Scoping Study for the Mina do Barroso Lithium Project Delivers NPV of US$356m

Original announcement by research on

Company
Savannah Resources plc
Ticker
SAV
Exchange
LSE
Region
northern Portugal
Primary commodity
Lithium
Secondary commodities
Iron ore, Feldspar, Quartz
Document categories
Other, Resource update
Extracted
2026-11-03 10:14:33 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Savannah Resources reported a scoping study for the Mina do Barroso lithium project in northern Portugal, outlining an open-pit mine and concentrator with DMS and flotation. The study estimates a pre-tax NPV8 of US$356m, IRR of 63.2%, and initial capex of US$136.0m, based on a 14.42Mt mining inventory. It is a preliminary economic assessment, so the numbers are indicative and still need feasibility-stage work and approvals.

Reasoning: A scoping study with robust headline economics and a defined lithium development plan is materially positive, but it remains preliminary and subject to feasibility-level refinement.

Positive factors

  • Scoping study reports pre-tax NPV8 of US$356m and IRR of 63.2%
  • Open pit mining and conventional DMS + flotation processing are described
  • Project economics include a 14.42Mt mining inventory at 1.07% Li2O and average annual production of ~175,000tpa spodumene concentrate
  • Competent Persons are named for exploration, resources and the scoping mining assessment

Negative factors

  • Scoping-level study, so estimates remain preliminary
  • The study assumes 80% Li2O recovery and notes potential for metallurgical optimisation rather than completed improvement
  • Project still needs feasibility study, environmental approvals and fast-track execution

Rubric flags

  • resource rows in a scoping study are restated historical inputs, not a new resource update — Keep resource facts flagged historical and treat the document primarily as an economic_study.

Facts used in scoring: 16

Classification and evidence

PFS Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: The study is a scoping study intended to fast-track the project toward feasibility, with NPV, IRR, capex and payback metrics reported.

Evidence · text

“Scoping Study for the Mina do Barroso Lithium Project Delivers NPV of US$356m”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The resource and competent person disclosures explicitly reference the 2012 JORC Code and Competent Person sign-off.

Evidence · text

“qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves””

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Named Competent Persons are provided for the exploration results, Mineral Resources, and scoping mining assessment.

Evidence · text

“The information in this announcement that relates to exploration results is based upon information compiled by Mr Dale Ferguson”

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The mineral resource is explicitly reported using a 0.5% Li2O cut-off grade.

Evidence · text

“using a 0.5% Li₂O cut-off grade”

No QP/CP Disclosurenegative

No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: The scoping study economics themselves do not name a single qualified person responsible for the economic model, though CPs are named elsewhere in the document.

Evidence · text

“The scoping level mining assessment of the Mino Do Barroso Deposit has been completed by Mr Nigel Spicer”

Extracted facts

Stored fact records: 16. Some facts used in scoring do not have a stored record.

Resource Estimates (16)

indicatedMina do Barroso Lithium Project · lithiumTonnes: 7160000Grade: 1.06Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:29c8559072d6affb3f20
Deposit or zone
Grandao

Resource Data

Category
indicated
Tonnes
7160000
Grade
1.06
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is a directly stated Indicated lithium resource row used in the study basis, but it is a restatement of the April 2018 resource estimate.

Positive factors

  • Indicated resource row is explicitly reported in the scoping study table
  • Cut-off grade is disclosed at 0.5% Li2O
  • JORC Competent Person sign-off is named

Negative factors

  • This is a historical resource row restated inside a scoping study rather than a new estimate
  • No contained metal column is separately stated for this row

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 2600000Grade: 1.13Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:e9bd28847476c670d52a
Deposit or zone
Grandao

Resource Data

Category
inferred
Tonnes
2600000
Grade
1.13
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is a historical Inferred lithium resource row supporting the study input, not a new estimate.

Positive factors

  • Inferred resource tonnage and grade are explicitly stated for Grandao
  • Cut-off grade is disclosed at 0.5% Li2O
  • The estimate is signed off by a named Competent Person

Negative factors

  • Historical resource row repeated in the study context
  • Inferred category carries lower confidence than indicated material

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 2610000Grade: 1.01Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:4fabfb4b6c9d47090591
Deposit or zone
Reservatorio

Resource Data

Category
inferred
Tonnes
2610000
Grade
1.01
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is a historical Inferred lithium resource row included in the study's feed inventory.

Positive factors

  • Reservatorio inferred resource is explicitly tabled in the study
  • Cut-off grade is stated
  • The project is described as open-pit mining

Negative factors

  • Historical resource row restated in an economic study
  • Inferred category lowers confidence

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 1600000Grade: 1.09Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:9ab066efc42135efed88
Deposit or zone
Reservatorio

Resource Data

Category
inferred
Tonnes
1600000
Grade
1.09
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the conceptual Reservatorio exploration-target component used in the scoping study, with a stated grade.

Positive factors

  • The table explicitly reports exploration-target material for Reservatorio
  • Grade range is in the 1.0% to 1.2% Li2O band used in the study

Negative factors

  • This is part of the conceptual exploration target, not a resource estimate
  • Exploration target tonnage is conceptual and not a mineral resource

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 270000Grade: 1.21Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:cbb62afb3d6eff17c513
Deposit or zone
NOA

Resource Data

Category
inferred
Tonnes
270000
Grade
1.21
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is a historical NOA inferred resource row included in the study's feed inventory.

Positive factors

  • NOA feed inventory is explicitly stated in the table
  • The project basis is a defined open-pit scoping study

Negative factors

  • Inferred category only
  • Historical resource row rather than a new estimate

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 180000Grade: 1.1Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:f3e99563a51d208e6340
Deposit or zone
Grandao

Resource Data

Category
inferred
Tonnes
180000
Grade
1.1
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the conceptual Grandao exploration-target component, not a new resource estimate.

Positive factors

  • Grandao exploration-target material is explicitly tabled
  • Grade is within the conceptual target band

Negative factors

  • Exploration target material is conceptual and not yet a mineral resource
  • Historical basis within a scoping study

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 5480000Grade: 1.07Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:e79b580f764ad92a17fe
Deposit or zone
Grandao

Resource Data

Category
inferred
Tonnes
5480000
Grade
1.07
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the Grandao inferred resource input used in the combined mining inventory.

Positive factors

  • Grandao inferred material is explicitly stated as part of the plant feed inventory
  • Cut-off grade is disclosed
  • This supports the scoping study mine plan

Negative factors

  • Historical resource input rather than fresh drilling results
  • Inferred material carries lower confidence

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 1780000Grade: 1.09Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:be08437773c21f351c88
Deposit or zone
Reservatorio

Resource Data

Category
inferred
Tonnes
1780000
Grade
1.09
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the conceptual Reservatorio exploration-target material included in the study basis.

Positive factors

  • Reservatorio exploration-target component is explicitly shown in the table
  • Grade is within the study's target range

Negative factors

  • Conceptual exploration target material, not a resource estimate
  • Historical context

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 14000000Grade: 1.1Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:74c414cdc45930588788
Deposit or zone
Total Current Project Target

Resource Data

Category
inferred
Tonnes
14000000
Grade
1.1
Grade Unit
% Li2O
Cutoff Grade
0.5
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the total inferred resource basis for the scoping study, but it is restated from the April 2018 resource estimate.

Positive factors

  • The combined inferred mineral resource total is explicitly reported
  • Cut-off grade is disclosed
  • Used directly in the scoping study mine plan

Negative factors

  • Historical resource aggregation rather than a new estimate
  • Inferred-only category mix

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 8000000Grade: 1Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:3dce2b7cd09624894d6f
Deposit or zone
Total Current Project Target

Resource Data

Category
inferred
Tonnes
8000000
Grade
1
Grade Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the lower bound of the conceptual project target, not a new resource row.

Positive factors

  • The conceptual exploration target lower bound is explicitly stated

Negative factors

  • Exploration target is conceptual and not a mineral resource
  • No cut-off grade is stated for the exploration target

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 12000000Grade: 1.2Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:98b53191497166719df0
Deposit or zone
Total Current Project Target

Resource Data

Category
inferred
Tonnes
12000000
Grade
1.2
Grade Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the upper bound of the conceptual project target, included for completeness.

Positive factors

  • The conceptual project target upper grade bound is explicitly stated

Negative factors

  • Exploration target is conceptual and not a mineral resource
  • No cut-off grade is stated for the exploration target

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

indicatedMina do Barroso Lithium Project · lithiumTonnes: 500Grade: 1.1Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:af28d8714c70ee15f4a9
Deposit or zone
Grandao

Resource Data

Category
indicated
Tonnes
500
Grade
1.1
Grade Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the indicated-component split implied by the table's 50% indicated allocation.

Positive factors

  • A 50% indicated split is explicitly given in the summary table

Negative factors

  • This figure is derived from the percentage split in the scoping study table and is not a standalone estimate row
  • Very small tonnage relative to the main resource

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut Off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 380Grade: 1.1Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:d1096b7a629677387a73
Deposit or zone
Grandao

Resource Data

Category
inferred
Tonnes
380
Grade
1.1
Grade Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the inferred-component split implied by the table's 38% inferred allocation.

Positive factors

  • The resource split by percentage is explicitly stated in the study summary

Negative factors

  • Derived from the percentage split rather than a separate estimate row
  • Very small tonnage

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 120Grade: 1.1Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:23d7c225b6755f17e1fb
Deposit or zone
Grandao

Resource Data

Category
inferred
Tonnes
120
Grade
1.1
Grade Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the exploration-target component implied by the 12% allocation.

Positive factors

  • The exploration-target percentage is explicitly stated

Negative factors

  • This is a derived split from the conceptual target percentage, not a standalone estimate
  • Conceptual target material only

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 800Grade: 1.1Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:3da0fbe13f529b85142d
Deposit or zone
Reservatorio

Resource Data

Category
inferred
Tonnes
800
Grade
1.1
Grade Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the conceptual exploration-target component implied for Reservatorio.

Positive factors

  • The resource split table gives the project-level percentage allocation

Negative factors

  • Derived split from percentage, not an independently stated row
  • Very small tonnage

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

inferredMina do Barroso Lithium Project · lithiumTonnes: 1280Grade: 1.1Grade Unit: % Li2OHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Mina do Barroso Lithium Project
Commodity
lithium
Region
northern portugal
Reported Region
northern Portugal
Ticker
SAV

Resource scope

Estimate type
resource
Effective date
2018-04-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Paul Payne
Resource group id
resource:4766f6ee31f1d51860be
Deposit or zone
Reservatorio

Resource Data

Category
inferred
Tonnes
1280
Grade
1.1
Grade Unit
% Li2O

Prior Estimate

Resource Date
2018-04-01

Lab

Laboratory
Nagrom

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2018-04-01T00:00:00.000Z

Reasoning: This is the upper conceptual target split implied for Reservatorio.

Positive factors

  • The target range is explicitly stated in the table

Negative factors

  • Derived from the conceptual target range, not a standalone estimate
  • Conceptual target material only

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut Off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 8.6 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.