# Galore Drill Commences 2019 2,500 Meter Core Program at Dos Santos Project

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/galore-drill-commences-2019-2-500-meter-core-program-at-dos-santos-project--d4b520b1-8719-4bd6-908e-5706faf90202

Original source: https://money.tmx.com/en/quote/GRI/news/4990391300898692/galore-drill-commences-2019-2-500-meter-core-program-at-dos-santos-project

Publisher: tmx

Original announcement: 2019-06-04T12:30:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Galore Resources Inc.

- Ticker: GRI

- Exchange: TSX

- Region: Zacatecas, Mexico

- Primary commodity: Gold

- Secondary commodities: Silver

- Document categories: Drill results, Other

- Extracted: 2026-09-16 03:31:08 UTC

Narrative sentiment: 0.20 · Bullish

## Minestarters Atlas summary

Galore Resources has commenced a 2,500-meter diamond core drilling program at the El Alamo target within its Dos Santos project in Zacatecas, Mexico. This represents the first drill program conducted at the El Alamo target, which is targeting gold mineralization associated with jasperoid and karst breccias.

Reasoning: The announcement marks the start of a new drilling campaign at a specific target within the Dos Santos project, though no assay results are yet available.

- Positive factor: Commencement of first drill program at El Alamo target

- Positive factor: Targeting known surface mineralization

Facts used in scoring: 1

## Classification and evidence

**Nearology Play**

Polarity: neutral

Story-specific tag

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: The target is positioned near known mineralization discovered by previous exploration programs.

Evidence · text

> targeting gold mineralization discovered by Galore's previous exploration programs

## Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

## Drill Results (1)

### EA-001

[Link to this fact](https://atlas-extractions.minestarters.com/news/galore-drill-commences-2019-2-500-meter-core-program-at-dos-santos-project--d4b520b1-8719-4bd6-908e-5706faf90202#fact-drill-facts-0)

Dos Santos · gold

#### Identity

- Hole ID: EA-001
- Project: Dos Santos
- Commodity: gold
- Region: mexico
- Reported Region: mexico
- Ticker: GRI

#### Geometry

- From: 70 m
- Hole Depth: 70 m
- Intercept Depth: 70 m

#### Classification

- Program: exploration
- Sample Type: drill

#### Location

- Location: El Alamo
- Loc. Source: document

#### QA/QC

- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2019-06-04T00:00:00.000Z

Reasoning: The hole has been drilled to 70m but core has not been logged or assayed.

- Negative factor: No assay results reported yet

Evidence · text

> The first hole, EA-001, is at 70m depth. The core has not been logged.

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
