Fortuna intersects 6.0 g/t gold over 24.1 meters at Southern Arc, Diamba Sud Project, Senegal

Original announcement by tmx on

Company
Fortuna Mining Corp.
Ticker
FVI
Exchange
TSX
Region
Senegal
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Drill results, Resource update
Extracted
2026-09-12 04:17:21 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Fortuna Mining Corp. announced new exploration drilling results from its Diamba Sud Gold Project in Senegal, highlighting significant gold intercepts at the Southern Arc, Moungoundi, Area D, Karakara, and Kassasoko deposits. The program, comprising 44 holes totaling 7,518 meters, included both infill and step-out drilling, contributing to an updated and expanded mineral resource. The company noted that Southern Arc remains open at depth and along strike, with further drilling planned to test extensions.

Reasoning: Fortuna Mining Corp. reports strong gold drill results from its Diamba Sud Project, with numerous high-grade intercepts and true width disclosures. The drilling program, which includes both infill and step-out holes, is successfully expanding and upgrading the mineral resource, with Southern Arc remaining open at depth and along strike. Robust QA/QC protocols and QP sign-off enhance confidence in the reported data.

Positive factors

  • High-grade gold intercepts reported across multiple areas.
  • True width of intercepts is consistently disclosed.
  • Drilling successfully contributes to resource growth and confidence.
  • Comprehensive QA/QC procedures are detailed and a Qualified Person has signed off.

Facts used in scoring: 79

Extracted facts

Stored fact records: 79. Some facts used in scoring do not have a stored record.

Drill Results (79)

DSDD652Diamba Sud · goldGrade: 1.1Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
DSDD652
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.1
Grade Unit
g/t
Intercept
6 m
True Width
4.8 m
From
10 m
To
16 m
Hole Depth
109 m
Intercept Depth
10 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD652:10-16
Mining Method
open_pit

Location

Location
Area D
Easting
232784
Northing
1429423
Elevation
180 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.1 g/t gold over 6 m (4.8 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“1.1”

Context: 6

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD652Diamba Sud · goldGrade: 2.7Grade Unit: g/tIntercept: 35 mView all details
Link to this fact

Identity

Hole ID
DSDD652
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.7
Grade Unit
g/t
Intercept
35 m
True Width
28 m
From
21 m
To
56 m
Hole Depth
109 m
Intercept Depth
10 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD652:21-56
Mining Method
open_pit

Location

Location
Area D
Easting
232784
Northing
1429423
Elevation
180 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.7 g/t gold over 35 m (28.0 m true width) is a strong grade and strong width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Strong Continuity

Evidence · table

“2.7”

Context: 35

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 28

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD652Diamba Sud · goldGrade: 13.2Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD652
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
13.2
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
30 m
To
31 m
Hole Depth
109 m
Intercept Depth
10 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD652:30-31
Mining Method
open_pit

Location

Location
Area D
Easting
232784
Northing
1429423
Elevation
180 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 13.2 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“13.2”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD652Diamba Sud · goldGrade: 2.8Grade Unit: g/tIntercept: 47 mView all details
Link to this fact

Identity

Hole ID
DSDD652
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.8
Grade Unit
g/t
Intercept
47 m
True Width
37.6 m
From
60 m
To
107 m
Hole Depth
109 m
Intercept Depth
10 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD652:60-107
Mining Method
open_pit

Location

Location
Area D
Easting
232784
Northing
1429423
Elevation
180 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.8 g/t gold over 47 m (37.6 m true width) is a strong grade and strong width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Strong Continuity

Evidence · table

“2.8”

Context: 47

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 37.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD652Diamba Sud · goldGrade: 12.6Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD652
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
12.6
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
75 m
To
76 m
Hole Depth
109 m
Intercept Depth
10 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD652:75-76
Mining Method
open_pit

Location

Location
Area D
Easting
232784
Northing
1429423
Elevation
180 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 12.6 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“12.6”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD652Diamba Sud · goldGrade: 13.8Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DSDD652
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
13.8
Grade Unit
g/t
Intercept
3 m
True Width
2.4 m
From
91 m
To
94 m
Hole Depth
109 m
Intercept Depth
10 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD652:91-94
Mining Method
open_pit

Location

Location
Area D
Easting
232784
Northing
1429423
Elevation
180 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 13.8 g/t gold over 3 m (2.4 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“13.8”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 2.9Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.9
Grade Unit
g/t
Intercept
3 m
True Width
2.4 m
From
16 m
To
19 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:16-19
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.9 g/t gold over 3 m (2.4 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“2.9”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 1.8Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.8
Grade Unit
g/t
Intercept
7 m
True Width
5.6 m
From
23 m
To
30 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:23-30
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.8 g/t gold over 7 m (5.6 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“1.8”

Context: 7

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 5.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 3.6Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
3.6
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
36 m
To
38 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:36-38
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 3.6 g/t gold over 2 m (1.6 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“3.6”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 46.3Grade Unit: g/tIntercept: 17 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
46.3
Grade Unit
g/t
Intercept
17 m
True Width
13.6 m
From
43 m
To
60 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:43-60
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 46.3 g/t gold over 17 m (13.6 m true width) is a bonanza grade and moderate width for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“46.3”

Context: 17

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 13.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 724Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
724
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
44 m
To
45 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:44-45
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional high-grade sub-interval of 724.0 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“724.0”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 21.5Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
21.5
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
52 m
To
53 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:52-53
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 21.5 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“21.5”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 14.3Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
14.3
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
54 m
To
55 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:54-55
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 14.3 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“14.3”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 1.9Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.9
Grade Unit
g/t
Intercept
4 m
True Width
3.2 m
From
77 m
To
81 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:77-81
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.9 g/t gold over 4 m (3.2 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“1.9”

Context: 4

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD655Diamba Sud · goldGrade: 4.8Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DSDD655
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
4.8
Grade Unit
g/t
Intercept
3 m
True Width
2.4 m
From
105 m
To
108 m
Hole Depth
115 m
Intercept Depth
16 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD655:105-108
Mining Method
open_pit

Location

Location
Area D
Easting
232770
Northing
1429450
Elevation
180 m
Azimuth
90 °
Dip
-65 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 4.8 g/t gold over 3 m (2.4 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“4.8”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD640Diamba Sud · goldGrade: 1.8Grade Unit: g/tIntercept: 12 mView all details
Link to this fact

Identity

Hole ID
DSDD640
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.8
Grade Unit
g/t
Intercept
12 m
True Width
9.6 m
From
6 m
To
18 m
Hole Depth
114 m
Intercept Depth
6 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD640:6-18
Mining Method
open_pit

Location

Location
Karakara
Easting
231773
Northing
1428156
Elevation
150 m
Azimuth
270 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.8 g/t gold over 12 m (9.6 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“1.8”

Context: 12

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 9.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD640Diamba Sud · goldGrade: 0.9Grade Unit: g/tIntercept: 11 mView all details
Link to this fact

Identity

Hole ID
DSDD640
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
0.9
Grade Unit
g/t
Intercept
11 m
True Width
8.8 m
From
22 m
To
33 m
Hole Depth
114 m
Intercept Depth
6 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD640:22-33
Mining Method
open_pit

Location

Location
Karakara
Easting
231773
Northing
1428156
Elevation
150 m
Azimuth
270 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 0.9 g/t gold over 11 m (8.8 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“0.9”

Context: 11

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 8.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD643Diamba Sud · goldGrade: 36.3Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DSDD643
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
36.3
Grade Unit
g/t
Intercept
3 m
True Width
2.4 m
From
48 m
To
51 m
Hole Depth
100 m
Intercept Depth
48 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD643:48-51
Mining Method
open_pit

Location

Location
Karakara
Easting
231631
Northing
1428153
Elevation
154 m
Azimuth
270 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 36.3 g/t gold over 3 m (2.4 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“36.3”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD643Diamba Sud · goldGrade: 105Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD643
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
105
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
50 m
To
51 m
Hole Depth
100 m
Intercept Depth
48 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD643:50-51
Mining Method
open_pit

Location

Location
Karakara
Easting
231631
Northing
1428153
Elevation
154 m
Azimuth
270 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional high-grade sub-interval of 105.0 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“105.0”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD646Diamba Sud · goldGrade: 1.2Grade Unit: g/tIntercept: 4.5 mView all details
Link to this fact

Identity

Hole ID
DSDD646
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.2
Grade Unit
g/t
Intercept
4.5 m
True Width
3.6 m
From
8.5 m
To
13 m
Hole Depth
80 m
Intercept Depth
8.5 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD646:8.5-13
Mining Method
open_pit

Location

Location
Karakara
Easting
231649
Northing
1428206
Elevation
154 m
Azimuth
270 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.2 g/t gold over 4.5 m (3.6 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“1.2”

Context: 4.50

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD646Diamba Sud · goldGrade: 4.2Grade Unit: g/tIntercept: 2.2 mView all details
Link to this fact

Identity

Hole ID
DSDD646
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
4.2
Grade Unit
g/t
Intercept
2.2 m
True Width
1.8 m
From
50.8 m
To
53 m
Hole Depth
80 m
Intercept Depth
8.5 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD646:50.8-53
Mining Method
open_pit

Location

Location
Karakara
Easting
231649
Northing
1428206
Elevation
154 m
Azimuth
270 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 4.2 g/t gold over 2.2 m (1.8 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“4.2”

Context: 2.20

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD646Diamba Sud · goldGrade: 12.6Grade Unit: g/tIntercept: 0.5 mView all details
Link to this fact

Identity

Hole ID
DSDD646
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
12.6
Grade Unit
g/t
Intercept
0.5 m
True Width
0.4 m
From
52.5 m
To
53 m
Hole Depth
80 m
Intercept Depth
8.5 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD646:52.5-53
Mining Method
open_pit

Location

Location
Karakara
Easting
231649
Northing
1428206
Elevation
154 m
Azimuth
270 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 12.6 g/t gold over 0.5 m (0.4 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“12.6”

Context: 0.50

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD648Diamba Sud · goldGrade: 0.6Grade Unit: g/tIntercept: 15.3 mView all details
Link to this fact

Identity

Hole ID
DSDD648
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
0.6
Grade Unit
g/t
Intercept
15.3 m
True Width
12.2 m
From
71 m
To
86.5 m
Hole Depth
92 m
Intercept Depth
71 m

Classification

Program
resource
Sample Type
drill
Group ID
DSDD648:71-86.5
Mining Method
open_pit

Location

Location
Karakara
Easting
231900
Northing
1428171
Elevation
151 m
Azimuth
270 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 0.6 g/t gold over 15.3 m (12.2 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“0.6”

Context: 15.3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 12.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1054Diamba Sud · goldGrade: 1.3Grade Unit: g/tIntercept: 11 mView all details
Link to this fact

Identity

Hole ID
DSR1054
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.3
Grade Unit
g/t
Intercept
11 m
True Width
8.8 m
From
9 m
To
20 m
Hole Depth
95 m
Intercept Depth
9 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1054:9-20
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231749
Northing
1425910
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.3 g/t gold over 11 m (8.8 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“1.3”

Context: 11

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 8.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1054Diamba Sud · goldGrade: 1.3Grade Unit: g/tIntercept: 28 mView all details
Link to this fact

Identity

Hole ID
DSR1054
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.3
Grade Unit
g/t
Intercept
28 m
True Width
22.4 m
From
26 m
To
54 m
Hole Depth
95 m
Intercept Depth
9 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1054:26-54
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231749
Northing
1425910
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.3 g/t gold over 28 m (22.4 m true width) is a moderate grade and strong width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Strong Continuity

Evidence · table

“1.3”

Context: 28

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 22.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1056Diamba Sud · goldGrade: 1Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
DSR1056
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1
Grade Unit
g/t
Intercept
7 m
True Width
5.6 m
From
28 m
To
35 m
Hole Depth
100 m
Intercept Depth
28 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1056:28-35
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231687
Northing
1425937
Elevation
144 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.0 g/t gold over 7 m (5.6 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“1.0”

Context: 7

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 5.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1056Diamba Sud · goldGrade: 1Grade Unit: g/tIntercept: 12 mView all details
Link to this fact

Identity

Hole ID
DSR1056
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1
Grade Unit
g/t
Intercept
12 m
True Width
9.6 m
From
82 m
To
94 m
Hole Depth
100 m
Intercept Depth
28 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1056:82-94
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231687
Northing
1425937
Elevation
144 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.0 g/t gold over 12 m (9.6 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“1.0”

Context: 12

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 9.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1057Diamba Sud · goldGrade: 2Grade Unit: g/tIntercept: 9 mView all details
Link to this fact

Identity

Hole ID
DSR1057
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2
Grade Unit
g/t
Intercept
9 m
True Width
7.2 m
From
30 m
To
39 m
Hole Depth
80 m
Intercept Depth
30 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1057:30-39
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231656
Northing
1425949
Elevation
144 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.0 g/t gold over 9 m (7.2 m true width) is a strong grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“2.0”

Context: 9

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 7.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1057Diamba Sud · goldGrade: 10.9Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSR1057
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
10.9
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
30 m
To
31 m
Hole Depth
80 m
Intercept Depth
30 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1057:30-31
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231656
Northing
1425949
Elevation
144 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 10.9 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“10.9”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1058Diamba Sud · goldGrade: 0.9Grade Unit: g/tIntercept: 13 mView all details
Link to this fact

Identity

Hole ID
DSR1058
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
0.9
Grade Unit
g/t
Intercept
13 m
True Width
10.4 m
From
4 m
To
17 m
Hole Depth
102 m
Intercept Depth
4 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1058:4-17
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231626
Northing
1425906
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 0.9 g/t gold over 13 m (10.4 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“0.9”

Context: 13

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 10.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1058Diamba Sud · goldGrade: 0.8Grade Unit: g/tIntercept: 9 mView all details
Link to this fact

Identity

Hole ID
DSR1058
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
0.8
Grade Unit
g/t
Intercept
9 m
True Width
7.2 m
From
25 m
To
34 m
Hole Depth
102 m
Intercept Depth
4 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1058:25-34
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231626
Northing
1425906
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 0.8 g/t gold over 9 m (7.2 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“0.8”

Context: 9

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 7.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1058Diamba Sud · goldGrade: 3.3Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSR1058
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
3.3
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
59 m
To
61 m
Hole Depth
102 m
Intercept Depth
4 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1058:59-61
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231626
Northing
1425906
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 3.3 g/t gold over 2 m (1.6 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“3.3”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1059Diamba Sud · goldGrade: 0.7Grade Unit: g/tIntercept: 9 mView all details
Link to this fact

Identity

Hole ID
DSR1059
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
0.7
Grade Unit
g/t
Intercept
9 m
True Width
7.2 m
From
12 m
To
21 m
Hole Depth
102 m
Intercept Depth
12 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1059:12-21
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231615
Northing
1425930
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 0.7 g/t gold over 9 m (7.2 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“0.7”

Context: 9

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 7.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1059Diamba Sud · goldGrade: 1.4Grade Unit: g/tIntercept: 15 mView all details
Link to this fact

Identity

Hole ID
DSR1059
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.4
Grade Unit
g/t
Intercept
15 m
True Width
12 m
From
25 m
To
40 m
Hole Depth
102 m
Intercept Depth
12 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1059:25-40
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231615
Northing
1425930
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.4 g/t gold over 15 m (12.0 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“1.4”

Context: 15

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 12

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1060Diamba Sud · goldGrade: 1.2Grade Unit: g/tIntercept: 14 mView all details
Link to this fact

Identity

Hole ID
DSR1060
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.2
Grade Unit
g/t
Intercept
14 m
True Width
11.2 m
From
15 m
To
29 m
Hole Depth
102 m
Intercept Depth
15 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1060:15-29
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231603
Northing
1425947
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.2 g/t gold over 14 m (11.2 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“1.2”

Context: 14

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 11.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1061Diamba Sud · goldGrade: 0.9Grade Unit: g/tIntercept: 30 mView all details
Link to this fact

Identity

Hole ID
DSR1061
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
0.9
Grade Unit
g/t
Intercept
30 m
True Width
24 m
From
27 m
To
57 m
Hole Depth
140 m
Intercept Depth
27 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1061:27-57
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231579
Northing
1425941
Elevation
145 m
Azimuth
150 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 0.9 g/t gold over 30 m (24.0 m true width) is a moderate grade and strong width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Strong Continuity

Evidence · table

“0.9”

Context: 30

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 24

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1063Diamba Sud · goldGrade: 4.8Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSR1063
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
4.8
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
85 m
To
87 m
Hole Depth
100 m
Intercept Depth
85 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1063:85-87
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231544
Northing
1425871
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 4.8 g/t gold over 2 m (1.6 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“4.8”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSR1063Diamba Sud · goldGrade: 3.3Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
DSR1063
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
3.3
Grade Unit
g/t
Intercept
6 m
True Width
4.8 m
From
91 m
To
97 m
Hole Depth
100 m
Intercept Depth
85 m

Classification

Program
resource
Sample Type
drill
Group ID
DSR1063:91-97
Mining Method
open_pit

Location

Location
Kassasoko
Easting
231544
Northing
1425871
Elevation
145 m
Azimuth
150 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 3.3 g/t gold over 6 m (4.8 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“3.3”

Context: 6

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "resource"

DSDD630Diamba Sud · goldGrade: 5.2Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DSDD630
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
5.2
Grade Unit
g/t
Intercept
3 m
True Width
2.4 m
From
58 m
To
61 m
Hole Depth
152 m
Intercept Depth
58 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD630:58-61
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230869
Northing
1426831
Elevation
154 m
Azimuth
90 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 5.2 g/t gold over 3 m (2.4 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“5.2”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD630Diamba Sud · goldGrade: 11.1Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD630
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
11.1
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
60 m
To
61 m
Hole Depth
152 m
Intercept Depth
58 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD630:60-61
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230869
Northing
1426831
Elevation
154 m
Azimuth
90 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 11.1 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“11.1”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD631Diamba Sud · goldGrade: 2.1Grade Unit: g/tIntercept: 13 mView all details
Link to this fact

Identity

Hole ID
DSDD631
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.1
Grade Unit
g/t
Intercept
13 m
True Width
10.4 m
From
12 m
To
25 m
Hole Depth
98 m
Intercept Depth
12 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD631:12-25
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230828
Northing
1426901
Elevation
153 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.1 g/t gold over 13 m (10.4 m true width) is a strong grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“2.1”

Context: 13

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 10.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD631Diamba Sud · goldGrade: 4.2Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
DSDD631
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
4.2
Grade Unit
g/t
Intercept
4 m
True Width
3.2 m
From
34 m
To
38 m
Hole Depth
98 m
Intercept Depth
12 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD631:34-38
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230828
Northing
1426901
Elevation
153 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 4.2 g/t gold over 4 m (3.2 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“4.2”

Context: 4

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD631Diamba Sud · goldGrade: 10.3Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD631
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
10.3
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
35 m
To
36 m
Hole Depth
98 m
Intercept Depth
12 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD631:35-36
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230828
Northing
1426901
Elevation
153 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 10.3 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“10.3”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD631Diamba Sud · goldGrade: 1.7Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
DSDD631
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.7
Grade Unit
g/t
Intercept
5 m
True Width
4 m
From
76 m
To
81 m
Hole Depth
98 m
Intercept Depth
12 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD631:76-81
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230828
Northing
1426901
Elevation
153 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.7 g/t gold over 5 m (4.0 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“1.7”

Context: 5

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD634Diamba Sud · goldGrade: 1.2Grade Unit: g/tIntercept: 14 mView all details
Link to this fact

Identity

Hole ID
DSDD634
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.2
Grade Unit
g/t
Intercept
14 m
True Width
11.2 m
From
60 m
To
74 m
Hole Depth
131 m
Intercept Depth
60 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD634:60-74
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230777
Northing
1426899
Elevation
154 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.2 g/t gold over 14 m (11.2 m true width) is a moderate grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“1.2”

Context: 14

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 11.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD636Diamba Sud · goldGrade: 2.4Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DSDD636
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.4
Grade Unit
g/t
Intercept
3 m
True Width
2.4 m
From
59 m
To
62 m
Hole Depth
100 m
Intercept Depth
59 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD636:59-62
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230916
Northing
1426853
Elevation
154 m
Azimuth
90 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.4 g/t gold over 3 m (2.4 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“2.4”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD639Diamba Sud · goldGrade: 15.8Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
DSDD639
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
15.8
Grade Unit
g/t
Intercept
6 m
True Width
4.8 m
From
16 m
To
22 m
Hole Depth
116 m
Intercept Depth
16 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD639:16-22
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230885
Northing
1426932
Elevation
156 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade intercept of 15.8 g/t gold over 6 m (4.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“15.8”

Context: 6

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD639Diamba Sud · goldGrade: 44.1Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD639
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
44.1
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
17 m
To
19 m
Hole Depth
116 m
Intercept Depth
16 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD639:17-19
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230885
Northing
1426932
Elevation
156 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional high-grade sub-interval of 44.1 g/t gold over 2 m (1.6 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“44.1”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD647Diamba Sud · goldGrade: 5Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD647
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
5
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
94 m
To
96 m
Hole Depth
101 m
Intercept Depth
94 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD647:94-96
Mining Method
open_pit

Location

Location
Moungoundi
Easting
231042
Northing
1426726
Elevation
154 m
Azimuth
270 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 5.0 g/t gold over 2 m (1.6 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“5.0”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD650Diamba Sud · goldGrade: 2.6Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD650
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.6
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
63 m
To
65 m
Hole Depth
86 m
Intercept Depth
63 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD650:63-65
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230870
Northing
1426980
Elevation
157 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.6 g/t gold over 2 m (1.6 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“2.6”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD650Diamba Sud · goldGrade: 2.2Grade Unit: g/tIntercept: 6.6 mView all details
Link to this fact

Identity

Hole ID
DSDD650
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.2
Grade Unit
g/t
Intercept
6.6 m
True Width
5.3 m
From
69.4 m
To
76 m
Hole Depth
86 m
Intercept Depth
63 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD650:69.4-76
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230870
Northing
1426980
Elevation
157 m
Azimuth
90 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.2 g/t gold over 6.6 m (5.3 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“2.2”

Context: 6.6

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 5.3

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD651Diamba Sud · goldGrade: 7.2Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
DSDD651
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
7.2
Grade Unit
g/t
Intercept
5 m
True Width
4 m
From
5 m
To
10 m
Hole Depth
62 m
Intercept Depth
5 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD651:5-10
Mining Method
open_pit

Location

Location
Moungoundi
Easting
231000
Northing
1426752
Elevation
154 m
Azimuth
270 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 7.2 g/t gold over 5 m (4.0 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“7.2”

Context: 5.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD651Diamba Sud · goldGrade: 18.6Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD651
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
18.6
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
8 m
To
9 m
Hole Depth
62 m
Intercept Depth
5 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD651:8-9
Mining Method
open_pit

Location

Location
Moungoundi
Easting
231000
Northing
1426752
Elevation
154 m
Azimuth
270 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 18.6 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“18.6”

Context: 1.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD654Diamba Sud · goldGrade: 7.8Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD654
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
7.8
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
35 m
To
37 m
Hole Depth
81 m
Intercept Depth
35 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD654:35-37
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230666
Northing
1426801
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 7.8 g/t gold over 2 m (1.6 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“7.8”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD654Diamba Sud · goldGrade: 6.2Grade Unit: g/tIntercept: 12 mView all details
Link to this fact

Identity

Hole ID
DSDD654
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
6.2
Grade Unit
g/t
Intercept
12 m
True Width
9.6 m
From
53 m
To
65 m
Hole Depth
81 m
Intercept Depth
35 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD654:53-65
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230666
Northing
1426801
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 6.2 g/t gold over 12 m (9.6 m true width) is a bonanza grade and moderate width for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“6.2”

Context: 12.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 9.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD654Diamba Sud · goldGrade: 16.8Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD654
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
16.8
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
53 m
To
54 m
Hole Depth
81 m
Intercept Depth
35 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD654:53-54
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230666
Northing
1426801
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 16.8 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“16.8”

Context: 1.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD654Diamba Sud · goldGrade: 40.9Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD654
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
40.9
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
55 m
To
56 m
Hole Depth
81 m
Intercept Depth
35 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD654:55-56
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230666
Northing
1426801
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional high-grade sub-interval of 40.9 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“40.9”

Context: 1.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD656Diamba Sud · goldGrade: 3.3Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
DSDD656
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
3.3
Grade Unit
g/t
Intercept
6 m
True Width
4.8 m
From
14 m
To
20 m
Hole Depth
98 m
Intercept Depth
14 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD656:14-20
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230695
Northing
1426824
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 3.3 g/t gold over 6 m (4.8 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“3.3”

Context: 6.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD656Diamba Sud · goldGrade: 10.9Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD656
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
10.9
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
16 m
To
17 m
Hole Depth
98 m
Intercept Depth
14 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD656:16-17
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230695
Northing
1426824
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 10.9 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“10.9”

Context: 1.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD656Diamba Sud · goldGrade: 1.3Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
DSDD656
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.3
Grade Unit
g/t
Intercept
7 m
True Width
5.6 m
From
31 m
To
38 m
Hole Depth
98 m
Intercept Depth
14 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD656:31-38
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230695
Northing
1426824
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.3 g/t gold over 7 m (5.6 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“1.3”

Context: 7.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 5.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD657Diamba Sud · goldGrade: 5.4Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD657
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
5.4
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
77 m
To
79 m
Hole Depth
122 m
Intercept Depth
77 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD657:77-79
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230716
Northing
1426853
Elevation
153 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 5.4 g/t gold over 2 m (1.6 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“5.4”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD657Diamba Sud · goldGrade: 9.3Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD657
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
9.3
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
106 m
To
108 m
Hole Depth
122 m
Intercept Depth
77 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD657:106-108
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230716
Northing
1426853
Elevation
153 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 9.3 g/t gold over 2 m (1.6 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“9.3”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD657Diamba Sud · goldGrade: 17.2Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD657
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
17.2
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
107 m
To
108 m
Hole Depth
122 m
Intercept Depth
77 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD657:107-108
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230716
Northing
1426853
Elevation
153 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 17.2 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“17.2”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD659Diamba Sud · goldGrade: 0.8Grade Unit: g/tIntercept: 8 mView all details
Link to this fact

Identity

Hole ID
DSDD659
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
0.8
Grade Unit
g/t
Intercept
8 m
True Width
6.4 m
From
12 m
To
20 m
Hole Depth
90 m
Intercept Depth
12 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD659:12-20
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230935
Northing
1426799
Elevation
154 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 0.8 g/t gold over 8 m (6.4 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“0.8”

Context: 8

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 6.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD661Diamba Sud · goldGrade: 4Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
DSDD661
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
4
Grade Unit
g/t
Intercept
5 m
True Width
4 m
From
13 m
To
18 m
Hole Depth
103 m
Intercept Depth
13 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD661:13-18
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230820
Northing
1426881
Elevation
154 m
Azimuth
90 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 4.0 g/t gold over 5 m (4.0 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“4.0”

Context: 5

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD661Diamba Sud · goldGrade: 16.3Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSDD661
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
16.3
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
14 m
To
15 m
Hole Depth
103 m
Intercept Depth
13 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD661:14-15
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230820
Northing
1426881
Elevation
154 m
Azimuth
90 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 16.3 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“16.3”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD662Diamba Sud · goldGrade: 7.2Grade Unit: g/tIntercept: 12 mView all details
Link to this fact

Identity

Hole ID
DSDD662
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
7.2
Grade Unit
g/t
Intercept
12 m
True Width
9.6 m
From
42 m
To
54 m
Hole Depth
67 m
Intercept Depth
42 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD662:42-54
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230862
Northing
1426776
Elevation
153 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 7.2 g/t gold over 12 m (9.6 m true width) is a bonanza grade and moderate width for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“7.2”

Context: 12

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 9.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD662Diamba Sud · goldGrade: 27.6Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD662
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
27.6
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
51 m
To
53 m
Hole Depth
67 m
Intercept Depth
42 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD662:51-53
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230862
Northing
1426776
Elevation
153 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 27.6 g/t gold over 2 m (1.6 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“27.6”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD665Diamba Sud · goldGrade: 3.1Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
DSDD665
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
3.1
Grade Unit
g/t
Intercept
7 m
True Width
5.6 m
From
61 m
To
68 m
Hole Depth
74 m
Intercept Depth
61 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD665:61-68
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230963
Northing
1426677
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 3.1 g/t gold over 7 m (5.6 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“3.1”

Context: 7

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 5.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD666Diamba Sud · goldGrade: 1.5Grade Unit: g/tIntercept: 8 mView all details
Link to this fact

Identity

Hole ID
DSDD666
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
1.5
Grade Unit
g/t
Intercept
8 m
True Width
6.4 m
From
10 m
To
18 m
Hole Depth
65 m
Intercept Depth
10 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD666:10-18
Mining Method
open_pit

Location

Location
Moungoundi
Easting
231000
Northing
1426773
Elevation
154 m
Azimuth
270 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 1.5 g/t gold over 8 m (6.4 m true width) is a moderate grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“1.5”

Context: 8

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 6.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD666Diamba Sud · goldGrade: 2Grade Unit: g/tIntercept: 11 mView all details
Link to this fact

Identity

Hole ID
DSDD666
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2
Grade Unit
g/t
Intercept
11 m
True Width
8.8 m
From
30 m
To
41 m
Hole Depth
65 m
Intercept Depth
10 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD666:30-41
Mining Method
open_pit

Location

Location
Moungoundi
Easting
231000
Northing
1426773
Elevation
154 m
Azimuth
270 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.0 g/t gold over 11 m (8.8 m true width) is a strong grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“2.0”

Context: 11

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 8.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSDD667Diamba Sud · goldGrade: 4.9Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSDD667
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
4.9
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
30 m
To
32 m
Hole Depth
85 m
Intercept Depth
30 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSDD667:30-32
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230939
Northing
1426775
Elevation
153 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 4.9 g/t gold over 2 m (1.6 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“4.9”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSR1018Diamba Sud · goldGrade: 2Grade Unit: g/tIntercept: 12 mView all details
Link to this fact

Identity

Hole ID
DSR1018
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2
Grade Unit
g/t
Intercept
12 m
True Width
9.6 m
From
1 m
To
13 m
Hole Depth
102 m
Intercept Depth
1 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSR1018:1-13
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230965
Northing
1426775
Elevation
154 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.0 g/t gold over 12 m (9.6 m true width) is a strong grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“2.0”

Context: 12

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 9.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSR1018Diamba Sud · goldGrade: 2.1Grade Unit: g/tIntercept: 16 mView all details
Link to this fact

Identity

Hole ID
DSR1018
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.1
Grade Unit
g/t
Intercept
16 m
True Width
12.8 m
From
28 m
To
44 m
Hole Depth
102 m
Intercept Depth
1 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSR1018:28-44
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230965
Northing
1426775
Elevation
154 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.1 g/t gold over 16 m (12.8 m true width) is a strong grade and moderate width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Moderate Continuity

Evidence · table

“2.1”

Context: 16

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 12.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSR1018Diamba Sud · goldGrade: 15.7Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSR1018
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
15.7
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
38 m
To
39 m
Hole Depth
102 m
Intercept Depth
1 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSR1018:38-39
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230965
Northing
1426775
Elevation
154 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 15.7 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“15.7”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSR1019Diamba Sud · goldGrade: 9.2Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DSR1019
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
9.2
Grade Unit
g/t
Intercept
2 m
True Width
1.6 m
From
22 m
To
24 m
Hole Depth
60 m
Intercept Depth
22 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSR1019:22-24
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230885
Northing
1426775
Elevation
153 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Exceptional intercept of 9.2 g/t gold over 2 m (1.6 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“9.2”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSR1019Diamba Sud · goldGrade: 16.9Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
DSR1019
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
16.9
Grade Unit
g/t
Intercept
1 m
True Width
0.8 m
From
22 m
To
23 m
Hole Depth
60 m
Intercept Depth
22 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSR1019:22-23
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230885
Northing
1426775
Elevation
153 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: High-grade sub-interval of 16.9 g/t gold over 1 m (0.8 m true width) is a bonanza grade for gold, with true width disclosed.

Positive factors

  • Bonanza Intercept
  • True Width Disclosed

Evidence · table

“16.9”

Context: 1

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 0.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSR1021Diamba Sud · goldGrade: 2.3Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
DSR1021
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.3
Grade Unit
g/t
Intercept
4 m
True Width
3.2 m
From
89 m
To
93 m
Hole Depth
96 m
Intercept Depth
89 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSR1021:89-93
Mining Method
open_pit

Location

Location
Moungoundi
Easting
230962
Northing
1426703
Elevation
152 m
Azimuth
90 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.3 g/t gold over 4 m (3.2 m true width) is a strong grade for gold, with true width disclosed.

Positive factors

  • True Width Disclosed

Evidence · table

“2.3”

Context: 4

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

DSR1022Diamba Sud · goldGrade: 2.2Grade Unit: g/tIntercept: 24 mView all details
Link to this fact

Identity

Hole ID
DSR1022
Project
Diamba Sud
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
FVI

Geometry

Grade
2.2
Grade Unit
g/t
Intercept
24 m
True Width
19.2 m
From
35 m
To
59 m
Hole Depth
102 m
Intercept Depth
35 m

Classification

Program
mixed
Sample Type
drill
Group ID
DSR1022:35-59
Mining Method
open_pit

Location

Location
Moungoundi
Easting
231039
Northing
1426674
Elevation
152 m
Azimuth
270 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Global
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Deleterious

Deleterious Flag
No

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-02-25T00:00:00.000Z

Reasoning: Intercept of 2.2 g/t gold over 24 m (19.2 m true width) is a strong grade and strong width for gold, with true width disclosed.

Positive factors

  • True Width Disclosed
  • Strong Continuity

Evidence · table

“2.2”

Context: 24

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 19.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.