Manganese X Energy Announces Eric Sprott's Commitment to Fund Pre-Feasibility Study of Electric Royalties' Flagship Manganese Royalty Asset in New Brunswick

Original announcement by tmx on

Company
Electric Royalties Ltd.
Ticker
ELEC
Exchange
TSX
Region
New Brunswick
Primary commodity
Manganese
Secondary commodities
None reported
Document categories
Resource update, Agreement transaction, Economic study
Extracted
2026-09-19 21:15:20 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Electric Royalties announced that Manganese X Energy has secured a C$2 million commitment from Eric Sprott to fund a Pre-Feasibility Study for the Battery Hill Manganese Project, in which Electric Royalties holds a 2% gross metal royalty. The document also references a 2022 PEA for the project which projected significant annual revenues and a short payback period.

Reasoning: The announcement highlights a significant funding commitment from a major mining investor (Eric Sprott) to advance a key project (Battery Hill) where the company holds a royalty, de-risking the upcoming PFS.

Positive factors

  • Strategic investment from Eric Sprott to fund upcoming PFS
  • Existing royalty interest in a high-purity manganese project
  • Historical PEA shows strong revenue and short payback

Negative factors

  • Electric Royalties only holds a 2% gross metal royalty, limiting direct upside

Facts used in scoring: 4

Classification and evidence

Nearology Playneutral · Story-specific tag

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: The company's value is derived from its royalty interest in the Battery Hill Manganese Project.

Evidence · text

“Electric Royalties Ltd. ... is pleased to provide an update on the Battery Hill Manganese Project ("Battery Hill" or "the Project") in New Brunswick, Canada, on which it owns a 2% Gross Metal Royalty.”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: David Gaunt, P.Geo., a qualified person, has reviewed and approved the technical information.

Evidence · text

“David Gaunt, P.Geo., a qualified person who is not independent of Electric Royalties, has reviewed and approved the technical information in this release.”

Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

Resource Estimates (3)

measuredBattery Hill Manganese Project · manganeseTonnes: 5900000Grade: 7.65Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Battery Hill Manganese Project
Commodity
manganese
Region
canada_nb
Reported Region
New Brunswick
Ticker
ELEC

Resource scope

Estimate type
resource
Effective date
2022-05-12T00:00:00.000Z
Resource group id
resource:969754780dc83adff65d

Resource Data

Category
measured
Tonnes
5900000
Grade
7.65
Grade Unit
%
Cutoff Grade
3.3
Cutoff Unit
%

Prior Estimate

Resource Date
2022-05-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-05-12T00:00:00.000Z

Dates

Event date
2025-01-03T00:00:00.000Z

Reasoning: The resource figures are part of the historical PEA technical report.

Positive factors

  • High grade manganese reported

Negative factors

  • Historical data from 2022 PEA

Evidence · text

“Measured MR of 5.90 Mt grading 7.65% Mn”

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.6 years before this release

indicatedBattery Hill Manganese Project · manganeseTonnes: 6370000Grade: 7.26Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Battery Hill Manganese Project
Commodity
manganese
Region
canada_nb
Reported Region
New Brunswick
Ticker
ELEC

Resource scope

Estimate type
resource
Effective date
2022-05-12T00:00:00.000Z
Resource group id
resource:924463b98e00709daf2d

Resource Data

Category
indicated
Tonnes
6370000
Grade
7.26
Grade Unit
%
Cutoff Grade
3.3
Cutoff Unit
%

Prior Estimate

Resource Date
2022-05-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-05-12T00:00:00.000Z

Dates

Event date
2025-01-03T00:00:00.000Z

Reasoning: The resource figures are part of the historical PEA technical report.

Positive factors

  • High grade manganese reported

Negative factors

  • Historical data from 2022 PEA

Evidence · text

“Indicated MR of 6.37 Mt grading 7.26% Mn”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.6 years before this release

inferredBattery Hill Manganese Project · manganeseTonnes: 4730000Grade: 8.26Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Battery Hill Manganese Project
Commodity
manganese
Region
canada_nb
Reported Region
New Brunswick
Ticker
ELEC

Resource scope

Estimate type
resource
Effective date
2022-05-12T00:00:00.000Z
Resource group id
resource:cb55b75deffbcc0990e8

Resource Data

Category
inferred
Tonnes
4730000
Grade
8.26
Grade Unit
%
Cutoff Grade
3.3
Cutoff Unit
%

Prior Estimate

Resource Date
2022-05-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-05-12T00:00:00.000Z

Dates

Event date
2025-01-03T00:00:00.000Z

Reasoning: The resource figures are part of the historical PEA technical report.

Positive factors

  • High grade manganese reported

Negative factors

  • Historical data from 2022 PEA

Evidence · text

“Inferred MR of 4.73 Mt grading 8.26% Mn”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.6 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.