Goldsky Resources Provides Operational Update on 2026 Drilling Program at Rajapalot Gold-Cobalt Project, Finland
Original announcement by tmx on
- Company
- Goldsky Resources Corp
- Ticker
- GSKR
- Exchange
- TSX
- Region
- Finland
- Primary commodity
- Gold
- Secondary commodities
- Cobalt
- Document categories
- Resource update, Other
- Extracted
- 2026-09-18 03:01:45 UTC
Analysis by Minestarters Atlas
Minestarters Atlas analysis
Summary
Goldsky Resources provided an operational update on its 2026 winter drilling program at the Rajapalot Gold-Cobalt Project in Northern Finland, reporting 6,073 metres drilled across 31 holes, with first assay results expected in March. The company also restated its 2021 Inferred Mineral Resource estimate for Rajapalot, which includes 9.8 million tonnes at 2.8 g/t gold and 441 ppm cobalt. The update highlights the company's ongoing drilling activities while also signaling a strategic shift towards the Barsele Project, where a PEA and extensive drilling are planned for 2026.
Reasoning: The document provides an operational update on a drilling program without new assay results and restates a stale, inferred mineral resource estimate from 2021. The company's focus appears to be shifting to another project, limiting the novelty and materiality of this announcement for Rajapalot.
Positive factors
- Drilling progressing on schedule
- No safety incidents reported
Negative factors
- No new drill results reported
- Resource estimate is stale (2021 effective date)
- Resource is entirely Inferred category
- Company focus appears to be shifting to another project (Barsele)
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 12
Extracted facts
Stored fact records: 12. Some facts used in scoring do not have a stored record.
Resource Estimates (12)
inferredRajapalot Gold-Cobalt Project · goldTonnes: 5612000Grade: 2.8Grade Unit: g/tContained Metal: 501Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- gold
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:eded7562b924bbdbc42d
- Deposit or zone
- Palokas
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 5612000
- Grade
- 2.8
- Grade Unit
- g/t
- Contained Metal
- 501
- Contained Unit
- koz
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the Palokas zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“2.8”
Context: 5,612
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · cobaltTonnes: 5612000Grade: 475Grade Unit: ppmContained Metal: 2664Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- cobalt
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:eded7562b924bbdbc42d
- Deposit or zone
- Palokas
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 5612000
- Grade
- 475
- Grade Unit
- ppm
- Contained Metal
- 2664
- Contained Unit
- t
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the Palokas zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“475”
Context: 5,612
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · goldTonnes: 2702000Grade: 3.1Grade Unit: g/tContained Metal: 271Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- gold
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:3d173148a007eec4f79c
- Deposit or zone
- Raja
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2702000
- Grade
- 3.1
- Grade Unit
- g/t
- Contained Metal
- 271
- Contained Unit
- koz
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the Raja zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“3.1”
Context: 2,702
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · cobaltTonnes: 2702000Grade: 385Grade Unit: ppmContained Metal: 1040Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- cobalt
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:3d173148a007eec4f79c
- Deposit or zone
- Raja
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2702000
- Grade
- 385
- Grade Unit
- ppm
- Contained Metal
- 1040
- Contained Unit
- t
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the Raja zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“385”
Context: 2,702
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · goldTonnes: 299000Grade: 4.5Grade Unit: g/tContained Metal: 43Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- gold
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:8e0b7cc31b2318a0eba7
- Deposit or zone
- East Joki
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 299000
- Grade
- 4.5
- Grade Unit
- g/t
- Contained Metal
- 43
- Contained Unit
- koz
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the East Joki zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“4.5”
Context: 299
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · cobaltTonnes: 299000Grade: 363Grade Unit: ppmContained Metal: 109Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- cobalt
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:8e0b7cc31b2318a0eba7
- Deposit or zone
- East Joki
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 299000
- Grade
- 363
- Grade Unit
- ppm
- Contained Metal
- 109
- Contained Unit
- t
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the East Joki zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“363”
Context: 299
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · goldTonnes: 831000Grade: 1.3Grade Unit: g/tContained Metal: 36Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- gold
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:d8b1858ef93b02bbb3be
- Deposit or zone
- Hut
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 831000
- Grade
- 1.3
- Grade Unit
- g/t
- Contained Metal
- 36
- Contained Unit
- koz
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the Hut zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“1.3”
Context: 831
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · cobaltTonnes: 831000Grade: 428Grade Unit: ppmContained Metal: 355Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- cobalt
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:866d41dcdcbea2272770
- Deposit or zone
- Hut
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 831000
- Grade
- 428
- Grade Unit
- ppm
- Contained Metal
- 355
- Contained Unit
- t
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-02-27T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the Hut zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“428”
Context: 831
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · goldTonnes: 336000Grade: 1.4Grade Unit: g/tContained Metal: 15Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- gold
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:6157e4ac4cf7fa16f66f
- Deposit or zone
- Rumajärvi
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 336000
- Grade
- 1.4
- Grade Unit
- g/t
- Contained Metal
- 15
- Contained Unit
- koz
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the Rumajärvi zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“1.4”
Context: 336
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · cobaltTonnes: 336000Grade: 424Grade Unit: ppmContained Metal: 142Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- cobalt
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:6157e4ac4cf7fa16f66f
- Deposit or zone
- Rumajärvi
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 336000
- Grade
- 424
- Grade Unit
- ppm
- Contained Metal
- 142
- Contained Unit
- t
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, inferred resource estimate for the Rumajärvi zone, providing low novelty.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
Evidence · table
“424”
Context: 336
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · goldTonnes: 9780000Grade: 2.8Grade Unit: g/tContained Metal: 867Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- gold
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:dde666670b3736e54398
- Deposit or zone
- Total Inferred Resources
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 9780000
- Grade
- 2.8
- Grade Unit
- g/t
- Contained Metal
- 867
- Contained Unit
- koz
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, entirely inferred resource estimate, providing low novelty and confidence for economic studies.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
- All Inferred
Evidence · table
“2.8”
Context: 9,780
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
All Inferrednegative
M&I share below the weak bound — very early stage, no engineering confidence.
Why it applies: The entire resource is in the Inferred category, indicating very early stage and no engineering confidence.
Evidence · text
“Total Inferred Resources”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredRajapalot Gold-Cobalt Project · cobaltTonnes: 9780000Grade: 441Grade Unit: ppmContained Metal: 4311Contained Unit: tHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Rajapalot Gold-Cobalt Project
- Commodity
- cobalt
- Region
- finland
- Reported Region
- Finland
- Ticker
- GSKR
Resource scope
- Estimate type
- resource
- Effective date
- 2021-08-26T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Ove Klavér
- Resource group id
- resource:dde666670b3736e54398
- Deposit or zone
- Total Inferred Resources
- Mining method
- underground
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 9780000
- Grade
- 441
- Grade Unit
- ppm
- Contained Metal
- 4311
- Contained Unit
- t
- Cutoff Grade
- 1.1
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2021-08-26
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2021-08-26T00:00:00.000Z
Dates
- Event date
- 2026-02-27T00:00:00.000Z
Reasoning: This is a restatement of a stale, entirely inferred resource estimate, providing low novelty and confidence for economic studies.
Positive factors
- NI 43-101 compliant
- QP signed
Negative factors
- Stale estimate (effective date 2021-08-26)
- Inferred category only
- All Inferred
Evidence · table
“441”
Context: 9,780
Tags used in scoring
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the resource estimate is August 26, 2021, which is more than two years old.
Evidence · text
“effective date August 26, 2021”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource is classified as Inferred, which is the lowest confidence category.
Evidence · text
“Inferred Mineral Resource”
All Inferrednegative
M&I share below the weak bound — very early stage, no engineering confidence.
Why it applies: The entire resource is in the Inferred category, indicating very early stage and no engineering confidence.
Evidence · text
“Total Inferred Resources”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with NI 43-101.
Evidence · text
“Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol)”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Ove Klavér is named as the Qualified Person for the mineral resource estimates.
Evidence · text
“Mr. Ove Klavér (EurGeol)”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.