# Mineral Resource Increase of 17% to 23.5Mt at Mina do Barroso Lithium Project

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6

Original source: https://www.rns-pdf.londonstockexchange.com/rns/5067V_1-2019-4-8.pdf

Publisher: research

Original announcement: Unknown date

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-11T14:35:08.664Z

Atlas analysis updated: 2026-11-11T14:35:08.664Z

- Company: Unavailable

- Ticker: SAV

- Exchange: LSE

- Region: northern Portugal

- Primary commodity: Lithium

- Secondary commodities: Iron ore, Tantalum

- Document categories: Resource update, Metallurgy, Other

- Extracted: 2026-11-11 14:35:08 UTC

Narrative sentiment: 0.62 · Bullish

## Minestarters Atlas summary

Savannah reports a 17% increase in the Mina do Barroso JORC Mineral Resource to 23.5Mt at 1.02% Li2O, with 241,000t contained Li2O. The update also lifts Measured and Indicated tonnage to 13.3Mt and highlights that metallurgical test work supports conventional processing, while further optimisation work continues.

Reasoning: The release reports a material JORC resource increase and improved confidence at Mina do Barroso, alongside supportive but still preliminary metallurgical commentary. It is positive and materially important, but not a feasibility or production milestone.

- Positive factor: JORC compliant Mineral Resource increased to 23.5Mt at 1.02% Li2O

- Positive factor: Measured and Indicated resource increased to 13.3Mt and now represents 58% of the total resource

- Positive factor: QA/QC, competent person sign-off and cut-off grade are disclosed

- Positive factor: Metallurgical test work indicates conventional processing can generate high-grade lithium concentrate

- Negative factor: Exploration Target remains conceptual and is not a resource

- Negative factor: No modifying factors were applied to the reported Mineral Resource Estimate

- Negative factor: Metallurgical work is ongoing and no final flowsheet is defined

Facts used in scoring: 18

## Classification and evidence

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: The announcement states the estimate is a JORC 2012 compliant Mineral Resource Estimate.

Evidence · text

> JORC 2012 Compliant Measured, Indicated and Inferred Mineral Resource Estimate

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The release names Paul Payne and says the resource information is based on his work as Competent Person.

Evidence · text

> Mr Paul Payne, a Competent Person

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The resource table explicitly states a 0.5% Li2O cut-off.

Evidence · table

> 0.5% Li2O Cut-off

Context: Table 3. April 2019 Mineral Resource Summary \(0.5% Li2O cut-off\)

**QA/QC Disclosed**

Polarity: positive

Story-specific tag

Definition: Reported assays have a certified laboratory, actual QA/QC methods, or named QP/CP responsibility. Generic CP boilerplate, old-release references, plans and unrelated work are insufficient. Approval of a correction does not verify expressly unverified historical assays; assay accuracy is not guaranteed.

Why it applies: The release states QAQC protocols were in place and names blanks, standards and field duplicates.

Evidence · text

> QAQC protocols were in place

**Infill Drilling**

Polarity: neutral

Story-specific tag

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The program is described as focused on improving the resource category and increasing confidence in the existing mining inventory.

Evidence · text

> focused on both improving the Mineral Resource Estimate category of the existing Mining Inventory

**Free Milling**

Polarity: positive

Definition: Simple, clean ore amenable to standard processing without oxidation.

Why it applies: The metallurgy section says conventional processing technology can generate concentrate, without refractory treatment being required.

Evidence · text

> using conventional processing technology

**Deleterious Elements Present**

Polarity: negative

Story-specific tag

Definition: A source-stated penalty, refractory or recovery concern in the fact's scope. Element detection alone, including measured elements explicitly below penalty thresholds, does not trigger this tag. Respect negation and retain a separately stated concern even when another risk is explicitly absent.

Why it applies: Iron contamination in assay data is discussed and corrected for before estimation.

Evidence · text

> a large proportion of the assayed iron is due to contamination

**Apparent Width Only**

Polarity: negative

Story-specific tag

Definition: A reported assay interval gives downhole or apparent length without a disclosed true width. It describes geometric uncertainty, not a measured true thickness or proof that the interval is overstated; drill orientation alone is not a true-width measurement.

Why it applies: Some mineralisation widths are described in terms of thickness and true width, but many resource tables do not carry drill orientation details; this is mainly a resource-summary release rather than a drill intercept report.

Evidence · text

> The lower portion is a steep dipping dyke, which is 15m-20m in true width

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: the document describes a flotation route \("concentrate"\)

**Multi-Domain Tested**

Polarity: positive

Definition: Completed testwork covers multiple identified ore domains and addresses variability under DOMAIN\_COVERAGE\_TIERS. Multiple sample or composite identifiers from the same domain do not establish multiple domains, and a proposed programme is not completed coverage.

Why it applies: 3 distinct composites were tested

## Extracted facts

Stored fact records: 18. Some facts used in scoring do not have a stored record.

## Resource Estimates (13)

### measured

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-0)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:f2f7c5b22c2c02dc40cf
- Deposit or zone: All Deposits
- Mining method: open\_pit

#### Resource Data

- Category: measured
- Tonnes: 6600000
- Grade: 1.1
- Grade Unit: % Li2O
- Contained Metal: 71600
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: Measured lithium resource is a key component of the updated estimate and shows strong geological confidence.

- Positive factor: Measured resource disclosed in a JORC-compliant update

- Positive factor: Contained metal and cut-off grade are stated

- Positive factor: Part of a larger 23.5Mt resource increase

Evidence · table

> Measured 6.6 1.1 0.7 71,600

Context: Table 1. Updated Mineral Resource Estimation Summary

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-1)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:69fe208410db3548f15e
- Deposit or zone: All Deposits
- Mining method: open\_pit

#### Resource Data

- Category: indicated
- Tonnes: 6800000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 65400
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The indicated component is material because it supports mine planning and now forms a large part of the resource base.

- Positive factor: Indicated resource increased as part of the updated estimate

- Positive factor: JORC-compliant reporting and QP sign-off are disclosed

Evidence · table

> Indicated 6.8 1.0 0.8 65,400

Context: Table 1. Updated Mineral Resource Estimation Summary

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-2)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:32f94898ef1fe9ba756b
- Deposit or zone: All Deposits
- Mining method: open\_pit

#### Resource Data

- Category: inferred
- Tonnes: 10200000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 103900
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The inferred category adds scale, but it carries lower confidence and therefore less immediate engineering value.

- Positive factor: Inferred resource is explicitly quantified in the updated estimate

- Positive factor: The project-wide resource inventory expanded

- Negative factor: Inferred material still forms a substantial portion of the resource

- Negative factor: Lower confidence than Measured and Indicated

Evidence · table

> Inferred 10.2 1.0 0.9 103,900

Context: Table 1. Updated Mineral Resource Estimation Summary

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### measured

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-3)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:f2f7c5b22c2c02dc40cf
- Deposit or zone: All Deposits
- Mining method: open\_pit

#### Resource Data

- Category: measured
- Tonnes: 6600000
- Grade: 1.1
- Grade Unit: % Li2O
- Contained Metal: 71600
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: This repeats the measured project total from the detailed table and confirms the headline resource summary.

- Positive factor: Measured resource row repeated in detailed table

- Positive factor: Cut-off grade disclosed

Evidence · table

> Measured 6.6 1.1 0.7 71,600

Context: Table 3. April 2019 Mineral Resource Summary \(0.5% Li2O cut-off\)

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-4)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:69fe208410db3548f15e
- Deposit or zone: All Deposits
- Mining method: open\_pit

#### Resource Data

- Category: indicated
- Tonnes: 6800000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 65400
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The detailed table confirms the indicated resource component used in the headline summary.

- Positive factor: Indicated project total is explicitly stated in the detailed summary

Evidence · table

> Indicated 6.4 1.0 0.8 65,300

Context: Table 3. April 2019 Mineral Resource Summary \(0.5% Li2O cut-off\)

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-5)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:32f94898ef1fe9ba756b
- Deposit or zone: All Deposits
- Mining method: open\_pit

#### Resource Data

- Category: inferred
- Tonnes: 10200000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 103900
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The inferred resource remains an important part of the project inventory but is lower confidence than the Measured and Indicated material.

- Positive factor: Inferred project total is explicitly stated in the detailed table

- Negative factor: Large inferred component reduces confidence

Evidence · table

> Inferred 10.2 1.0 0.9 103,900

Context: Table 3. April 2019 Mineral Resource Summary \(0.5% Li2O cut-off\)

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### measured

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-6)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:65429716cb756cb6d811
- Deposit or zone: Grandao
- Mining method: open\_pit

#### Resource Data

- Category: measured
- Tonnes: 6600000
- Grade: 1.1
- Grade Unit: % Li2O
- Contained Metal: 71600
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: Grandao is the flagship component of the resource update and the measured tonnage is a strong confidence signal.

- Positive factor: Grandao Measured resource is material and supports the main pit area

- Positive factor: Contained metal and cut-off are stated

Evidence · table

> Measured 6.6 1.1 0.7 71,600

Context: Grandao April 2019 - Total Mineral Resource Estimate

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: A source-reported Measured Mineral Resource with sufficiently established geological continuity and quality. After the required study and Modifying Factors it may convert to a Proved/Proven or Probable Reserve; the resource classification alone is not a reserve or a demonstration of economic viability.

Why it applies: category is "measured"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-7)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:8d49c6ce1c0e8bb88711
- Deposit or zone: Grandao
- Mining method: open\_pit

#### Resource Data

- Category: indicated
- Tonnes: 6400000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 65300
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The indicated Grandao tonnage is significant and supports mine planning and continuity.

- Positive factor: Grandao indicated resource adds scale to the main deposit

Evidence · table

> Indicated 6.4 1.0 0.8 65,300

Context: Grandao April 2019 - Total Mineral Resource Estimate

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-8)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:8cbeee5c8929b2b88715
- Deposit or zone: Grandao
- Mining method: open\_pit

#### Resource Data

- Category: inferred
- Tonnes: 4800000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 48900
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The inferred Grandao material adds scale but remains speculative relative to the measured and indicated material.

- Positive factor: Grandao inferred resource is quantified in the update

- Negative factor: Inferred classification carries lower confidence

Evidence · table

> Inferred 4.8 1.0 0.7 48,900

Context: Grandao April 2019 - Total Mineral Resource Estimate

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-9)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:b39c29005ab0936c6508
- Deposit or zone: Reservatorio
- Mining method: open\_pit

#### Resource Data

- Category: inferred
- Tonnes: 3200000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 32000
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: Reservatorio contributes to the project total, but this release only shows it as inferred rather than higher-confidence material.

- Positive factor: Reservatorio resource is included in the project inventory

- Positive factor: Contained metal is stated

- Negative factor: Only an inferred resource is stated for this deposit in the summary

Evidence · table

> 3.2 1.0 1.4 32,000

Context: Reservatorio / Table 3. April 2019 Mineral Resource Summary \(0.5% Li2O cut-off\)

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-10)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:8dc2e7a21c02961c8c17
- Deposit or zone: Pinheiro
- Mining method: open\_pit

#### Resource Data

- Category: inferred
- Tonnes: 2000000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 20000
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: Pinheiro adds conceptual scale, but its entire resource remains inferred in this release.

- Positive factor: Pinheiro inferred resource is reported as part of the expanded inventory

- Negative factor: No Measured or Indicated resource is shown for Pinheiro in the summary

Evidence · table

> 2.0 1.0 0.7 20,000

Context: Pinheiro / Table 3. April 2019 Mineral Resource Summary \(0.5% Li2O cut-off\)

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-11)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:9e9c05e268cb9c999089
- Deposit or zone: NOA
- Mining method: open\_pit

#### Resource Data

- Category: indicated
- Tonnes: 400000
- Grade: 1.2
- Grade Unit: % Li2O
- Contained Metal: 4200
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: NOA contributes a modest indicated component with a slightly higher grade than the project-wide average.

- Positive factor: NOA has an indicated resource component

- Positive factor: Higher grade than the project average

- Negative factor: Small tonnage relative to the project total

Evidence · table

> Indicated 0.4 1.2 0.8 4,200

Context: NOA / Table 3. April 2019 Mineral Resource Summary \(0.5% Li2O cut-off\)

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: A source-reported Indicated Mineral Resource with sufficient geological confidence to apply Modifying Factors and evaluate economic viability. It may support conversion to a Probable Reserve after the required study; it is not itself a reserve.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-resource-facts-12)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Paul Payne
- Resource group id: resource:4f9e5738fb6968295b8e
- Deposit or zone: NOA
- Mining method: open\_pit

#### Resource Data

- Category: inferred
- Tonnes: 300000
- Grade: 1
- Grade Unit: % Li2O
- Contained Metal: 2900
- Contained Unit: t
- Cutoff Grade: 0.5
- Cutoff Unit: % Li2O

#### Prior Estimate

- Resource Date: 2019-04-09

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The NOA inferred tonnage is comparatively small but still relevant to the deposit inventory.

- Positive factor: NOA inferred resource is reported alongside the indicated component

- Negative factor: Lower-confidence material dominates the deposit

Evidence · table

> Inferred 0.3 1.0 0.9 2,900

Context: NOA / Table 3. April 2019 Mineral Resource Summary \(0.5% Li2O cut-off\)

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: A source-reported Inferred Mineral Resource with lower geological confidence than Indicated or Measured. It cannot be converted directly to a reserve or establish the reserve basis of a PFS/FS; applicable early-stage assessments may include it with the required cautions. Negative polarity describes confidence limitations, not proof of a poor deposit.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: The announcement publishes a new or revised estimate for an existing resource, with a source-backed change in tonnage, grade, classification, commodity or estimation basis. An older resource table reproduced as background to drilling or exploration is not a new resource update. A table heading or an effective date alone does not establish a revision in this announcement; compare the actual estimate and its scope with the prior disclosure.

Why it applies: the release compares against a previous estimate

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

**Stale Estimate**

Polarity: negative

Definition: The estimate effective date exceeds the MRE\_STALENESS window measured at the document event date. Preserve the actual dates; age alone does not establish non-compliance or a change in the resource.

Why it applies: effective date is 7.6 years before this release

## Metallurgical Results (5)

### metallurgical test work

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-metallurgical-facts-13)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Test Work

- Program Status: detailed
- Test Type: metallurgical test work
- Processing Route: conventional processing technology
- Sample: representative mineralisation at Mina do Barroso

#### Recovery

- Recovery Basis: actual\_test

#### Lab

- Laboratory: Nagrom Metallurgical
- Consultant: Nagrom Metallurgical

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The metallurgy is supportive but qualitative only; it indicates conventional processing may work, but it does not yet provide a quantified recovery basis.

- Positive factor: Metallurgical test work was completed by Nagrom Metallurgical

- Positive factor: Conventional processing technology is described

- Positive factor: High-grade lithium, low-grade iron concentrate can be generated

- Negative factor: No numeric recovery is reported

- Negative factor: No full flowsheet, reagent regime or test-scale details are given

Evidence · text

> The work was completed by Nagrom Metallurgical in Australia and confirmed that high-grade lithium

### metallurgical test work

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-metallurgical-facts-14)

Mina do Barroso Lithium Project · iron\_ore

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: iron\_ore
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Test Work

- Program Status: detailed
- Test Type: metallurgical test work
- Processing Route: conventional processing technology
- Sample: representative mineralisation at Mina do Barroso

#### Recovery

- Recovery Basis: actual\_test

#### Lab

- Laboratory: Nagrom Metallurgical
- Consultant: Nagrom Metallurgical

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: Iron is mentioned as a byproduct concentrate characteristic, but there is no numeric metallurgical result for it.

- Positive factor: Low-grade iron concentrate is specifically mentioned as an outcome

- Negative factor: No iron recovery percentage is reported

- Negative factor: The statement is qualitative only

Evidence · text

> high-grade lithium, low-grade iron concentrate can be generated

### metallurgical test work

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-metallurgical-facts-15)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Test Work

- Program Status: detailed
- Test Type: metallurgical test work
- Processing Route: conventional processing technology
- Sample: representative mineralisation at Mina do Barroso

#### Recovery

- Recovery Basis: actual\_test

#### Lab

- Laboratory: Nagrom Metallurgical
- Consultant: Nagrom Metallurgical

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The mineralogical result supports the processing concept, but the release stops short of quantifying performance.

- Positive factor: Microscopy confirmed concentrate was almost entirely spodumene

- Negative factor: No numeric recovery or concentrate grade is given

Evidence · text

> Microscopy confirmed that the concentrate was almost entirely spodumene.

### Fact 4

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-metallurgical-facts-16)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Test Work

- Sample: field duplicates of 208 samples

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: This is an important QA/QC and data-quality note because the iron values required correction for contamination.

- Positive factor: QA/QC and duplicate testing are disclosed

- Positive factor: Field duplicates of 208 samples were submitted for analysis

- Negative factor: Iron contamination was identified in the assay data

- Negative factor: The release says the iron content was affected by abrasion of steel sample preparation equipment

Evidence · text

> field duplicates of 208 samples

### Fact 5

[Link to this fact](https://atlas-extractions.minestarters.com/news/mineral-resource-increase-of-17-to-23-5mt-at-mina-do-barroso-lithium-project--b100c642-3e68-43bb-96c2-4cd6560581b6#fact-metallurgical-facts-17)

Mina do Barroso Lithium Project · lithium

#### Identity

- Project: Mina do Barroso Lithium Project
- Commodity: lithium
- Region: northern portugal
- Reported Region: northern Portugal
- Ticker: SAV

#### Test Work

- Sample: Grandao deposit

#### Lab

- Laboratory: ALS

#### Location

- Loc. Confidence: low

#### Review

- Needs Review: No
- Historical: No

Reasoning: The check-assay program is material because it underpins the corrected iron values used in the resource estimate.

- Positive factor: Preliminary check assays were undertaken

- Positive factor: A regression formula was developed to correct Fe contamination

- Negative factor: The release states iron contamination was introduced during sample preparation

Evidence · text

> a preliminary program of check assays

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
