Homerun Resources Inc. Advances Phase 2 of Its Three-Phase Purification Platform

Original announcement by tmx on

Company
Homerun Resources Inc.
Ticker
HMR
Exchange
TSX
Region
Bahia, Brazil
Primary commodity
Silica
Secondary commodities
Antimony
Document categories
Metallurgy, Other
Extracted
2026-09-12 06:50:22 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Homerun Resources has commissioned Dorfner Anzaplan to perform additional chemical leaching test work on its Santa Maria Eterna (SME) silica deposit in Brazil. This Phase 2 work aims to optimize the purification route for +4N and 5N silica products to minimize OPEX before final CAPEX estimation and process design.

Reasoning: The company is advancing its purification platform by commissioning targeted leaching test work to optimize the Phase 2 process route before committing to CAPEX.

Positive factors

  • Commissioning of specialized lab (Anzaplan) for optimization
  • Targeting high-value +4N and 5N purity grades
  • Strong historical baseline purity (99.694% SiO2)
  • Active engagement with finance parties

Negative factors

  • Additional testing required before CAPEX estimation
  • Process optimization implies previous routes may have been sub-optimal for OPEX

Facts used in scoring: 5

Classification and evidence

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: Phase 3 testing is noted as UC Davis bench testing.

Evidence · text

“Phase 3 (5N, UC Davis bench testing validated, future bolt-on module)”

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 5. Some facts used in scoring do not have a stored record.

Metallurgical Results (5)

chemical leachingSanta Maria Eterna · silicaView all details
Link to this fact

Identity

Project
Santa Maria Eterna
Commodity
silica
Region
brazil
Reported Region
Bahia, Brazil
Ticker
HMR

Test Work

Program Status
optimization
Test Type
chemical leaching
Processing Route
chemical leaching
Sample
SME silica sand samples (historical baseline: 99.694% SiO2)

Lab

Laboratory
Dorfner Anzaplan GmbH

Review

Needs Review
No
Historical
No

Dates

Event date
2026-05-28T00:00:00.000Z

Reasoning: Optimization testing to refine the process route for high-purity silica.

Positive factors

  • Targeting high-purity output (+4N and 5N)

Negative factors

  • Additional testing required to confirm route

Evidence · text

“commissioned Dorfner Anzaplan GmbH... to perform additional chemical leaching test work on silica sand samples”
Fact 2silicaHead Grade: 99.694Head Grade Unit: % SiO2Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Commodity
silica
Region
brazil
Reported Region
Bahia, Brazil
Ticker
HMR

Test Work

Sample
SME silica sand (December 2025 results)

Recovery

Head Grade
99.694
Head Grade Unit
% SiO2

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-12-11T00:00:00.000Z

Dates

Event date
2026-05-28T00:00:00.000Z

Reasoning: High-quality starting material confirmed in previous metallurgical program.

Positive factors

  • Extraordinary baseline quality

Evidence · text

“Starting material purity: 99.694% SiO2 - extraordinary baseline quality”
Fact 3silicaHead Grade: 74Head Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Commodity
silica
Region
brazil
Reported Region
Bahia, Brazil
Ticker
HMR

Test Work

Sample
SME silica sand (December 2025 results)

Recovery

Head Grade
74
Head Grade Unit
ppm

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-12-11T00:00:00.000Z

Dates

Event date
2026-05-28T00:00:00.000Z

Reasoning: Successful impurity reduction in prior test work.

Positive factors

  • Significant reduction in total impurities

Evidence · text

“Total impurities reduced to as low as 74 ppm (from 306 ppm raw)”
Fact 4iron_oreHead Grade: 0.89Head Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Commodity
iron_ore
Region
brazil
Reported Region
Bahia, Brazil
Ticker
HMR

Test Work

Sample
SME silica sand (December 2025 results)

Recovery

Head Grade
0.89
Head Grade Unit
ppm

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-12-11T00:00:00.000Z

Dates

Event date
2026-05-28T00:00:00.000Z

Reasoning: Extremely low iron levels achieved via thermal/leaching route.

Positive factors

  • Exceeds specifications for Type I optical glass

Evidence · text

“Iron reduced to as low as 0.89 ppm with thermal / leaching route”
Fact 5titaniumHead Grade: 3.8Head Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Commodity
titanium
Region
brazil
Reported Region
Bahia, Brazil
Ticker
HMR

Test Work

Sample
SME silica sand (December 2025 results)

Recovery

Head Grade
3.8
Head Grade Unit
ppm

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-12-11T00:00:00.000Z

Dates

Event date
2026-05-28T00:00:00.000Z

Reasoning: Titanium reduction reported in prior program.

Evidence · text

“Titanium reduced to 3.8 ppm with thermal / leaching route”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.