Resouro Strategic Metals Inc. (RSGOF) Supplementary Information on Tiros Project PEA

Original announcement by tmx on

Company
Resouro Strategic Metals Inc.
Ticker
RSM
Exchange
TSX
Region
Minas Gerais, Brazil
Primary commodity
Titanium
Secondary commodities
Rare earths
Document categories
Metallurgy, Economic study, Resource update
Extracted
2026-09-18 18:35:27 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Resouro Strategic Metals Inc. released supplementary details for its Tiros Project PEA, outlining a 20-year mine life with a 500,000 tpa production target. The project is underpinned by 99.2% Measured and Indicated resources, with an estimated initial capital cost of US$191.2 million.

Reasoning: Supplementary information for the Tiros PEA providing key economic and metallurgical parameters. The high proportion of M&I resources (99.2%) provides strong geological confidence for the production target, though the study remains at a preliminary scoping stage.

Positive factors

  • High M&I confidence (99.2%)
  • Long mine life (20 years)
  • Clear production target (500 ktpa)

Negative factors

  • PEA/Scoping stage uncertainty
  • Bench-scale metallurgical basis

Facts used in scoring: 5

Classification and evidence

PEA Onlyneutral

Only Class 4 / Initial Assessment economics available. Not bankable.

Why it applies: The document describes the announcement as a Preliminary Economic Assessment (PEA) equivalent to a Scoping Study.

Evidence · text

“The PEA remains preliminary in nature and is equivalent to a Scoping Study under the JORC Code (2012).”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The production target includes a small 0.8% component from Inferred resources.

Evidence · text

“0.8% by Inferred Mineral Resources”

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: Metallurgical recovery assumptions are based on bench-scale testwork.

Evidence · text

“based on bench-scale testwork”

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 4. Some facts used in scoring do not have a stored record.

Resource Estimates (2)

indicatedTiros · titaniumTonnes: 1400000000Grade: 12Grade Unit: %Contained Metal: 165000000Contained Unit: tView all details
Link to this fact

Identity

Project
Tiros
Commodity
titanium
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
RSM

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:dff689b930f858d353e8
Mining method
open_pit
Resource basis
gross

Resource Data

Category
indicated
Tonnes
1400000000
Grade
12
Grade Unit
%
Contained Metal
165000000
Contained Unit
t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: Confirms the scale of the Measured and Indicated resource for the Tiros project.

Positive factors

  • Large tonnage
  • High M&I percentage

Evidence · text

“1.4 billion tonne at 12% titanium dioxide”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No QP/CP Disclosurenegative

No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

indicatedTiros · rare_earthsTonnes: 1400000000Grade: 4000Grade Unit: ppmContained Metal: 5500000Contained Unit: tView all details
Link to this fact

Identity

Project
Tiros
Commodity
rare_earths
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
RSM

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:dff689b930f858d353e8
Mining method
open_pit
Resource basis
gross

Resource Data

Category
indicated
Tonnes
1400000000
Grade
4000
Grade Unit
ppm
Contained Metal
5500000
Contained Unit
t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: Confirms the scale of the REE component within the resource.

Positive factors

  • Large scale REE content

Evidence · text

“5.5 million tonne of total rare earths oxides within a Measured and Indicated Resource of 1.4 billion tonne at ... 4,000 ppm of total rare earth oxides.”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No QP/CP Disclosurenegative

No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

Metallurgical Results (2)

bench-scaleTiros · titaniumRecovery: 68.7 %View all details
Link to this fact

Identity

Project
Tiros
Commodity
titanium
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
RSM

Test Work

Program Status
preliminary
Test Type
bench-scale
Sample
bench-scale testwork

Recovery

Recovery
68.7 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: Recovery assumptions provided for TiO2 and REE.

Negative factors

  • Bench-scale testwork basis

Evidence · text

“Metallurgical recovery assumptions used in the PEA are 68.7% for TiO2”
bench-scaleTiros · rare_earthsRecovery: 67 %View all details
Link to this fact

Identity

Project
Tiros
Commodity
rare_earths
Region
brazil
Reported Region
Minas Gerais, Brazil
Ticker
RSM

Test Work

Program Status
preliminary
Test Type
bench-scale
Sample
bench-scale testwork

Recovery

Recovery
67 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-17T00:00:00.000Z

Reasoning: Recovery assumptions provided for REE.

Negative factors

  • Bench-scale testwork basis

Evidence · text

“67.0% for rare earth elements (REE), based on bench-scale testwork.”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.