# Osisko Intersects 256 Metres Averaging 0.85% Cu at Gasp&amp;\#xE9;

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9

Original source: https://money.tmx.com/en/quote/OM/news/4749616902010689/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9

Publisher: tmx

Original announcement: 2026-09-10T10:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Osisko Metals Incorporated

- Ticker: OM

- Exchange: TSX

- Region: Eastern Québec

- Primary commodity: Copper

- Secondary commodities: Silver, Molybdenum, Zinc

- Document categories: Drill results, Resource update

- Extracted: 2026-09-18 14:25:58 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Osisko Metals announced new drill results from its Gaspé Copper Project in Eastern Québec, highlighted by a 256.5-metre intercept averaging 0.85% copper in hole 30-1228, including a high-grade section of 28.5 metres at 4.74% copper and 27.4 g/t silver. This intercept represents a significant out-of-pit expansion. The drill program also included other expansion and infill holes, with the infill drilling aimed at upgrading existing Inferred Mineral Resources to higher confidence categories.

Reasoning: Osisko Metals reported exceptional drill results from its Gaspé Copper Project, including a bonanza-grade intercept of 4.74% Cu over 28.5m within a broader 256.5m interval averaging 0.85% Cu in hole 30-1228, significantly extending mineralization outside the current resource model. The program also delivered other strong expansion and infill results, with transparent QA/QC and metal equivalent calculations.

- Positive factor: Bonanza Intercept in 30-1228 \(4.74% Cu over 28.5m\)

- Positive factor: Significant Step-Out Extension \(256.5m at 0.85% Cu in 30-1228\)

- Positive factor: High-grade copper results above peer average

- Positive factor: Good width intercepts

- Positive factor: QA/QC procedures and lab accreditation disclosed

- Positive factor: Metal equivalent assumptions transparently stated

- Negative factor: True width is estimated generally, not specifically stated for each intercept

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 45

## Classification and evidence

No classification tags are available.

## Extracted facts

Stored fact records: 45. Some facts used in scoring do not have a stored record.

## Drill Results (45)

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-0)

Gaspé · copper

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.24
- Grade Unit: %
- Intercept: 28 m
- From: 123 m
- To: 151 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:123-151
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.24
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.24% Cu over 28m is below the project's average grade \(0.58% Cu\) and below the 75th percentile for porphyry copper deposits \(0.63% Cu\), but contributes to in-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.24

Context: 28.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-1)

Gaspé · silver

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 2.35
- Grade Unit: g/t
- Intercept: 28 m
- From: 123 m
- To: 151 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:123-151
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.24
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 2.35 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 2.35

Context: 28.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-2)

Gaspé · copper

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.16
- Grade Unit: %
- Intercept: 48 m
- From: 318 m
- To: 366 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:318-366
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.3
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.16% Cu over 48m is below the project's average grade \(0.58% Cu\) but contributes to in-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.16

Context: 48.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-3)

Gaspé · silver

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.28
- Grade Unit: g/t
- Intercept: 48 m
- From: 318 m
- To: 366 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:318-366
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.3
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.28 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.28

Context: 48.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-4)

Gaspé · molybdenum

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: molybdenum
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.041
- Grade Unit: %
- Intercept: 48 m
- From: 318 m
- To: 366 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:318-366
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.3
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Molybdenum grade of 0.041% is close to the project's average \(0.044% Mo\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.041

Context: 48.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-5)

Gaspé · copper

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.15
- Grade Unit: %
- Intercept: 38 m
- From: 390 m
- To: 428 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:390-428
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.29
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.15% Cu over 38m is below the project's average grade \(0.58% Cu\) but contributes to in-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.15

Context: 38.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-6)

Gaspé · silver

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.44
- Grade Unit: g/t
- Intercept: 38 m
- From: 390 m
- To: 428 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:390-428
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.29
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.44 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.44

Context: 38.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-7)

Gaspé · molybdenum

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: molybdenum
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.039
- Grade Unit: %
- Intercept: 38 m
- From: 390 m
- To: 428 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:390-428
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.29
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Molybdenum grade of 0.039% is close to the project's average \(0.044% Mo\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.039

Context: 38.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-8)

Gaspé · copper

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.2
- Grade Unit: %
- Intercept: 153.2 m
- From: 546.8 m
- To: 700 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:546.8-700
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.28
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.20% Cu over 153.2m is below the project's average grade \(0.58% Cu\) but represents a significant out-of-pit expansion, extending mineralization to a vertical depth of 660m.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.20

Context: 153.2

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-9)

Gaspé · silver

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.58
- Grade Unit: g/t
- Intercept: 153.2 m
- From: 546.8 m
- To: 700 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:546.8-700
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.28
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.58 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.58

Context: 153.2

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1224

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-10)

Gaspé · molybdenum

#### Identity

- Hole ID: 30-1224
- Project: Gaspé
- Commodity: molybdenum
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.023
- Grade Unit: %
- Intercept: 153.2 m
- From: 546.8 m
- To: 700 m
- Hole Depth: 741 m
- Intercept Depth: 123 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1224:546.8-700
- Mining Method: open\_pit

#### Location

- Easting: 315787
- Northing: 5425813
- Elevation: 569 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.28
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Molybdenum grade of 0.023% is below the project's average \(0.044% Mo\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.023

Context: 153.2

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1225

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-11)

Gaspé · copper

#### Identity

- Hole ID: 30-1225
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.14
- Grade Unit: %
- Intercept: 18 m
- From: 57 m
- To: 75 m
- Hole Depth: 266 m
- Intercept Depth: 57 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1225:57-75
- Mining Method: open\_pit

#### Location

- Easting: 315352
- Northing: 5425252
- Elevation: 734 m
- Azimuth: 98 °
- Dip: -47 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.14
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.14% Cu over 18m is below the project's average grade \(0.58% Cu\) and below the 25th percentile for porphyry copper deposits \(0.17% Cu\), but contributes to out-of-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.14

Context: 18.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1225

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-12)

Gaspé · silver

#### Identity

- Hole ID: 30-1225
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.07
- Grade Unit: g/t
- Intercept: 18 m
- From: 57 m
- To: 75 m
- Hole Depth: 266 m
- Intercept Depth: 57 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1225:57-75
- Mining Method: open\_pit

#### Location

- Easting: 315352
- Northing: 5425252
- Elevation: 734 m
- Azimuth: 98 °
- Dip: -47 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.14
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.07 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.07

Context: 18.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1225

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-13)

Gaspé · copper

#### Identity

- Hole ID: 30-1225
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.36
- Grade Unit: %
- Intercept: 52.7 m
- From: 88.3 m
- To: 141 m
- Hole Depth: 266 m
- Intercept Depth: 57 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1225:88.3-141
- Mining Method: open\_pit

#### Location

- Easting: 315352
- Northing: 5425252
- Elevation: 734 m
- Azimuth: 98 °
- Dip: -47 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.37
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.36% Cu over 52.7m is below the project's average grade \(0.58% Cu\) but above the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to out-of-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.36

Context: 52.7

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1225

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-14)

Gaspé · silver

#### Identity

- Hole ID: 30-1225
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 2.11
- Grade Unit: g/t
- Intercept: 52.7 m
- From: 88.3 m
- To: 141 m
- Hole Depth: 266 m
- Intercept Depth: 57 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1225:88.3-141
- Mining Method: open\_pit

#### Location

- Easting: 315352
- Northing: 5425252
- Elevation: 734 m
- Azimuth: 98 °
- Dip: -47 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.37
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 2.11 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 2.11

Context: 52.7

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1225

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-15)

Gaspé · copper

#### Identity

- Hole ID: 30-1225
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.74
- Grade Unit: %
- Intercept: 49.7 m
- From: 178.3 m
- To: 228 m
- Hole Depth: 266 m
- Intercept Depth: 57 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1225:178.3-228
- Mining Method: open\_pit

#### Location

- Easting: 315352
- Northing: 5425252
- Elevation: 734 m
- Azimuth: 98 °
- Dip: -47 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.75
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.74% Cu over 49.7m is above the project's average grade \(0.58% Cu\) and above the 75th percentile for porphyry copper deposits \(0.63% Cu\), representing a strong out-of-pit expansion.

- Positive factor: High-grade copper above peer average

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.74

Context: 49.7

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1225

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-16)

Gaspé · silver

#### Identity

- Hole ID: 30-1225
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 3.86
- Grade Unit: g/t
- Intercept: 49.7 m
- From: 178.3 m
- To: 228 m
- Hole Depth: 266 m
- Intercept Depth: 57 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1225:178.3-228
- Mining Method: open\_pit

#### Location

- Easting: 315352
- Northing: 5425252
- Elevation: 734 m
- Azimuth: 98 °
- Dip: -47 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.75
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 3.86 g/t is below the project's average \(4.877 g/t\) but contributes to out-of-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 3.86

Context: 49.7

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1225

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-17)

Gaspé · copper

#### Identity

- Hole ID: 30-1225
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.19
- Grade Unit: %
- Intercept: 6 m
- From: 259.5 m
- To: 265.5 m
- Hole Depth: 266 m
- Intercept Depth: 57 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1225:259.5-265.5
- Mining Method: open\_pit

#### Location

- Easting: 315352
- Northing: 5425252
- Elevation: 734 m
- Azimuth: 98 °
- Dip: -47 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 1.2
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 1.19% Cu over 6m is significantly above the project's average grade \(0.58% Cu\) and above the 75th percentile for porphyry copper deposits \(0.63% Cu\), representing a strong out-of-pit expansion.

- Positive factor: High-grade copper above peer average

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.19

Context: 6.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1225

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-18)

Gaspé · silver

#### Identity

- Hole ID: 30-1225
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 6.1
- Grade Unit: g/t
- Intercept: 6 m
- From: 259.5 m
- To: 265.5 m
- Hole Depth: 266 m
- Intercept Depth: 57 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1225:259.5-265.5
- Mining Method: open\_pit

#### Location

- Easting: 315352
- Northing: 5425252
- Elevation: 734 m
- Azimuth: 98 °
- Dip: -47 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 1.2
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 6.1 g/t is above the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 6.10

Context: 6.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1226

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-19)

Gaspé · copper

#### Identity

- Hole ID: 30-1226
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.44
- Grade Unit: %
- Intercept: 101 m
- From: 43 m
- To: 144 m
- Hole Depth: 435 m
- Intercept Depth: 43 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1226:43-144
- Mining Method: open\_pit

#### Location

- Easting: 315961
- Northing: 5425168
- Elevation: 701 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.45
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.44% Cu over 101m is below the project's average grade \(0.58% Cu\) but above the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to in-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.44

Context: 101.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1226

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-20)

Gaspé · silver

#### Identity

- Hole ID: 30-1226
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 2.35
- Grade Unit: g/t
- Intercept: 101 m
- From: 43 m
- To: 144 m
- Hole Depth: 435 m
- Intercept Depth: 43 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1226:43-144
- Mining Method: open\_pit

#### Location

- Easting: 315961
- Northing: 5425168
- Elevation: 701 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.45
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 2.35 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 2.35

Context: 101.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1226

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-21)

Gaspé · copper

#### Identity

- Hole ID: 30-1226
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.31
- Grade Unit: %
- Intercept: 18 m
- From: 196.5 m
- To: 214.5 m
- Hole Depth: 435 m
- Intercept Depth: 43 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1226:196.5-214.5
- Mining Method: open\_pit

#### Location

- Easting: 315961
- Northing: 5425168
- Elevation: 701 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.32
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.31% Cu over 18m is below the project's average grade \(0.58% Cu\) but above the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to out-of-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.31

Context: 18.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1226

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-22)

Gaspé · silver

#### Identity

- Hole ID: 30-1226
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 2.07
- Grade Unit: g/t
- Intercept: 18 m
- From: 196.5 m
- To: 214.5 m
- Hole Depth: 435 m
- Intercept Depth: 43 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1226:196.5-214.5
- Mining Method: open\_pit

#### Location

- Easting: 315961
- Northing: 5425168
- Elevation: 701 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.32
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 2.07 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 2.07

Context: 18.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1226

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-23)

Gaspé · copper

#### Identity

- Hole ID: 30-1226
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.24
- Grade Unit: %
- Intercept: 28.5 m
- From: 295.5 m
- To: 324 m
- Hole Depth: 435 m
- Intercept Depth: 43 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1226:295.5-324
- Mining Method: open\_pit

#### Location

- Easting: 315961
- Northing: 5425168
- Elevation: 701 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.24
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.24% Cu over 28.5m is below the project's average grade \(0.58% Cu\) but above the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to out-of-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.24

Context: 28.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1226

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-24)

Gaspé · silver

#### Identity

- Hole ID: 30-1226
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 2.73
- Grade Unit: g/t
- Intercept: 28.5 m
- From: 295.5 m
- To: 324 m
- Hole Depth: 435 m
- Intercept Depth: 43 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1226:295.5-324
- Mining Method: open\_pit

#### Location

- Easting: 315961
- Northing: 5425168
- Elevation: 701 m
- Azimuth: 70 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.24
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 2.73 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 2.73

Context: 28.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-25)

Gaspé · copper

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.2
- Grade Unit: %
- Intercept: 31 m
- From: 73 m
- To: 104 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: resource
- Sample Type: drill
- Group ID: 30-1227:73-104
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.2
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This infill intercept of 0.20% Cu over 31m is below the project's average grade \(0.58% Cu\) but above the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to resource definition.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.20

Context: 31.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "resource"

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-26)

Gaspé · silver

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.54
- Grade Unit: g/t
- Intercept: 31 m
- From: 73 m
- To: 104 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: resource
- Sample Type: drill
- Group ID: 30-1227:73-104
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.2
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.54 g/t is below the project's average \(4.877 g/t\) for this infill intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.54

Context: 31.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill\_program\_type is "resource"

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-27)

Gaspé · copper

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.25
- Grade Unit: %
- Intercept: 28.5 m
- From: 144 m
- To: 172.5 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:144-172.5
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.27
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.25% Cu over 28.5m is below the project's average grade \(0.58% Cu\) but above the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to in-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.25

Context: 28.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-28)

Gaspé · silver

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 2.24
- Grade Unit: g/t
- Intercept: 28.5 m
- From: 144 m
- To: 172.5 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:144-172.5
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.27
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 2.24 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 2.24

Context: 28.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-29)

Gaspé · molybdenum

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: molybdenum
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.005
- Grade Unit: %
- Intercept: 28.5 m
- From: 144 m
- To: 172.5 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:144-172.5
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.27
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Molybdenum grade of 0.005% is below the project's average \(0.044% Mo\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.005

Context: 28.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-30)

Gaspé · copper

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.18
- Grade Unit: %
- Intercept: 22 m
- From: 204 m
- To: 226 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:204-226
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.23
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.18% Cu over 22m is below the project's average grade \(0.58% Cu\) but above the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to in-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.18

Context: 22.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-31)

Gaspé · silver

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.57
- Grade Unit: g/t
- Intercept: 22 m
- From: 204 m
- To: 226 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:204-226
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.23
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.57 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.57

Context: 22.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-32)

Gaspé · molybdenum

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: molybdenum
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.014
- Grade Unit: %
- Intercept: 22 m
- From: 204 m
- To: 226 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:204-226
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.23
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Molybdenum grade of 0.014% is below the project's average \(0.044% Mo\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.014

Context: 22.0

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-33)

Gaspé · copper

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.16
- Grade Unit: %
- Intercept: 23.5 m
- From: 254 m
- To: 277.5 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:254-277.5
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.18
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.16% Cu over 23.5m is below the project's average grade \(0.58% Cu\) and near the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to in-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.16

Context: 23.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-34)

Gaspé · silver

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.67
- Grade Unit: g/t
- Intercept: 23.5 m
- From: 254 m
- To: 277.5 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:254-277.5
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.18
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.67 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.67

Context: 23.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1227

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-35)

Gaspé · molybdenum

#### Identity

- Hole ID: 30-1227
- Project: Gaspé
- Commodity: molybdenum
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.008
- Grade Unit: %
- Intercept: 23.5 m
- From: 254 m
- To: 277.5 m
- Hole Depth: 339 m
- Intercept Depth: 73 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1227:254-277.5
- Mining Method: open\_pit

#### Location

- Easting: 316101
- Northing: 5425612
- Elevation: 571 m
- Azimuth: 248 °
- Dip: -70 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.18
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Molybdenum grade of 0.008% is below the project's average \(0.044% Mo\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.008

Context: 23.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1228

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-36)

Gaspé · copper

#### Identity

- Hole ID: 30-1228
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.85
- Grade Unit: %
- Intercept: 256.5 m
- From: 33 m
- To: 289.5 m
- Hole Depth: 345 m
- Intercept Depth: 33 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1228:33-289.5
- Mining Method: open\_pit

#### Location

- Easting: 315357
- Northing: 5425341
- Elevation: 725 m
- Azimuth: 130 °
- Dip: -74 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.86
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This exceptional intercept of 0.85% Cu over 256.5m is significantly above the project's average grade \(0.58% Cu\) and above the 75th percentile for porphyry copper deposits \(0.63% Cu\). Its grade-thickness product \(218 %\*m\) is strong, and it represents a significant out-of-pit expansion, extending mineralization 800m west of the MRE model.

- Positive factor: High-grade copper above peer average

- Positive factor: Exceptional width

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Positive factor: Step-Out Extension

- Negative factor: Apparent Width Only

Evidence · table

> 0.85

Context: 256.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Step-Out Extension**

Polarity: positive

Definition: Mineralization extended beyond the previously known limit.

Why it applies: Mineralization extended beyond the previously known limit.

Evidence · text

> Drill hole 30-1228, located on the western margin of the Needle Mountain pit, is a southeasterly dipping hole that was drilled under the pit wall, threading through pillars of both the B Zone and C Zone underground workings. It cut one long mineralized interval \(out-of-pit expansion\) comprising 256.5 metres averaging 0.85% Cu and 5.13 g/t Ag, including a high grade sub-interval of 28.5 metres averaging 4.74% Cu and 27.4 g/t Ag \(C Zone level\). Mineralization in this drill hole extended 50 metres below the C Zone to a vertical depth of 275 metres. This drill hole demonstrates the potential for higher grade mineralization surrounding old underground workings, within residual pillars, between the B and C Zones and deeper below the C Zone.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1228

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-37)

Gaspé · silver

#### Identity

- Hole ID: 30-1228
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 5.13
- Grade Unit: g/t
- Intercept: 256.5 m
- From: 33 m
- To: 289.5 m
- Hole Depth: 345 m
- Intercept Depth: 33 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1228:33-289.5
- Mining Method: open\_pit

#### Location

- Easting: 315357
- Northing: 5425341
- Elevation: 725 m
- Azimuth: 130 °
- Dip: -74 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.86
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 5.13 g/t over 256.5m is above the project's average \(4.877 g/t\) and contributes to a significant out-of-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Positive factor: Step-Out Extension

- Negative factor: Apparent Width Only

Evidence · table

> 5.13

Context: 256.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Step-Out Extension**

Polarity: positive

Definition: Mineralization extended beyond the previously known limit.

Why it applies: Mineralization extended beyond the previously known limit.

Evidence · text

> Drill hole 30-1228, located on the western margin of the Needle Mountain pit, is a southeasterly dipping hole that was drilled under the pit wall, threading through pillars of both the B Zone and C Zone underground workings. It cut one long mineralized interval \(out-of-pit expansion\) comprising 256.5 metres averaging 0.85% Cu and 5.13 g/t Ag, including a high grade sub-interval of 28.5 metres averaging 4.74% Cu and 27.4 g/t Ag \(C Zone level\). Mineralization in this drill hole extended 50 metres below the C Zone to a vertical depth of 275 metres. This drill hole demonstrates the potential for higher grade mineralization surrounding old underground workings, within residual pillars, between the B and C Zones and deeper below the C Zone.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1228

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-38)

Gaspé · copper

#### Identity

- Hole ID: 30-1228
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 4.74
- Grade Unit: %
- Intercept: 28.5 m
- From: 199.5 m
- To: 228 m
- Hole Depth: 345 m
- Intercept Depth: 33 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1228:199.5-228
- Mining Method: open\_pit

#### Location

- Easting: 315357
- Northing: 5425341
- Elevation: 725 m
- Azimuth: 130 °
- Dip: -74 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 4.78
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This bonanza intercept of 4.74% Cu over 28.5m is exceptionally high-grade, far exceeding the project's average \(0.58% Cu\) and the 75th percentile for porphyry copper deposits \(0.63% Cu\). Its grade-thickness product \(135 %\*m\) is strong, and it contributes to a significant out-of-pit expansion.

- Positive factor: Bonanza Intercept

- Positive factor: High-grade copper above peer average

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Positive factor: Step-Out Extension

- Negative factor: Apparent Width Only

Evidence · table

> 4.74

Context: 28.5

#### Tags used in scoring

**Bonanza Intercept**

Polarity: positive

Definition: Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: Exceptionally high-grade zone, well above the deposit-type norm.

Evidence · text

> 4.74% Cu

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Step-Out Extension**

Polarity: positive

Definition: Mineralization extended beyond the previously known limit.

Why it applies: Mineralization extended beyond the previously known limit.

Evidence · text

> Drill hole 30-1228, located on the western margin of the Needle Mountain pit, is a southeasterly dipping hole that was drilled under the pit wall, threading through pillars of both the B Zone and C Zone underground workings. It cut one long mineralized interval \(out-of-pit expansion\) comprising 256.5 metres averaging 0.85% Cu and 5.13 g/t Ag, including a high grade sub-interval of 28.5 metres averaging 4.74% Cu and 27.4 g/t Ag \(C Zone level\). Mineralization in this drill hole extended 50 metres below the C Zone to a vertical depth of 275 metres. This drill hole demonstrates the potential for higher grade mineralization surrounding old underground workings, within residual pillars, between the B and C Zones and deeper below the C Zone.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1228

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-39)

Gaspé · silver

#### Identity

- Hole ID: 30-1228
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 27.4
- Grade Unit: g/t
- Intercept: 28.5 m
- From: 199.5 m
- To: 228 m
- Hole Depth: 345 m
- Intercept Depth: 33 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1228:199.5-228
- Mining Method: open\_pit

#### Location

- Easting: 315357
- Northing: 5425341
- Elevation: 725 m
- Azimuth: 130 °
- Dip: -74 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 4.78
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 27.4 g/t over 28.5m is significantly above the project's average \(4.877 g/t\) and represents a bonanza intercept, contributing to a significant out-of-pit expansion.

- Positive factor: Bonanza Intercept

- Positive factor: High-grade silver above project average

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Positive factor: Step-Out Extension

- Negative factor: Apparent Width Only

Evidence · table

> 27.4

Context: 28.5

#### Tags used in scoring

**Bonanza Intercept**

Polarity: positive

Definition: Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: Exceptionally high-grade zone, well above the deposit-type norm.

Evidence · text

> 27.4 g/t Ag

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Step-Out Extension**

Polarity: positive

Definition: Mineralization extended beyond the previously known limit.

Why it applies: Mineralization extended beyond the previously known limit.

Evidence · text

> Drill hole 30-1228, located on the western margin of the Needle Mountain pit, is a southeasterly dipping hole that was drilled under the pit wall, threading through pillars of both the B Zone and C Zone underground workings. It cut one long mineralized interval \(out-of-pit expansion\) comprising 256.5 metres averaging 0.85% Cu and 5.13 g/t Ag, including a high grade sub-interval of 28.5 metres averaging 4.74% Cu and 27.4 g/t Ag \(C Zone level\). Mineralization in this drill hole extended 50 metres below the C Zone to a vertical depth of 275 metres. This drill hole demonstrates the potential for higher grade mineralization surrounding old underground workings, within residual pillars, between the B and C Zones and deeper below the C Zone.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1228

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-40)

Gaspé · molybdenum

#### Identity

- Hole ID: 30-1228
- Project: Gaspé
- Commodity: molybdenum
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.005
- Grade Unit: %
- Intercept: 28.5 m
- From: 199.5 m
- To: 228 m
- Hole Depth: 345 m
- Intercept Depth: 33 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1228:199.5-228
- Mining Method: open\_pit

#### Location

- Easting: 315357
- Northing: 5425341
- Elevation: 725 m
- Azimuth: 130 °
- Dip: -74 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 4.78
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Molybdenum grade of 0.005% is below detection limit, indicating minimal contribution from this metal in this intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Positive factor: Step-Out Extension

- Negative factor: Apparent Width Only

Evidence · table

> 0.005

Context: 28.5

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Step-Out Extension**

Polarity: positive

Definition: Mineralization extended beyond the previously known limit.

Why it applies: Mineralization extended beyond the previously known limit.

Evidence · text

> Drill hole 30-1228, located on the western margin of the Needle Mountain pit, is a southeasterly dipping hole that was drilled under the pit wall, threading through pillars of both the B Zone and C Zone underground workings. It cut one long mineralized interval \(out-of-pit expansion\) comprising 256.5 metres averaging 0.85% Cu and 5.13 g/t Ag, including a high grade sub-interval of 28.5 metres averaging 4.74% Cu and 27.4 g/t Ag \(C Zone level\). Mineralization in this drill hole extended 50 metres below the C Zone to a vertical depth of 275 metres. This drill hole demonstrates the potential for higher grade mineralization surrounding old underground workings, within residual pillars, between the B and C Zones and deeper below the C Zone.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1229

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-41)

Gaspé · copper

#### Identity

- Hole ID: 30-1229
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.34
- Grade Unit: %
- Intercept: 137.5 m
- From: 19.5 m
- To: 157 m
- Hole Depth: 162 m
- Intercept Depth: 19.5 m

#### Classification

- Deposit Type: porphyry
- Program: resource
- Sample Type: drill
- Group ID: 30-1229:19.5-157
- Mining Method: open\_pit

#### Location

- Easting: 316420
- Northing: 5425456
- Elevation: 612 m
- Azimuth: 0 °
- Dip: -90 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.34
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This infill intercept of 0.34% Cu over 137.5m is below the project's average grade \(0.58% Cu\) but above the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to resource definition.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.34

Context: 137.5

#### Tags used in scoring

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: Confirmatory drilling to raise resource confidence, not new discovery.

Evidence · text

> Drill hole 30-1229, located at the southern end of the 2026 MRE model on the northern flank of Needle East Mountain, is an infill vertical hole that was drilled to test around and under historical underground workings to a level below the C Zone.

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1229

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-42)

Gaspé · silver

#### Identity

- Hole ID: 30-1229
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.33
- Grade Unit: g/t
- Intercept: 137.5 m
- From: 19.5 m
- To: 157 m
- Hole Depth: 162 m
- Intercept Depth: 19.5 m

#### Classification

- Deposit Type: porphyry
- Program: resource
- Sample Type: drill
- Group ID: 30-1229:19.5-157
- Mining Method: open\_pit

#### Location

- Easting: 316420
- Northing: 5425456
- Elevation: 612 m
- Azimuth: 0 °
- Dip: -90 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.34
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.33 g/t is below the project's average \(4.877 g/t\) for this infill intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.33

Context: 137.5

#### Tags used in scoring

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: Confirmatory drilling to raise resource confidence, not new discovery.

Evidence · text

> Drill hole 30-1229, located at the southern end of the 2026 MRE model on the northern flank of Needle East Mountain, is an infill vertical hole that was drilled to test around and under historical underground workings to a level below the C Zone.

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1230

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-43)

Gaspé · copper

#### Identity

- Hole ID: 30-1230
- Project: Gaspé
- Commodity: copper
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 0.17
- Grade Unit: %
- Intercept: 62.4 m
- From: 195.6 m
- To: 258 m
- Hole Depth: 354 m
- Intercept Depth: 195.6 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1230:195.6-258
- Mining Method: open\_pit

#### Location

- Easting: 315463
- Northing: 5425655
- Elevation: 634 m
- Azimuth: 75 °
- Dip: -80 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.17
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: This intercept of 0.17% Cu over 62.4m is below the project's average grade \(0.58% Cu\) but at the 25th percentile for porphyry copper deposits \(0.17% Cu\), contributing to out-of-pit expansion.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 0.17

Context: 62.4

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

### 30-1230

[Link to this fact](https://atlas-extractions.minestarters.com/news/osisko-intersects-256-metres-averaging-0-85-cu-at-gasp-xe9--389313a3-bdfa-4296-9069-2782c5197fc9#fact-drill-facts-44)

Gaspé · silver

#### Identity

- Hole ID: 30-1230
- Project: Gaspé
- Commodity: silver
- Region: canada\_qc
- Reported Region: canada\_qc
- Ticker: OM

#### Geometry

- Grade: 1.12
- Grade Unit: g/t
- Intercept: 62.4 m
- From: 195.6 m
- To: 258 m
- Hole Depth: 354 m
- Intercept Depth: 195.6 m

#### Classification

- Deposit Type: porphyry
- Program: exploration
- Sample Type: drill
- Group ID: 30-1230:195.6-258
- Mining Method: open\_pit

#### Location

- Easting: 315463
- Northing: 5425655
- Elevation: 634 m
- Azimuth: 75 °
- Dip: -80 °
- Loc. Confidence: high
- Loc. Source: document

#### QA/QC

- Laboratory: ALS Canada Ltd.
- QA/QC Disclosed: Yes
- QP Signed: Yes
- QA/QC Methods: standards, blanks

#### Metal Equivalent

- Metal Eq. Grade: 0.17
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Compositing

- Cutoff Grade: 0.12
- Cutoff Unit: % CuEq

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-09-10T00:00:00.000Z

Reasoning: Silver grade of 1.12 g/t is below the project's average \(4.877 g/t\) for this expansion intercept.

- Positive factor: QA/QC Disclosed

- Positive factor: Metal Equivalent Opaque

- Negative factor: Apparent Width Only

Evidence · table

> 1.12

Context: 62.4

#### Tags used in scoring

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Evidence · text

> True widths are estimated at 80 – 90 % of the reported core length intervals.

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Evidence · text

> Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details \(code PREP-31DH\) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road "

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
