Qualified Person"”

Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

Resource Estimates (2)

indicatedJerritt Canyon · goldContained Metal: 4.1Contained Unit: mozView all details
Link to this fact

Identity

Project
Jerritt Canyon
Commodity
gold
Region
usa_nv
Reported Region
Nevada, USA
Ticker
AG

Resource scope

Estimate type
resource
Effective date
2025-12-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
David Rowe
Resource group id
resource:dc1ee00e1df84a539b8d
Deposit or zone
Jerritt Canyon
Mining method
combined
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
indicated
Contained Metal
4.1
Contained Unit
moz
Cutoff Grade
0.43
Cutoff Unit
g/t

Prior Estimate

Resource Date
2025-12-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-04-02T00:00:00.000Z

Reasoning: High confidence M&I resource component of the total endowment.

Positive factors

  • large contained metal

Evidence · text

“Measured and Indicated Mineral Resources are estimated to total 4.1 million ounces of gold”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredJerritt Canyon · goldContained Metal: 3.7Contained Unit: mozView all details
Link to this fact

Identity

Project
Jerritt Canyon
Commodity
gold
Region
usa_nv
Reported Region
Nevada, USA
Ticker
AG

Resource scope

Estimate type
resource
Effective date
2025-12-31T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
David Rowe
Resource group id
resource:654a8ce3aa4ab4ef4948
Deposit or zone
Jerritt Canyon
Mining method
combined
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
inferred
Contained Metal
3.7
Contained Unit
moz
Cutoff Grade
0.43
Cutoff Unit
g/t

Prior Estimate

Resource Date
2025-12-31

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-04-02T00:00:00.000Z

Reasoning: Large inferred component adds to total scale but carries higher geological risk.

Positive factors

  • significant additional resource

Negative factors

  • speculative category

Evidence · text

“additional 3.7 million gold ounces classified as Inferred Mineral Resources”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.