Summary

LithiumBank has awarded a Feasibility Study and Front-End Engineering Design (FEED) contract to SLB for its Boardwalk lithium brine project in Alberta. The project features a significant resource of 8 million tonnes LCE and has demonstrated 95% lithium recovery in previous pilot testing.

Reasoning: The announcement marks a major de-risking milestone by advancing a large-scale lithium brine project into the Feasibility Study stage with a global technology partner (SLB).

Positive factors

  • Initiation of Feasibility Study and FEED with SLB
  • High lithium recoveries (95%) demonstrated in pilot testing
  • Significant resource scale (8 Mt LCE total)
  • Non-dilutive funding of $3.9M from ERA

Negative factors

  • QP is non-independent

Facts used in scoring: 4

Classification and evidence

PFS Completepositive

AACE Class 3 study complete.

Why it applies: The company is initiating a Feasibility Study (PFS/DFS level) following a PEA.

Evidence · text

“announcement of the advancement of its 100% owned Boardwalk lithium brine project ("Boardwalk") through the initiation of a Feasibility Study and Front-End Engineering Design ("FEED")”

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The resource estimate is explicitly stated as a NI 43-101 estimate.

Evidence · text

“Boardwalk's NI 43-101 resource estimate”

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Pilot testing demonstrated sustained lithium recoveries of up to 95%.

Evidence · text

“demonstrating sustained lithium recoveries of up to 95%”

No QP/CP Disclosurenegative

No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: While a QP is named, the document notes the QP is non-independent.

Evidence · text

“Mr Kevin Piepgrass is the Chief Operating Officer for LithiumBank and is non-independent.”

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

Resource Estimates (2)

indicatedBoardwalk · lithiumTonnes: 5200000Grade: 81.6Grade Unit: mg/L lithiumContained Metal: 5200000Contained Unit: t lceHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Boardwalk
Commodity
lithium
Region
canada_ab
Reported Region
Alberta
Ticker
LBNK

Resource scope

Estimate type
resource
Effective date
2025-02-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Kevin Piepgrass
Resource group id
resource:12a422773e133b4d6522

Resource Data

Category
indicated
Tonnes
5200000
Grade
81.6
Grade Unit
mg/L lithium
Contained Metal
5200000
Contained Unit
t lce

Prior Estimate

Resource Date
2025-02-20

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-02-20T00:00:00.000Z

Dates

Event date
2026-05-28T00:00:00.000Z

Reasoning: This is a restatement of the NI 43-101 technical report effective Feb 2025.

Positive factors

  • Large scale resource

Evidence · text

“Boardwalk's NI 43-101 resource estimate, as outlined in the "LithiumBank Resources Corp. Boardwalk NI 43-101 Technical Report" (effective February 20, 2025), includes Measured and Indicated resources of 5.2 million tonnes of lithium carbonate equivalent ("LCE") at an average grade of 81.6 mg/L lithium”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBoardwalk · lithiumTonnes: 2800000Grade: 79Grade Unit: mg/L lithiumContained Metal: 2800000Contained Unit: t lceHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Boardwalk
Commodity
lithium
Region
canada_ab
Reported Region
Alberta
Ticker
LBNK

Resource scope

Estimate type
resource
Effective date
2025-02-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Kevin Piepgrass
Resource group id
resource:1cb45e5d134f1225ad27

Resource Data

Category
inferred
Tonnes
2800000
Grade
79
Grade Unit
mg/L lithium
Contained Metal
2800000
Contained Unit
t lce

Prior Estimate

Resource Date
2025-02-20

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-02-20T00:00:00.000Z

Dates

Event date
2026-05-28T00:00:00.000Z

Reasoning: Inferred component is significant.

Evidence · text

“and Inferred resources of 2.8 million tonnes LCE at 79 mg/L lithium”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (1)

pilot testingBoardwalk · lithiumRecovery: 95 %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Boardwalk
Commodity
lithium
Region
canada_ab
Reported Region
Alberta
Ticker
LBNK

Test Work

Program Status
detailed
Test Type
pilot testing
Sample
35,000 litres of brine sourced from the Boardwalk project

Recovery

Recovery
95 %
Recovery Basis
actual_test

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-04-14T00:00:00.000Z

Dates

Event date
2026-05-28T00:00:00.000Z

Reasoning: Pilot testing results are very strong for DLE technology.

Positive factors

  • High recovery

Evidence · text

“LithiumBank previously completed initial DLE pilot testing with SLB (see news release dated April 14, 2025), demonstrating sustained lithium recoveries of up to 95%”

Tags used in scoring

Pilot Scale Completepositive

Pilot or demonstration plant testing completed under continuous operation.

Why it applies: test_type names pilot-scale work

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 95% is at or above the exceptional band (80%)

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.