Jaguar Mining Reports Updated Significant 49% Increase in Mineral Reserves at Pilar Mine, Reinforcing Long Term Growth Strategy

Original announcement by tmx on

Company
Jaguar Mining Inc.
Ticker
JAG
Exchange
TSX
Region
Minas Gerais, Brazil
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Resource update
Extracted
2026-09-14 06:50:36 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Jaguar Mining has reported a 49% increase in Mineral Reserves at its Pilar Mine, totaling 286,000 oz contained in 2,494 kt at 3.57 g/t Au. This growth was driven by infill and step-out drilling programs completed in 2025 which successfully converted resources to reserves.

Reasoning: The update reports a substantial 49% increase in Pilar Mine reserves, driven by successful drilling and model reinterpretation, though at a slightly lower average grade.

Positive factors

  • Significant increase in mineral reserves (49%)
  • Successful conversion of resources to reserves via infill drilling
  • Expansion of interpreted limits via step-out drilling
  • Strong continuity confirmed in BA and BFs orebodies

Negative factors

  • Grade decline in reserves (3.89 g/t to 3.57 g/t) despite tonnage growth

Facts used in scoring: 6

Classification and evidence

Tonnage Growthpositive

Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.

Why it applies: Pilar Mineral Reserves increased from 1,536 kt to 2,494 kt, a 62% increase.

Evidence · text

“representing a net increase of 94,000oz in Proven & Probable Mineral Reserves, compared to the previously reported 192,000oz (1,536kt @ 3.89 g/t Au)”

Grade Declinenegative

Average grade fell below the red-flag bound vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: Average grade of Pilar reserves dropped from 3.89 g/t to 3.57 g/t.

Evidence · text

“2,494 thousand tonnes at an average grade of 3.57 g/t Au, representing a net increase... compared to the previously reported... 1,536kt @ 3.89 g/t Au”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Multiple Qualified Persons from SLR Consulting are named as having reviewed and validated the estimates.

Evidence · text

“Mineral Reserves were estimated by Jaguar staff, reviewed and validated by SLR's Qualified Persons.”

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The release explicitly references an NI 43-101 Technical Report for the Caete Mineral Complex.

Evidence · text

“The NI 43-101 Technical Report on Caete Mineral Complex December 31,2025 is now available on SEDAR+.”

Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

Resource Estimates (6)

probablePilar Mine · goldTonnes: 2494000Grade: 3.57Grade Unit: g/tContained Metal: 286000Contained Unit: ozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Pilar Mine
Commodity
gold
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
JAG

Resource scope

Estimate type
reserve
Effective date
2023-11-30T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Jason Cox, Jeff Sepp, Reno Pressacco, Pierrre Landry, Anderson Candido, Dorota El-Rassi, Elias Andrade
Resource group id
resource:e1aa3de686a30791cd5f
Deposit or zone
Pilar Mine
Mining method
combined

Resource Data

Category
probable
Tonnes
2494000
Grade
3.57
Grade Unit
g/t
Contained Metal
286000
Contained Unit
oz
Cutoff Grade
2.45
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2025-12-31
Prior Tonnes
1536000
Prior Grade
3.89
Prior Contained Metal
192000

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
ALS

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-04-01T00:00:00.000Z

Reasoning: Major reserve expansion at a key operating asset.

Positive factors

  • Significant tonnage increase

Negative factors

  • Lower grade than prior estimate

Evidence · text

“Updated Pilar Proven & Probable Mineral Reserves total 286,000oz (2,494 kt @ 3.57 g/t Au)”

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Growthpositive

Tonnage increase reaching the strong tier vs prior estimate, with grade maintained or improved.

Why it applies: 2494000 against 1536000 previously

Grade Declinenegative

Average grade fell below the red-flag bound vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 3.57 against 3.89 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 286000 against 192000 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedPilar Mine · goldTonnes: 514000Grade: 3.98Grade Unit: g/tContained Metal: 66000Contained Unit: kozView all details
Link to this fact

Identity

Project
Pilar Mine
Commodity
gold
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
JAG

Resource scope

Estimate type
resource
Effective date
2023-11-30T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:cf47d8004239631e2ed9
Deposit or zone
BA Orebody
Mining method
combined

Resource Data

Category
indicated
Tonnes
514000
Grade
3.98
Grade Unit
g/t
Contained Metal
66000
Contained Unit
koz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-04-01T00:00:00.000Z

Reasoning: Key contributor to the reserve base.

Positive factors

  • High grade relative to mine average

Evidence · text

“BA Orebody: 66 koz (514 kt @ 3.98 g/t Au)”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedPilar Mine · goldTonnes: 1211000Grade: 3.62Grade Unit: g/tContained Metal: 141000Contained Unit: kozView all details
Link to this fact

Identity

Project
Pilar Mine
Commodity
gold
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
JAG

Resource scope

Estimate type
resource
Effective date
2023-11-30T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:91f1edd58d78ff5078e6
Deposit or zone
BFs Orebodies
Mining method
combined

Resource Data

Category
indicated
Tonnes
1211000
Grade
3.62
Grade Unit
g/t
Contained Metal
141000
Contained Unit
koz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-04-01T00:00:00.000Z

Reasoning: Primary driver of reserve volume.

Positive factors

  • Largest contributor to reserves

Evidence · text

“BFs Orebodies : 141 koz (1,211 kt @ 3.62 g/t Au)”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedPilar Mine · goldTonnes: 312000Grade: 3.27Grade Unit: g/tContained Metal: 33000Contained Unit: kozView all details
Link to this fact

Identity

Project
Pilar Mine
Commodity
gold
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
JAG

Resource scope

Estimate type
resource
Effective date
2023-11-30T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:2ec50c40768f0b67b6b0
Deposit or zone
SW Orebody
Mining method
combined

Resource Data

Category
indicated
Tonnes
312000
Grade
3.27
Grade Unit
g/t
Contained Metal
33000
Contained Unit
koz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-04-01T00:00:00.000Z

Reasoning: Significant secondary orebody.

Evidence · text

“SW Orebody : 33 koz (312 kt @ 3.27 g/t Au)”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedPilar Mine · goldTonnes: 173000Grade: 3.24Grade Unit: g/tContained Metal: 18000Contained Unit: kozView all details
Link to this fact

Identity

Project
Pilar Mine
Commodity
gold
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
JAG

Resource scope

Estimate type
resource
Effective date
2023-11-30T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:65046188092bb70ce4cb
Deposit or zone
Torre Orebody
Mining method
combined

Resource Data

Category
indicated
Tonnes
173000
Grade
3.24
Grade Unit
g/t
Contained Metal
18000
Contained Unit
koz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-04-01T00:00:00.000Z

Reasoning: Smaller contributing orebody.

Evidence · text

“Torre Orebody : 18 koz (173 kt @ 3.24 g/t Au)”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedPilar Mine · goldTonnes: 285000Grade: 3.14Grade Unit: g/tContained Metal: 29000Contained Unit: kozView all details
Link to this fact

Identity

Project
Pilar Mine
Commodity
gold
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
JAG

Resource scope

Estimate type
resource
Effective date
2023-11-30T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:1befee0878677dc5b851
Deposit or zone
Other Orebodies
Mining method
combined

Resource Data

Category
indicated
Tonnes
285000
Grade
3.14
Grade Unit
g/t
Contained Metal
29000
Contained Unit
koz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-04-01T00:00:00.000Z

Reasoning: Residual reserve contribution.

Evidence · text

“Other Orebodies : 29 koz (285 kt @ 3.14 g/t Au)”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.