Laramide to Update Westmoreland Economic Study

Original announcement by tmx on

Company
Laramide Resources Ltd.
Ticker
LAM
Exchange
TSX
Region
Queensland, Australia
Primary commodity
Uranium
Secondary commodities
None reported
Document categories
Resource update, Economic study
Extracted
2026-09-18 06:53:56 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Laramide Resources has engaged Lycopodium Limited to update the Preliminary Economic Assessment (PEA) for the Westmoreland Uranium Project in Queensland, Australia. The update, expected in 1H 2026, will incorporate higher long-term uranium prices and a significantly expanded mineral resource base.

Reasoning: The announcement of a PEA update to reflect higher uranium prices and a larger resource base is a positive catalyst for project valuation, though regulatory risk in Queensland remains a factor.

Positive factors

  • Engagement of Lycopodium to update PEA
  • Materially higher long-term uranium pricing expected in update
  • Significant expansion of the mineral resource base since 2016
  • Secured Mining Development Licence (MDL)

Negative factors

  • Project advancement depends on Queensland policy clarity

Facts used in scoring: 3

Classification and evidence

PEA Onlyneutral

Only Class 4 / Initial Assessment economics available. Not bankable.

Why it applies: The company is updating a Preliminary Economic Assessment (PEA).

Evidence · text

“engaged Lycopodium Limited (ASX: LYL) to update the Preliminary Economic Assessment ("PEA")”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document provides current resource figures (Indicated and Inferred) as context for the upcoming study.

Evidence · text

“Laramide has meaningfully expanded the Westmoreland Mineral Resource”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Rhys Davies, a Competent Person and Qualified Person, is named in relation to the exploration results/resource information.

Evidence · text

“Mr. Davies is a Member of The Australasian Institute of Geoscientists... and is a "Qualified Person" as defined by National Instrument 43-101”

Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

Resource Estimates (2)

indicatedWestmoreland Uranium Project · uraniumGrade: 770Grade Unit: ppmContained Metal: 48.1Contained Unit: million pounds u3o8View all details
Link to this fact

Identity

Project
Westmoreland Uranium Project
Commodity
uranium
Region
australia_qld
Reported Region
Queensland, Australia
Ticker
LAM

Resource scope

Estimate type
resource
Reporting standards
ni_43_101, jorc
Resource group id
resource:7bcb88e2fde05e316b7b

Resource Data

Category
indicated
Grade
770
Grade Unit
ppm
Contained Metal
48.1
Contained Unit
million pounds u3o8

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-26T00:00:00.000Z

Reasoning: Provides the current Indicated resource baseline for the upcoming PEA update.

Positive factors

  • Significant resource base in Indicated category

Evidence · text

“48.1 million pounds U3O8 in the Indicated category at an average grade of 770 ppm”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

inferredWestmoreland Uranium Project · uraniumGrade: 680Grade Unit: ppmContained Metal: 17.7Contained Unit: million pounds u3o8View all details
Link to this fact

Identity

Project
Westmoreland Uranium Project
Commodity
uranium
Region
australia_qld
Reported Region
Queensland, Australia
Ticker
LAM

Resource scope

Estimate type
resource
Reporting standards
ni_43_101, jorc
Resource group id
resource:40b7d6a47a612e176831

Resource Data

Category
inferred
Grade
680
Grade Unit
ppm
Contained Metal
17.7
Contained Unit
million pounds u3o8

Review

Needs Review
No
Historical
No

Dates

Event date
2026-02-26T00:00:00.000Z

Reasoning: Provides the current Inferred resource baseline for the upcoming PEA update.

Positive factors

  • Contributes to total resource scale

Negative factors

  • Inferred category carries lower geological confidence

Evidence · text

“17.7 million pounds U3O8 in the Inferred category at an average grade of 680 ppm”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.