Namibia Critical Metals Successfully Completes Hydromet Pilot Plant Test Work for the Lofdal Heavy Rare Earth Deposit; JOGMEC Increases Budget

Original announcement by tmx on

Company
Namibia Critical Metals Inc.
Ticker
NMI
Exchange
TSX
Region
Namibia
Primary commodity
Rare earth elements
Secondary commodities
Terbium, Dysprosium, Yttrium, Uranium, Thorium, Scandium
Document categories
Metallurgy
Extracted
2026-09-14 15:29:28 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Namibia Critical Metals has successfully completed hydrometallurgical pilot plant testing at SGS Lakefield for the Lofdal HREE project. The testing resulted in a simplified flowsheet that reduces reagent consumption and achieves high recoveries for terbium and dysprosium. Additionally, JV partner JOGMEC has increased its budget commitment to over $15 million CDN.

Reasoning: Successful pilot plant test work demonstrated a simplified, more efficient flowsheet with high recoveries for critical heavy rare earth elements, supported by increased funding from a strategic partner.

Positive factors

  • Flowsheet simplification reduces reagent consumption
  • High recovery rates for critical HREE (Tb and Dy)
  • Successful scale-up from bench to pilot rotary kiln
  • Increased budget commitment from JV partner JOGMEC

Negative factors

  • Presence of thorium and uranium in the process stream requires management

Facts used in scoring: 3

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The process involves acid baking, water leaching, ion exchange, and carbonate precipitation in a pilot plant setting.

Evidence · text

“Pilot-scale test work at SGS Lakefield resulted in a simplified flow sheet.”

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: 2 distinct composites were tested

Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

Metallurgical Results (3)

acid bakeLofdal · terbiumRecovery: 94 %Head Grade: 2.65Head Grade Unit: % TREOView all details
Link to this fact

Identity

Project
Lofdal
Commodity
terbium
Region
namibia
Reported Region
Namibia
Ticker
NMI

Test Work

Program Status
detailed
Test Type
acid bake
Processing Route
two-stage acid bake process (300°C and 650°C) followed by water leach and liquor treatment
Sample
93 kg pilot plant flotation concentrate sample, 2.65% TREO, run-of-mine material from Lofdal Area 4 starter pit

Recovery

Recovery
94 %
Recovery Basis
actual_test
Head Grade
2.65
Head Grade Unit
% TREO

Lab

Laboratory
SGS Lakefield

Review

Needs Review
No
Historical
No

Dates

Event date
2025-01-22T00:00:00.000Z

Reasoning: 94% recovery is exceptional for terbium in this process context.

Positive factors

  • High recovery of 94% for a critical heavy rare earth

Evidence · text

“recoveries of around 94% terbium (Tb) and dysprosium (Dy) using a two-stage acid bake process”
acid bakeLofdal · dysprosiumRecovery: 94 %Head Grade: 2.65Head Grade Unit: % TREOView all details
Link to this fact

Identity

Project
Lofdal
Commodity
dysprosium
Region
namibia
Reported Region
Namibia
Ticker
NMI

Test Work

Program Status
detailed
Test Type
acid bake
Processing Route
two-stage acid bake process (300°C and 650°C) followed by water leach and liquor treatment
Sample
93 kg pilot plant flotation concentrate sample, 2.65% TREO, run-of-mine material from Lofdal Area 4 starter pit

Recovery

Recovery
94 %
Recovery Basis
actual_test
Head Grade
2.65
Head Grade Unit
% TREO

Lab

Laboratory
SGS Lakefield

Review

Needs Review
No
Historical
No

Dates

Event date
2025-01-22T00:00:00.000Z

Reasoning: 94% recovery is exceptional for dysprosium in this process context.

Positive factors

  • High recovery of 94% for a critical heavy rare earth

Evidence · text

“recoveries of around 94% terbium (Tb) and dysprosium (Dy) using a two-stage acid bake process”
continuous liquor treatmentLofdal · rare earth elementsRecovery: 100 %View all details
Link to this fact

Identity

Project
Lofdal
Commodity
rare earth elements
Region
namibia
Reported Region
Namibia
Ticker
NMI

Test Work

Program Status
detailed
Test Type
continuous liquor treatment
Processing Route
two-stage (primary and secondary) impurity removal/neutralization, followed by Uranium IX and two stages of REE carbonate precipitation using sodium carbonate
Sample
REE carbonate precipitate produced in mini pilot plant

Recovery

Recovery
100 %
Recovery Basis
actual_test

Lab

Laboratory
SGS Lakefield

Review

Needs Review
No
Historical
No

Dates

Event date
2025-01-22T00:00:00.000Z

Reasoning: Almost quantitative recovery of the total REE suite is a very strong metallurgical result.

Positive factors

  • Overall recovery was almost quantitative

Evidence · text

“Overall recovery of REE was almost quantitative”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.