Rocky Shore Strengthens Newfoundland Presence in a Proven VMS Belt

Original announcement by orestocks on

Company
Rocky Shore Gold Ltd.
Ticker
RSG.CN
Exchange
Unavailable
Region
Newfoundland and Labrador, Canada
Primary commodity
Gold
Secondary commodities
Silver, Zinc, Lead, Copper
Document categories
Drill results, Agreement transaction
Extracted
2026-09-16 12:33:20 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Rocky Shore Gold has acquired the Handcamp and Springdale properties and staked additional claims in Newfoundland, forming the new Rocky Pond VMS Project. This project is located in a proven VMS belt and includes historical 2022 drill results from the Handcamp Zone with high-grade gold-equivalent intercepts. The company aims to enhance its discovery profile in the region, complementing its existing Gold Anchor Project.

Reasoning: Rocky Shore Gold has acquired new properties in a proven VMS belt in Newfoundland, with historical 2022 drill results showing high-grade gold-equivalent intercepts. The acquisition and the project's potential are positive, but the results are historical, true width is unknown, and the company has not verified the data, leading to a moderate confidence score.

Positive factors

  • Acquisition of new properties in a proven VMS belt
  • High-grade gold-equivalent drill intercepts
  • Project located on trend with a former high-grade mine
  • Potential for significant discovery and enhancement of company's profile
  • Metal equivalent assumptions are disclosed

Negative factors

  • Drill results are historical (2022) and re-released in 2026
  • True width of intercepts is not known
  • Cut-off grade for compositing is not disclosed
  • Company has not verified the accuracy of historical values in Table 1
  • Surface sample results are explicitly stated not to be relied upon for true grade

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 59

Classification and evidence

Apparent Width Onlynegative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: A Qualified Person (QP) is named and has approved the scientific and technical information.

Evidence · text

“Ken Lapierre, P.Geo., President and CEO of the Company, is a Qualified Person in accordance with the Canadian regulatory requirements as set out in National Instrument 43-101 and has reviewed the historical documentation for all properties and has approved the scientific and technical information that forms the basis for the disclosure contained in this news release.”

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: The document reports high-grade intervals but does not state the cut-off grade used for compositing.

Evidence · text

“See table below for complete historical drill results. Lengths represent down-the-hole drill thicknesses.”

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: The project's value premise is partly based on its proximity and trend within the Roberts Arm VMS belt, host to the former high-grade Buchans VMS mine.

Evidence · text

“On trend to the Buchans VMS mine: Project hosts a 40-kilometre-long trend of the prolific Roberts Arm VMS Belt northeast of the high-grade former producing Buchans VMS mine.”

Extracted facts

Stored fact records: 59. Some facts used in scoring do not have a stored record.

Drill Results (59)

H22-01Rocky Pond VMS · goldGrade: 2.57Grade Unit: g/tIntercept: 11.85 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
2.57
Grade Unit
g/t
Intercept
11.85 m
From
12.1 m
To
23.95 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-23.95
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
2.89
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a strong gold-equivalent grade over a moderate width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Strong gold grade for VMS deposit type
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“2.57”

Context: 11.85

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · silverGrade: 19.35Grade Unit: g/tIntercept: 11.85 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
19.35
Grade Unit
g/t
Intercept
11.85 m
From
12.1 m
To
23.95 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-23.95
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a moderate silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“19.35”

Context: 11.85

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · zincGrade: 0.49Grade Unit: %Intercept: 11.85 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.49
Grade Unit
%
Intercept
11.85 m
From
12.1 m
To
23.95 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-23.95
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.49”

Context: 11.85

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · copperGrade: 0.04Grade Unit: %Intercept: 11.85 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.04
Grade Unit
%
Intercept
11.85 m
From
12.1 m
To
23.95 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-23.95
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.04”

Context: 11.85

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · leadGrade: 0.28Grade Unit: %Intercept: 11.85 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.28
Grade Unit
%
Intercept
11.85 m
From
12.1 m
To
23.95 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-23.95
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak lead grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.28”

Context: 11.85

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · goldGrade: 3.94Grade Unit: g/tIntercept: 7.3 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
3.94
Grade Unit
g/t
Intercept
7.3 m
From
12.1 m
To
19.4 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-19.4
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
4.41
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a strong gold-equivalent grade over a moderate width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Strong gold grade for VMS deposit type
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“3.94”

Context: 7.30

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · silverGrade: 29.01Grade Unit: g/tIntercept: 7.3 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
29.01
Grade Unit
g/t
Intercept
7.3 m
From
12.1 m
To
19.4 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-19.4
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a moderate silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“29.01”

Context: 7.30

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · zincGrade: 0.7Grade Unit: %Intercept: 7.3 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.7
Grade Unit
%
Intercept
7.3 m
From
12.1 m
To
19.4 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-19.4
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.70”

Context: 7.30

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · copperGrade: 0.06Grade Unit: %Intercept: 7.3 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.06
Grade Unit
%
Intercept
7.3 m
From
12.1 m
To
19.4 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-19.4
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.06”

Context: 7.30

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-01Rocky Pond VMS · leadGrade: 0.42Grade Unit: %Intercept: 7.3 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-01
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.42
Grade Unit
%
Intercept
7.3 m
From
12.1 m
To
19.4 m
Hole Depth
44.7 m
Intercept Depth
12.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-01:12.1-19.4
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-42 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak lead grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.42”

Context: 7.30

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · goldGrade: 1.05Grade Unit: g/tIntercept: 26.25 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
1.05
Grade Unit
g/t
Intercept
26.25 m
From
19.25 m
To
45.5 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-45.5
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
1.17
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a moderate gold-equivalent grade over a good width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Moderate gold grade over a good width
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“1.05”

Context: 26.25

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · silverGrade: 7.57Grade Unit: g/tIntercept: 26.25 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
7.57
Grade Unit
g/t
Intercept
26.25 m
From
19.25 m
To
45.5 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-45.5
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“7.57”

Context: 26.25

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · zincGrade: 0.21Grade Unit: %Intercept: 26.25 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.21
Grade Unit
%
Intercept
26.25 m
From
19.25 m
To
45.5 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-45.5
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low zinc grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.21”

Context: 26.25

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · copperGrade: 0.02Grade Unit: %Intercept: 26.25 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.02
Grade Unit
%
Intercept
26.25 m
From
19.25 m
To
45.5 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-45.5
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.02”

Context: 26.25

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · leadGrade: 0.07Grade Unit: %Intercept: 26.25 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.07
Grade Unit
%
Intercept
26.25 m
From
19.25 m
To
45.5 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-45.5
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low lead grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.07”

Context: 26.25

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · goldGrade: 1.92Grade Unit: g/tIntercept: 11.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
1.92
Grade Unit
g/t
Intercept
11.05 m
From
19.25 m
To
30.3 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-30.3
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
2.08
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a strong gold-equivalent grade over a moderate width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Strong gold grade for VMS deposit type
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“1.92”

Context: 11.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · silverGrade: 11.32Grade Unit: g/tIntercept: 11.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
11.32
Grade Unit
g/t
Intercept
11.05 m
From
19.25 m
To
30.3 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-30.3
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“11.32”

Context: 11.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · zincGrade: 0.31Grade Unit: %Intercept: 11.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.31
Grade Unit
%
Intercept
11.05 m
From
19.25 m
To
30.3 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-30.3
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.31”

Context: 11.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · copperGrade: 0.02Grade Unit: %Intercept: 11.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.02
Grade Unit
%
Intercept
11.05 m
From
19.25 m
To
30.3 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-30.3
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.02”

Context: 11.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-02Rocky Pond VMS · leadGrade: 0.09Grade Unit: %Intercept: 11.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-02
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.09
Grade Unit
%
Intercept
11.05 m
From
19.25 m
To
30.3 m
Hole Depth
95 m
Intercept Depth
19.25 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-02:19.25-30.3
Mining Method
unknown

Location

Easting
567585
Northing
5459297
Elevation
221 m
Azimuth
110 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low lead grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.09”

Context: 11.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · goldGrade: 2Grade Unit: g/tIntercept: 21.95 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
2
Grade Unit
g/t
Intercept
21.95 m
From
10.2 m
To
32.15 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-32.15
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
2.2
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a strong gold-equivalent grade over a moderate width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Strong gold grade for VMS deposit type
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“2.00”

Context: 21.95

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · silverGrade: 12.42Grade Unit: g/tIntercept: 21.95 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
12.42
Grade Unit
g/t
Intercept
21.95 m
From
10.2 m
To
32.15 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-32.15
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“12.42”

Context: 21.95

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · zincGrade: 0.36Grade Unit: %Intercept: 21.95 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.36
Grade Unit
%
Intercept
21.95 m
From
10.2 m
To
32.15 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-32.15
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.36”

Context: 21.95

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · copperGrade: 0.02Grade Unit: %Intercept: 21.95 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.02
Grade Unit
%
Intercept
21.95 m
From
10.2 m
To
32.15 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-32.15
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.02”

Context: 21.95

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · leadGrade: 0.2Grade Unit: %Intercept: 21.95 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.2
Grade Unit
%
Intercept
21.95 m
From
10.2 m
To
32.15 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-32.15
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak lead grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.20”

Context: 21.95

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · goldGrade: 3.64Grade Unit: g/tIntercept: 11.35 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
3.64
Grade Unit
g/t
Intercept
11.35 m
From
10.2 m
To
21.55 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-21.55
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
3.98
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a strong gold-equivalent grade over a moderate width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Strong gold grade for VMS deposit type
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“3.64”

Context: 11.35

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · silverGrade: 21.42Grade Unit: g/tIntercept: 11.35 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
21.42
Grade Unit
g/t
Intercept
11.35 m
From
10.2 m
To
21.55 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-21.55
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a moderate silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“21.42”

Context: 11.35

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · zincGrade: 0.65Grade Unit: %Intercept: 11.35 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.65
Grade Unit
%
Intercept
11.35 m
From
10.2 m
To
21.55 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-21.55
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.65”

Context: 11.35

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · copperGrade: 0.04Grade Unit: %Intercept: 11.35 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.04
Grade Unit
%
Intercept
11.35 m
From
10.2 m
To
21.55 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-21.55
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.04”

Context: 11.35

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-03Rocky Pond VMS · leadGrade: 0.36Grade Unit: %Intercept: 11.35 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-03
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.36
Grade Unit
%
Intercept
11.35 m
From
10.2 m
To
21.55 m
Hole Depth
53 m
Intercept Depth
10.2 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-03:10.2-21.55
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-45 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak lead grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.36”

Context: 11.35

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · goldGrade: 1.7Grade Unit: g/tIntercept: 25.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
1.7
Grade Unit
g/t
Intercept
25.05 m
From
13.05 m
To
38.1 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-38.1
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
1.96
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a strong gold-equivalent grade over a moderate width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Strong gold grade for VMS deposit type
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“1.70”

Context: 25.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · silverGrade: 13.53Grade Unit: g/tIntercept: 25.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
13.53
Grade Unit
g/t
Intercept
25.05 m
From
13.05 m
To
38.1 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-38.1
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“13.53”

Context: 25.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · zincGrade: 0.34Grade Unit: %Intercept: 25.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.34
Grade Unit
%
Intercept
25.05 m
From
13.05 m
To
38.1 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-38.1
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.34”

Context: 25.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · copperGrade: 0.06Grade Unit: %Intercept: 25.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.06
Grade Unit
%
Intercept
25.05 m
From
13.05 m
To
38.1 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-38.1
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.06”

Context: 25.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · leadGrade: 0.29Grade Unit: %Intercept: 25.05 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.29
Grade Unit
%
Intercept
25.05 m
From
13.05 m
To
38.1 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-38.1
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak lead grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.29”

Context: 25.05

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · goldGrade: 3.06Grade Unit: g/tIntercept: 11.6 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
3.06
Grade Unit
g/t
Intercept
11.6 m
From
13.05 m
To
24.65 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-24.65
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
3.5
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a strong gold-equivalent grade over a moderate width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Strong gold grade for VMS deposit type
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“3.06”

Context: 11.60

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · silverGrade: 22.86Grade Unit: g/tIntercept: 11.6 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
22.86
Grade Unit
g/t
Intercept
11.6 m
From
13.05 m
To
24.65 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-24.65
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a moderate silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“22.86”

Context: 11.60

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · zincGrade: 0.5Grade Unit: %Intercept: 11.6 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.5
Grade Unit
%
Intercept
11.6 m
From
13.05 m
To
24.65 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-24.65
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.50”

Context: 11.60

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · copperGrade: 0.12Grade Unit: %Intercept: 11.6 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.12
Grade Unit
%
Intercept
11.6 m
From
13.05 m
To
24.65 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-24.65
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak copper grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.12”

Context: 11.60

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-04Rocky Pond VMS · leadGrade: 0.51Grade Unit: %Intercept: 11.6 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-04
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.51
Grade Unit
%
Intercept
11.6 m
From
13.05 m
To
24.65 m
Hole Depth
74 m
Intercept Depth
13.05 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-04:13.05-24.65
Mining Method
unknown

Location

Easting
567582.9
Northing
5459306.4
Elevation
219.7 m
Azimuth
102.7 °
Dip
-68 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak lead grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.51”

Context: 11.60

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-05Rocky Pond VMS · goldGrade: 1.89Grade Unit: g/tIntercept: 3.65 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-05
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
1.89
Grade Unit
g/t
Intercept
3.65 m
From
17.9 m
To
21.55 m
Hole Depth
29 m
Intercept Depth
17.9 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-05:17.9-21.55
Mining Method
unknown

Location

Easting
567589.6
Northing
5459326
Elevation
221.6 m
Azimuth
100.6 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
2.26
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a strong gold-equivalent grade, but its narrow width, age, lack of true width, and the company's disclaimer regarding verification reduce its materiality, novelty, and confidence.

Positive factors

  • Strong gold grade for VMS deposit type
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed
  • Narrow intercept length

Evidence · table

“1.89”

Context: 3.65

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-05Rocky Pond VMS · silverGrade: 16.88Grade Unit: g/tIntercept: 3.65 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-05
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
16.88
Grade Unit
g/t
Intercept
3.65 m
From
17.9 m
To
21.55 m
Hole Depth
29 m
Intercept Depth
17.9 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-05:17.9-21.55
Mining Method
unknown

Location

Easting
567589.6
Northing
5459326
Elevation
221.6 m
Azimuth
100.6 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a moderate silver grade, but its narrow width, age, lack of true width, and the company's disclaimer regarding verification reduce its materiality, novelty, and confidence.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed
  • Narrow intercept length

Evidence · table

“16.88”

Context: 3.65

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-05Rocky Pond VMS · zincGrade: 0.66Grade Unit: %Intercept: 3.65 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-05
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.66
Grade Unit
%
Intercept
3.65 m
From
17.9 m
To
21.55 m
Hole Depth
29 m
Intercept Depth
17.9 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-05:17.9-21.55
Mining Method
unknown

Location

Easting
567589.6
Northing
5459326
Elevation
221.6 m
Azimuth
100.6 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, but its narrow width, age, lack of true width, and the company's disclaimer regarding verification reduce its materiality, novelty, and confidence.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed
  • Narrow intercept length

Evidence · table

“0.66”

Context: 3.65

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-05Rocky Pond VMS · copperGrade: 0.05Grade Unit: %Intercept: 3.65 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-05
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.05
Grade Unit
%
Intercept
3.65 m
From
17.9 m
To
21.55 m
Hole Depth
29 m
Intercept Depth
17.9 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-05:17.9-21.55
Mining Method
unknown

Location

Easting
567589.6
Northing
5459326
Elevation
221.6 m
Azimuth
100.6 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, but its narrow width, age, lack of true width, and the company's disclaimer regarding verification reduce its materiality, novelty, and confidence.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed
  • Narrow intercept length

Evidence · table

“0.05”

Context: 3.65

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-05Rocky Pond VMS · leadGrade: 0.36Grade Unit: %Intercept: 3.65 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-05
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.36
Grade Unit
%
Intercept
3.65 m
From
17.9 m
To
21.55 m
Hole Depth
29 m
Intercept Depth
17.9 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-05:17.9-21.55
Mining Method
unknown

Location

Easting
567589.6
Northing
5459326
Elevation
221.6 m
Azimuth
100.6 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak lead grade, but its narrow width, age, lack of true width, and the company's disclaimer regarding verification reduce its materiality, novelty, and confidence.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed
  • Narrow intercept length

Evidence · table

“0.36”

Context: 3.65

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · goldGrade: 1.13Grade Unit: g/tIntercept: 17.5 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
1.13
Grade Unit
g/t
Intercept
17.5 m
From
20.1 m
To
37.6 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-37.6
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
1.29
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a moderate gold-equivalent grade over a good width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Moderate gold grade over a good width
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“1.13”

Context: 17.50

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · silverGrade: 8.35Grade Unit: g/tIntercept: 17.5 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
8.35
Grade Unit
g/t
Intercept
17.5 m
From
20.1 m
To
37.6 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-37.6
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“8.35”

Context: 17.50

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · zincGrade: 0.28Grade Unit: %Intercept: 17.5 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.28
Grade Unit
%
Intercept
17.5 m
From
20.1 m
To
37.6 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-37.6
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.28”

Context: 17.50

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · copperGrade: 0.02Grade Unit: %Intercept: 17.5 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.02
Grade Unit
%
Intercept
17.5 m
From
20.1 m
To
37.6 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-37.6
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.02”

Context: 17.50

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · leadGrade: 0.11Grade Unit: %Intercept: 17.5 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.11
Grade Unit
%
Intercept
17.5 m
From
20.1 m
To
37.6 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-37.6
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low lead grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.11”

Context: 17.50

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · goldGrade: 1.53Grade Unit: g/tIntercept: 11 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
1.53
Grade Unit
g/t
Intercept
11 m
From
20.1 m
To
31.1 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-31.1
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
1.7
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a moderate gold-equivalent grade over a good width, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Moderate gold grade over a good width
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“1.53”

Context: 11.00

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · silverGrade: 10.64Grade Unit: g/tIntercept: 11 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
10.64
Grade Unit
g/t
Intercept
11 m
From
20.1 m
To
31.1 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-31.1
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak silver grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“10.64”

Context: 11.00

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · zincGrade: 0.3Grade Unit: %Intercept: 11 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.3
Grade Unit
%
Intercept
11 m
From
20.1 m
To
31.1 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-31.1
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak zinc grade, contributing to the overall polymetallic nature, but its novelty and confidence are reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.30”

Context: 11.00

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · copperGrade: 0.02Grade Unit: %Intercept: 11 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.02
Grade Unit
%
Intercept
11 m
From
20.1 m
To
31.1 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-31.1
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.02”

Context: 11.00

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-06Rocky Pond VMS · leadGrade: 0.1Grade Unit: %Intercept: 11 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-06
Project
Rocky Pond VMS
Commodity
lead
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.1
Grade Unit
%
Intercept
11 m
From
20.1 m
To
31.1 m
Hole Depth
62 m
Intercept Depth
20.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-06:20.1-31.1
Mining Method
unknown

Location

Easting
567571.3
Northing
5459287
Elevation
221.2 m
Azimuth
100 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low lead grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Lead grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.10”

Context: 11.00

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-07Rocky Pond VMS · goldGrade: 0.22Grade Unit: g/tIntercept: 8.4 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-07
Project
Rocky Pond VMS
Commodity
gold
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.22
Grade Unit
g/t
Intercept
8.4 m
From
27.1 m
To
35.5 m
Hole Depth
96.82 m
Intercept Depth
27.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-07:27.1-35.5
Mining Method
unknown

Location

Easting
567468.3
Northing
5459023.7
Elevation
235.2 m
Azimuth
110.9 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Metal Eq. Grade
0.37
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a weak gold-equivalent grade, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Metal equivalent assumptions disclosed

Negative factors

  • Weak gold grade for VMS deposit type
  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.22”

Context: 8.40

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-07Rocky Pond VMS · silverGrade: 4Grade Unit: g/tIntercept: 8.4 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-07
Project
Rocky Pond VMS
Commodity
silver
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
4
Grade Unit
g/t
Intercept
8.4 m
From
27.1 m
To
35.5 m
Hole Depth
96.82 m
Intercept Depth
27.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-07:27.1-35.5
Mining Method
unknown

Location

Easting
567468.3
Northing
5459023.7
Elevation
235.2 m
Azimuth
110.9 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low silver grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Silver grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“4.00”

Context: 8.40

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-07Rocky Pond VMS · zincGrade: 0.16Grade Unit: %Intercept: 8.4 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-07
Project
Rocky Pond VMS
Commodity
zinc
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.16
Grade Unit
%
Intercept
8.4 m
From
27.1 m
To
35.5 m
Hole Depth
96.82 m
Intercept Depth
27.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-07:27.1-35.5
Mining Method
unknown

Location

Easting
567468.3
Northing
5459023.7
Elevation
235.2 m
Azimuth
110.9 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low zinc grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Zinc grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.16”

Context: 8.40

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”
H22-07Rocky Pond VMS · copperGrade: 0.07Grade Unit: %Intercept: 8.4 mHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Hole ID
H22-07
Project
Rocky Pond VMS
Commodity
copper
Region
canada_nl
Reported Region
canada_nl
Ticker
RSG.CN

Geometry

Grade
0.07
Grade Unit
%
Intercept
8.4 m
From
27.1 m
To
35.5 m
Hole Depth
96.82 m
Intercept Depth
27.1 m

Classification

Deposit Type
vms
Program
exploration
Sample Type
drill
Group ID
H22-07:27.1-35.5
Mining Method
unknown

Location

Easting
567468.3
Northing
5459023.7
Elevation
235.2 m
Azimuth
110.9 °
Dip
-50 °
Loc. Confidence
high
Loc. Source
document

QA/QC

QP Signed
Yes

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
Yes
Review Reason
historical_restatement
Interp. Status
scored
Historical
Yes
Historical Source Date
2022-01-01T00:00:00.000Z

Dates

Event date
2026-09-16T00:00:00.000Z

Reasoning: This historical drill intercept shows a very low copper grade, contributing minimally to the overall polymetallic nature, with novelty and confidence reduced due to its age, lack of true width, and the company's disclaimer regarding verification.

Positive factors

  • Copper grade contributes to polymetallic mineralization
  • Metal equivalent assumptions disclosed

Negative factors

  • Historical data (2022) re-released in 2026
  • True width not known
  • Company has not verified accuracy of values
  • Cut-off grade for compositing not disclosed

Evidence · table

“0.07”

Context: 8.40

Tags used in scoring

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The drill results presented are from '2022 drilling' but the announcement is in 2026.

Evidence · text

“Table 1: Handcamp Zone Drill Assay Highlights for 2022 drilling.”

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Rejected tags

Rejected tags — excluded from scoring because their label or evidence could not be verified.

Apparent Width OnlyRejected · negative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Reason: The document explicitly states that lengths represent down-the-hole drill thicknesses and true thickness is not known.

Evidence · text

“Lengths represent down-the-hole drill thicknesses. ... as true thickness is not known currently.”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.