Near Surface Drilling Continues to Expand and Confirm Gold Mineralization

Original announcement by tmx on

Company
Red Pine Exploration Inc.
Ticker
RPX
Exchange
TSX
Region
Ontario
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Drill results
Extracted
2026-09-18 18:59:42 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Red Pine Exploration announced high-grade gold assay results from 18 drill holes at its Wawa Gold Project in Ontario. Highlights include 10.05 g/t gold over 8.59 metres (including 82.80 g/t gold over 0.92 metres) and 35.10 g/t gold over 0.94 metres. The ongoing drill program aims to define and extend near-surface gold mineralization with open pit potential, supporting a Preliminary Economic Assessment (PEA) expected in H1 2026.

Reasoning: The drill results demonstrate significant high-grade gold mineralization, expanding the known footprint and confirming continuity in areas targeted for open-pit development, which is highly positive for the project's economic assessment. Strong QA/QC disclosure adds confidence to the results.

Positive factors

  • Multiple high-grade gold intercepts, including bonanza grades, expand and confirm near-surface mineralization.
  • Drilling is focused on areas with open pit potential, supporting an ongoing Preliminary Economic Assessment (PEA).
  • Infill drilling confirms continuity, and new high-grade zones are indicated.
  • Comprehensive QA/QC procedures are disclosed, including named laboratories and QP sign-off.

Negative factors

  • True widths are provided as a range estimate for the shear zone rather than specific to each intercept, which reduces precision.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 25

Classification and evidence

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: Hole SD-25-616 returned 82.80 g/t gold over 0.92 metres, which is exceptionally high-grade and well above the open pit exceptional threshold of 5 g/t.

Evidence · table

“82.80”

Context: 0.92

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: Hole SD-25-616 returned 51.55 g/t gold over 1.56 metres, which is exceptionally high-grade and well above the open pit exceptional threshold of 5 g/t.

Evidence · table

“51.55”

Context: 1.56

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: Hole SD-25-593 returned 35.10 g/t gold over 0.94 metres, which is exceptionally high-grade and well above the open pit exceptional threshold of 5 g/t.

Evidence · table

“35.10”

Context: 0.94

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: The release includes a dedicated 'Quality Assurance/Quality Control (QA/QC) Measures' section detailing procedures, named laboratories (Actlabs, Agat Laboratories), and methods like blanks, standards, duplicates, and umpire testing.

Evidence · text

“Quality Assurance/Quality Control ("QA/QC") Measures Individual drill core samples are labelled and sawn in half along a pre-marked cutting line. A consistent half-core sample is then placed in an individual numbered plastic sample bag that is sealed. The remaining half-core samples are kept at the Company’s core storage facility located on the Wawa Gold project. Quarter-core duplicates are taken from certain samples to define the variability of gold distribution. Groups of samples are then placed into durable rice bags sealed with security seals to be transported by commercial carrier for analysis at Activation Laboratories Ltd. (Actlabs), Ancaster, Ontario. NQ core assays are obtained by 50-gram fire-assay with a AA finish or by 1-kilogram metallic screen fire assay. The 1-kilogram metallic screen assay method is selected for samples anticipated to contain coarse gold and when the original fire-assay returns results greater or equal to 2.25 g/t Au. The residual coarse reject portions of the samples remain in storage for a minimum 90-day period if further work or verification is needed. As part of its QA/QC program, Red Pine inserts external gold standards (low- to high-grade) and blanks every 20 samples and routinely inserts blanks immediately after samples with visible gold. Quarter core duplicates are routinely inserted to evaluate the natural variability of gold mineralization. Assay certificates are sent to at least three members of the senior management team, and they are directly accessible from the WebLIMS portal of Actlabs. Approximately 5% of the pulps and coarse rejects analyzed at Actlabs are sent to Agat Laboratories in Thunder Bay for umpire testing.”

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: The document clearly states the cut-off grade of 0.40 g/t Au and a maximum of 6.0 m of internal dilution used for calculating intercepts.

Evidence · text

“*Intercepts are calculated using a 0.40 g/t Au cut-off and a maximum of 6.0 m of internal dilution with no capping applied and are reported over core lengths.”

Apparent Width Onlynegative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: The document states that 'True widths are estimated to vary between 50 to 95% of the reported core length in the Jubilee Shear' rather than providing specific true widths for each intercept.

Evidence · text

“True widths are estimated to vary between 50 to 95% of the reported core length in the Jubilee Shear.”

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The drilling program includes 'infill and continuity-focused drilling aimed at evaluating open-pit potential'.

Evidence · text

“Additionally, our infill and continuity-focused drilling aimed at evaluating open-pit potential has confirmed the presence of continuous gold mineralization and indicates that additional high-grade zones remain to be discovered as drill spacing tightens across priority targets.”

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: The drill program is designed to 'define and extend near-surface gold mineralization' and aims to 'expand the mineral inventory' and discover 'additional high-grade zones'.

Evidence · text

“The drill program is designed to define and extend near-surface gold mineralization in the areas with open pit potential that are being evaluated in the ongoing work being done to complete a Preliminary Economic Assessment (“ PEA ”)”

Extracted facts

Stored fact records: 25. Some facts used in scoring do not have a stored record.

Drill Results (25)

SD-25-591Wawa · goldGrade: 7.16Grade Unit: g/tIntercept: 1.25 mView all details
Link to this fact

Identity

Hole ID
SD-25-591
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
7.16
Grade Unit
g/t
Intercept
1.25 m
From
113.8 m
To
115.05 m
Hole Depth
117 m
Intercept Depth
113.8 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-591:113.8-115.05
Mining Method
open_pit

Location

Location
Jubilee Shear – Lower
Easting
668147
Northing
5316711
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept shows good gold grades in the Jubilee Shear, contributing to the overall positive results of the program aimed at defining open-pit potential.

Positive factors

  • High-grade gold intercept (7.16 g/t Au) above the strong threshold for open pit gold (2 g/t).
  • Intercept contributes to the expansion and confirmation of near-surface mineralization.

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“7.16”

Context: 1.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-591Wawa · goldGrade: 12.4Grade Unit: g/tIntercept: 0.69 mView all details
Link to this fact

Identity

Hole ID
SD-25-591
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
12.4
Grade Unit
g/t
Intercept
0.69 m
From
114.36 m
To
115.05 m
Hole Depth
117 m
Intercept Depth
113.8 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-591:114.36-115.05
Mining Method
open_pit

Location

Location
Jubilee Shear – Lower
Easting
668147
Northing
5316711
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This bonanza-grade sub-interval significantly enhances the overall value of the intercept in SD-25-591, indicating high-grade zones within the mineralization.

Positive factors

  • Very high-grade gold intercept (12.40 g/t Au) within a broader interval, exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“12.40”

Context: 0.69

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-593Wawa · goldGrade: 4.63Grade Unit: g/tIntercept: 13.25 mView all details
Link to this fact

Identity

Hole ID
SD-25-593
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
4.63
Grade Unit
g/t
Intercept
13.25 m
From
8.05 m
To
21.3 m
Hole Depth
192 m
Intercept Depth
8.05 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-593:8.05-21.3
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668162
Northing
5316717
Elevation
348 m
Azimuth
105 °
Dip
-66 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This significant intercept in a previously sparsely tested area highlights the potential to expand the mineral resource with open pit potential in the Jubilee Shear.

Positive factors

  • Strong gold intercept (4.63 g/t Au over 13.25 m) in a drilling gap, indicating potential for resource expansion.
  • Grade-thickness product (61.3 g/t*m) is strong, suggesting significant mineralization.

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“4.63”

Context: 13.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-593Wawa · goldGrade: 18.6Grade Unit: g/tIntercept: 1.47 mView all details
Link to this fact

Identity

Hole ID
SD-25-593
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
18.6
Grade Unit
g/t
Intercept
1.47 m
From
12.44 m
To
13.91 m
Hole Depth
192 m
Intercept Depth
8.05 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-593:12.44-13.91
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668162
Northing
5316717
Elevation
348 m
Azimuth
105 °
Dip
-66 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This high-grade sub-interval contributes significantly to the overall positive result of SD-25-593, indicating strong mineralization within the Jubilee Shear.

Positive factors

  • Bonanza-grade gold intercept (18.60 g/t Au) within a broader interval, significantly exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“18.60”

Context: 1.47

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-593Wawa · goldGrade: 14.7Grade Unit: g/tIntercept: 0.88 mView all details
Link to this fact

Identity

Hole ID
SD-25-593
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
14.7
Grade Unit
g/t
Intercept
0.88 m
From
19.24 m
To
20.12 m
Hole Depth
192 m
Intercept Depth
8.05 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-593:19.24-20.12
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668162
Northing
5316717
Elevation
348 m
Azimuth
105 °
Dip
-66 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This high-grade sub-interval further enhances the overall positive result of SD-25-593, indicating strong mineralization within the Jubilee Shear.

Positive factors

  • Bonanza-grade gold intercept (14.70 g/t Au) within a broader interval, significantly exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“14.70”

Context: 0.88

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-593Wawa · goldGrade: 35.1Grade Unit: g/tIntercept: 0.94 mView all details
Link to this fact

Identity

Hole ID
SD-25-593
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
35.1
Grade Unit
g/t
Intercept
0.94 m
From
73.37 m
To
74.31 m
Hole Depth
192 m
Intercept Depth
73.37 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-593:73.37-74.31
Mining Method
open_pit

Location

Easting
668162
Northing
5316717
Elevation
348 m
Azimuth
105 °
Dip
-66 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This very high-grade intercept in SD-25-593 is a significant positive, indicating strong gold mineralization and potential for high-grade zones.

Positive factors

  • Exceptional bonanza-grade gold intercept (35.10 g/t Au), significantly exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“35.10”

Context: 0.94

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-594Wawa · goldGrade: 2.13Grade Unit: g/tIntercept: 1.8 mView all details
Link to this fact

Identity

Hole ID
SD-25-594
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
2.13
Grade Unit
g/t
Intercept
1.8 m
From
20.11 m
To
21.91 m
Hole Depth
117 m
Intercept Depth
20.11 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-594:20.11-21.91
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668124
Northing
5316678
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept confirms gold mineralization in the Jubilee Shear, contributing to the overall understanding of the deposit.

Positive factors

  • Moderate gold intercept (2.13 g/t Au) above the strong threshold for open pit gold (2 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“2.13”

Context: 1.80

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-595Wawa · goldGrade: 0.48Grade Unit: g/tIntercept: 32.11 mView all details
Link to this fact

Identity

Hole ID
SD-25-595
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
0.48
Grade Unit
g/t
Intercept
32.11 m
From
43.65 m
To
75.76 m
Hole Depth
115 m
Intercept Depth
43.65 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-595:43.65-75.76
Mining Method
open_pit

Location

Location
Jubilee Shear - Lower
Easting
668105
Northing
5316641
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept indicates broad, lower-grade mineralization, which could be relevant for bulk-tonnage open-pit scenarios, despite the grade being near the lower end of economic thresholds.

Positive factors

  • Long intercept length (32.11 m) indicates broad mineralization, even at lower grades.
  • Grade-thickness product (15.4 g/t*m) is moderate, suggesting bulk tonnage potential.

Negative factors

  • Grade (0.48 g/t Au) is at the weak threshold for open pit gold (0.3 g/t).
  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“0.48”

Context: 32.11

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-596Wawa · goldGrade: 1.7Grade Unit: g/tIntercept: 1.06 mView all details
Link to this fact

Identity

Hole ID
SD-25-596
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
1.7
Grade Unit
g/t
Intercept
1.06 m
From
12 m
To
13.06 m
Hole Depth
147 m
Intercept Depth
12 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-596:12-13.06
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668039
Northing
5316627
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This narrow intercept confirms gold mineralization but is less material than other results in the release.

Positive factors

  • Moderate gold intercept (1.70 g/t Au) above the moderate threshold for open pit gold (1 g/t).

Negative factors

  • Narrow intercept length (1.06 m).
  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“1.70”

Context: 1.06

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-598Wawa · goldGrade: 5.65Grade Unit: g/tIntercept: 1.67 mView all details
Link to this fact

Identity

Hole ID
SD-25-598
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
5.65
Grade Unit
g/t
Intercept
1.67 m
From
8.02 m
To
9.69 m
Hole Depth
100 m
Intercept Depth
8.02 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-598:8.02-9.69
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668063
Northing
5316572
Elevation
348 m
Azimuth
300 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This high-grade intercept contributes positively to the understanding of the Jubilee Shear's potential for near-surface mineralization.

Positive factors

  • High-grade gold intercept (5.65 g/t Au) exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“5.65”

Context: 1.67

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-599Wawa · goldGrade: 0.7Grade Unit: g/tIntercept: 7.71 mView all details
Link to this fact

Identity

Hole ID
SD-25-599
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
0.7
Grade Unit
g/t
Intercept
7.71 m
From
10.45 m
To
18.16 m
Hole Depth
102 m
Intercept Depth
10.45 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-599:10.45-18.16
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668065
Northing
5316532
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept confirms gold mineralization over a moderate width, contributing to the overall understanding of the Jubilee Shear.

Positive factors

  • Moderate intercept length (7.71 m) with gold grades above the weak threshold for open pit gold (0.3 g/t).

Negative factors

  • Grade (0.70 g/t Au) is below the moderate threshold for open pit gold (1 g/t).
  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“0.70”

Context: 7.71

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-600Wawa · goldGrade: 0.94Grade Unit: g/tIntercept: 9.16 mView all details
Link to this fact

Identity

Hole ID
SD-25-600
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
0.94
Grade Unit
g/t
Intercept
9.16 m
From
8.84 m
To
18 m
Hole Depth
99 m
Intercept Depth
8.84 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-600:8.84-18
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668050
Northing
5316488
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept confirms gold mineralization over a moderate width, contributing to the overall understanding of the Jubilee Shear.

Positive factors

  • Moderate intercept length (9.16 m) with gold grades above the weak threshold for open pit gold (0.3 g/t).

Negative factors

  • Grade (0.94 g/t Au) is below the moderate threshold for open pit gold (1 g/t).
  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“0.94”

Context: 9.16

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-601Wawa · goldGrade: 1.51Grade Unit: g/tIntercept: 4.48 mView all details
Link to this fact

Identity

Hole ID
SD-25-601
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
1.51
Grade Unit
g/t
Intercept
4.48 m
From
13.18 m
To
17.66 m
Hole Depth
126 m
Intercept Depth
13.18 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-601:13.18-17.66
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668033
Northing
5316454
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept confirms gold mineralization in the Jubilee Shear, contributing to the overall understanding of the deposit.

Positive factors

  • Moderate gold intercept (1.51 g/t Au) above the moderate threshold for open pit gold (1 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“1.51”

Context: 4.48

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-601Wawa · goldGrade: 3.85Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
SD-25-601
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
3.85
Grade Unit
g/t
Intercept
2 m
From
121.27 m
To
123.27 m
Hole Depth
126 m
Intercept Depth
121.27 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-601:121.27-123.27
Mining Method
open_pit

Location

Location
Jubilee Shear – Lower
Easting
668033
Northing
5316454
Elevation
348 m
Azimuth
300 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept shows good gold grades in the Jubilee Shear, contributing to the overall positive results of the program aimed at defining open-pit potential.

Positive factors

  • High-grade gold intercept (3.85 g/t Au) above the strong threshold for open pit gold (2 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“3.85”

Context: 2.00

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-605Wawa · goldGrade: 1.85Grade Unit: g/tIntercept: 2.44 mView all details
Link to this fact

Identity

Hole ID
SD-25-605
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
1.85
Grade Unit
g/t
Intercept
2.44 m
From
39 m
To
41.44 m
Hole Depth
130 m
Intercept Depth
39 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-605:39-41.44
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668264
Northing
5316986
Elevation
364 m
Azimuth
285 °
Dip
-47 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept confirms gold mineralization in the Jubilee Shear, contributing to the overall understanding of the deposit.

Positive factors

  • Moderate gold intercept (1.85 g/t Au) above the moderate threshold for open pit gold (1 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“1.85”

Context: 2.44

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-605Wawa · goldGrade: 3.99Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
SD-25-605
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
3.99
Grade Unit
g/t
Intercept
1 m
From
39 m
To
40 m
Hole Depth
130 m
Intercept Depth
39 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-605:39-40
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668264
Northing
5316986
Elevation
364 m
Azimuth
285 °
Dip
-47 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This high-grade sub-interval enhances the overall value of the intercept in SD-25-605, indicating stronger mineralization within the broader zone.

Positive factors

  • High-grade gold intercept (3.99 g/t Au) above the strong threshold for open pit gold (2 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“3.99”

Context: 1.00

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-606Wawa · goldGrade: 1.21Grade Unit: g/tIntercept: 10.04 mView all details
Link to this fact

Identity

Hole ID
SD-25-606
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
1.21
Grade Unit
g/t
Intercept
10.04 m
From
23.26 m
To
33.3 m
Hole Depth
120 m
Intercept Depth
23.26 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-606:23.26-33.3
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668219
Northing
5316971
Elevation
361 m
Azimuth
295 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept confirms continuous gold mineralization over a good width, supporting the open-pit potential of the Jubilee Shear.

Positive factors

  • Moderate gold intercept (1.21 g/t Au) over a good width (10.04 m), above the moderate threshold for open pit gold (1 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“1.21”

Context: 10.04

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-606Wawa · goldGrade: 6.88Grade Unit: g/tIntercept: 1.01 mView all details
Link to this fact

Identity

Hole ID
SD-25-606
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
6.88
Grade Unit
g/t
Intercept
1.01 m
From
24.34 m
To
25.35 m
Hole Depth
120 m
Intercept Depth
23.26 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-606:24.34-25.35
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668219
Northing
5316971
Elevation
361 m
Azimuth
295 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This high-grade sub-interval enhances the overall value of the intercept in SD-25-606, indicating stronger mineralization within the broader zone.

Positive factors

  • High-grade gold intercept (6.88 g/t Au) within a broader interval, exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“6.88”

Context: 1.01

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-607Wawa · goldGrade: 1.12Grade Unit: g/tIntercept: 11.33 mView all details
Link to this fact

Identity

Hole ID
SD-25-607
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
1.12
Grade Unit
g/t
Intercept
11.33 m
From
52.67 m
To
64 m
Hole Depth
155 m
Intercept Depth
52.67 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-607:52.67-64
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668254
Northing
5316883
Elevation
360 m
Azimuth
283 °
Dip
-47 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept confirms continuous gold mineralization over a good width, supporting the open-pit potential of the Jubilee Shear.

Positive factors

  • Moderate gold intercept (1.12 g/t Au) over a good width (11.33 m), above the moderate threshold for open pit gold (1 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“1.12”

Context: 11.33

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-607Wawa · goldGrade: 7.63Grade Unit: g/tIntercept: 1 mView all details
Link to this fact

Identity

Hole ID
SD-25-607
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
7.63
Grade Unit
g/t
Intercept
1 m
From
61 m
To
62 m
Hole Depth
155 m
Intercept Depth
52.67 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-607:61-62
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668254
Northing
5316883
Elevation
360 m
Azimuth
283 °
Dip
-47 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This high-grade sub-interval enhances the overall value of the intercept in SD-25-607, indicating stronger mineralization within the broader zone.

Positive factors

  • High-grade gold intercept (7.63 g/t Au) within a broader interval, exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“7.63”

Context: 1.00

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-608Wawa · goldGrade: 0.97Grade Unit: g/tIntercept: 14.47 mView all details
Link to this fact

Identity

Hole ID
SD-25-608
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
0.97
Grade Unit
g/t
Intercept
14.47 m
From
45.25 m
To
59.72 m
Hole Depth
135 m
Intercept Depth
45.25 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-608:45.25-59.72
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668237
Northing
5316831
Elevation
358 m
Azimuth
290 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This intercept confirms continuous gold mineralization over a good width, supporting the open-pit potential of the Jubilee Shear, though at lower grades.

Positive factors

  • Long intercept length (14.47 m) with gold grades above the weak threshold for open pit gold (0.3 g/t).

Negative factors

  • Grade (0.97 g/t Au) is below the moderate threshold for open pit gold (1 g/t).
  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“0.97”

Context: 14.47

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-608Wawa · goldGrade: 6.84Grade Unit: g/tIntercept: 1.05 mView all details
Link to this fact

Identity

Hole ID
SD-25-608
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
6.84
Grade Unit
g/t
Intercept
1.05 m
From
58.67 m
To
59.72 m
Hole Depth
135 m
Intercept Depth
45.25 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-608:58.67-59.72
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668237
Northing
5316831
Elevation
358 m
Azimuth
290 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This high-grade sub-interval enhances the overall value of the intercept in SD-25-608, indicating stronger mineralization within the broader zone.

Positive factors

  • High-grade gold intercept (6.84 g/t Au) within a broader interval, exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“6.84”

Context: 1.05

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-616Wawa · goldGrade: 10.05Grade Unit: g/tIntercept: 8.59 mView all details
Link to this fact

Identity

Hole ID
SD-25-616
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
10.05
Grade Unit
g/t
Intercept
8.59 m
From
36.23 m
To
44.82 m
Hole Depth
111 m
Intercept Depth
36.23 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-616:36.23-44.82
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668103
Northing
5316491
Elevation
355 m
Azimuth
293 °
Dip
-54 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This is a highly significant intercept with exceptional gold grades over a good width, confirming and potentially increasing the high-grade mineral inventory in the Jubilee area.

Positive factors

  • Exceptional high-grade gold intercept (10.05 g/t Au over 8.59 m), significantly exceeding the exceptional threshold for open pit gold (5 g/t).
  • Grade-thickness product (86.7 g/t*m) is strong, indicating significant mineralization.
  • This infill drilling result could increase the high-grade mineral inventory.

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“10.05”

Context: 8.59

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-616Wawa · goldGrade: 51.55Grade Unit: g/tIntercept: 1.56 mView all details
Link to this fact

Identity

Hole ID
SD-25-616
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
51.55
Grade Unit
g/t
Intercept
1.56 m
From
39.33 m
To
40.89 m
Hole Depth
111 m
Intercept Depth
36.23 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-616:39.33-40.89
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668103
Northing
5316491
Elevation
355 m
Azimuth
293 °
Dip
-54 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This extremely high-grade sub-interval is a bonanza intercept, significantly enhancing the overall value of SD-25-616 and indicating very rich gold mineralization.

Positive factors

  • Bonanza-grade gold intercept (51.55 g/t Au) within a broader exceptional interval, significantly exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“51.55”

Context: 1.56

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

SD-25-616Wawa · goldGrade: 82.8Grade Unit: g/tIntercept: 0.92 mView all details
Link to this fact

Identity

Hole ID
SD-25-616
Project
Wawa
Commodity
gold
Region
canada_on
Reported Region
canada_on
Ticker
RPX

Geometry

Grade
82.8
Grade Unit
g/t
Intercept
0.92 m
From
39.33 m
To
40.25 m
Hole Depth
111 m
Intercept Depth
36.23 m

Classification

Program
mixed
Sample Type
drill
Group ID
SD-25-616:39.33-40.25
Mining Method
open_pit

Location

Location
Jubilee Shear - Main
Easting
668103
Northing
5316491
Elevation
355 m
Azimuth
293 °
Dip
-54 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs) and Agat Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, umpire

Compositing

Cutoff Grade
0.4
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
6 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2025-12-16T00:00:00.000Z

Reasoning: This extremely high-grade sub-interval is a bonanza intercept, further enhancing the overall value of SD-25-616 and indicating very rich gold mineralization.

Positive factors

  • Exceptional bonanza-grade gold intercept (82.80 g/t Au) within a broader exceptional interval, significantly exceeding the exceptional threshold for open pit gold (5 g/t).

Negative factors

  • True width is estimated as a range for the shear zone, not specific to this intercept.

Evidence · table

“82.80”

Context: 0.92

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.