# Resouro Strategic Metals Inc. \(RSGOF\) Supplementary Information on Tiros Project PEA

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe--77b4c990-72fb-4b40-8efb-9a70bdd703b8

Original source: https://money.tmx.com/en/quote/RSM/news/5117224940183694/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe

Publisher: tmx

Original announcement: 2026-06-17T03:47:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Resouro Strategic Metals Inc.

- Ticker: RSM

- Exchange: TSX

- Region: Minas Gerais, Brazil

- Primary commodity: Titanium

- Secondary commodities: Rare earths

- Document categories: Metallurgy, Economic study, Resource update

- Extracted: 2026-09-18 18:35:27 UTC

Narrative sentiment: 0.30 · Bullish

## Minestarters Atlas summary

Resouro Strategic Metals Inc. released supplementary details for its Tiros Project PEA, outlining a 20-year mine life with a 500,000 tpa production target. The project is underpinned by 99.2% Measured and Indicated resources, with an estimated initial capital cost of US$191.2 million.

Reasoning: Supplementary information for the Tiros PEA providing key economic and metallurgical parameters. The high proportion of M&amp;I resources \(99.2%\) provides strong geological confidence for the production target, though the study remains at a preliminary scoping stage.

- Positive factor: High M&amp;I confidence \(99.2%\)

- Positive factor: Long mine life \(20 years\)

- Positive factor: Clear production target \(500 ktpa\)

- Negative factor: PEA/Scoping stage uncertainty

- Negative factor: Bench-scale metallurgical basis

Facts used in scoring: 5

## Classification and evidence

**PEA Only**

Polarity: neutral

Definition: Only Class 4 / Initial Assessment economics available. Not bankable.

Why it applies: The document describes the announcement as a Preliminary Economic Assessment \(PEA\) equivalent to a Scoping Study.

Evidence · text

> The PEA remains preliminary in nature and is equivalent to a Scoping Study under the JORC Code \(2012\).

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The production target includes a small 0.8% component from Inferred resources.

Evidence · text

> 0.8% by Inferred Mineral Resources

**Bench Scale Only**

Polarity: negative

Definition: Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: Metallurgical recovery assumptions are based on bench-scale testwork.

Evidence · text

> based on bench-scale testwork

**Single Domain Only**

Polarity: negative

Definition: Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

## Extracted facts

Stored fact records: 4. Some facts used in scoring do not have a stored record.

## Resource Estimates (2)

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe--77b4c990-72fb-4b40-8efb-9a70bdd703b8#fact-resource-facts-3)

Tiros · titanium

#### Identity

- Project: Tiros
- Commodity: titanium
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RSM

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:dff689b930f858d353e8
- Mining method: open\_pit
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 1400000000
- Grade: 12
- Grade Unit: %
- Contained Metal: 165000000
- Contained Unit: t

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-17T00:00:00.000Z

Reasoning: Confirms the scale of the Measured and Indicated resource for the Tiros project.

- Positive factor: Large tonnage

- Positive factor: High M&amp;I percentage

Evidence · text

> 1.4 billion tonne at 12% titanium dioxide

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe--77b4c990-72fb-4b40-8efb-9a70bdd703b8#fact-resource-facts-4)

Tiros · rare\_earths

#### Identity

- Project: Tiros
- Commodity: rare\_earths
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RSM

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:dff689b930f858d353e8
- Mining method: open\_pit
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 1400000000
- Grade: 4000
- Grade Unit: ppm
- Contained Metal: 5500000
- Contained Unit: t

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-17T00:00:00.000Z

Reasoning: Confirms the scale of the REE component within the resource.

- Positive factor: Large scale REE content

Evidence · text

> 5.5 million tonne of total rare earths oxides within a Measured and Indicated Resource of 1.4 billion tonne at ... 4,000 ppm of total rare earth oxides.

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

## Metallurgical Results (2)

### bench-scale

[Link to this fact](https://atlas-extractions.minestarters.com/news/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe--77b4c990-72fb-4b40-8efb-9a70bdd703b8#fact-metallurgical-facts-1)

Tiros · titanium

#### Identity

- Project: Tiros
- Commodity: titanium
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RSM

#### Test Work

- Program Status: preliminary
- Test Type: bench-scale
- Sample: bench-scale testwork

#### Recovery

- Recovery: 68.7 %
- Recovery Basis: actual\_test

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-17T00:00:00.000Z

Reasoning: Recovery assumptions provided for TiO2 and REE.

- Negative factor: Bench-scale testwork basis

Evidence · text

> Metallurgical recovery assumptions used in the PEA are 68.7% for TiO2

### bench-scale

[Link to this fact](https://atlas-extractions.minestarters.com/news/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe--77b4c990-72fb-4b40-8efb-9a70bdd703b8#fact-metallurgical-facts-2)

Tiros · rare\_earths

#### Identity

- Project: Tiros
- Commodity: rare\_earths
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RSM

#### Test Work

- Program Status: preliminary
- Test Type: bench-scale
- Sample: bench-scale testwork

#### Recovery

- Recovery: 67 %
- Recovery Basis: actual\_test

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-17T00:00:00.000Z

Reasoning: Recovery assumptions provided for REE.

- Negative factor: Bench-scale testwork basis

Evidence · text

> 67.0% for rare earth elements \(REE\), based on bench-scale testwork.

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
