Silver Tiger Announces a PEA for the Underground with an After Tax NPV of US$304m and an Updated PFS for the Stockwork Zone with an After Tax NPV of US$456m at the El Tigre Silver-Gold Project, Sonora, Mexico

Original announcement by tmx on

Company
Silver Tiger Metals Inc.
Ticker
SLVR
Exchange
TSX
Region
Sonora, Mexico
Primary commodity
Silver
Secondary commodities
Gold, Copper, Lead, Zinc
Document categories
Resource update, Economic study, Metallurgy
Extracted
2026-09-16 22:58:08 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Silver Tiger Metals announced a Preliminary Economic Assessment (PEA) for the underground portion of its El Tigre Silver-Gold Project, showing an after-tax NPV of US$304 million and an IRR of 42.8%. Concurrently, an updated Pre-Feasibility Study (PFS) for the Stockwork Zone reported an after-tax NPV of US$456 million and an IRR of 65.7%. Both studies are based on consensus metal prices and indicate robust economics with fast payback periods. The company also released an updated Mineral Resource Estimate, highlighting significant increases in contained metal and grade for certain categories.

Reasoning: The announcement presents highly positive economic results for both the underground PEA and the updated Stockwork Zone PFS, demonstrating strong project viability. The resource update also shows significant growth and improved confidence. The studies are well-supported by QP sign-offs and compliant with NI 43-101, indicating a high level of confidence in the reported figures.

Positive factors

  • Two robust economic studies (PEA and PFS) presented for different project components, showing strong after-tax NPVs and IRRs.
  • Significant contained metal growth and grade increases in the updated Mineral Resource Estimate, particularly for out-of-pit M&I resources.
  • Fast payback periods for both the PEA and PFS scenarios.
  • Metallurgical test work completed by reputable laboratories with good recoveries for gold and silver.
  • Studies and estimates are NI 43-101 compliant with multiple Qualified Persons named.

Negative factors

  • The PEA is a preliminary study and not bankable.
  • Base metals provide no economic benefit under the proposed cyanidation process for the underground PEA.
  • The PFS uses higher metal prices than a previous 2024 PFS, which could inflate economics if prices decline.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 134

Classification and evidence

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: A current resource fact retains the disclosed cut-off grade

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: the document describes a heap_leach route ("heap leach")

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a flotation route ("flotation")

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 134. Some facts used in scoring do not have a stored record.

Resource Estimates (132)

provenEl Tigre · goldTonnes: 19564000Grade: 0.4Grade Unit: g/tContained Metal: 252Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:09e3a8884296e44bb5c9
Deposit or zone
Oxide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
19564000
Grade
0.4
Grade Unit
g/t
Contained Metal
252
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The proven oxide gold reserve contributes significantly to the project's economic viability and de-risking.

Positive factors

  • Proven reserve classification indicates high confidence.
  • Good gold grade for an open pit oxide reserve.

Evidence · table

“0.4”

Context: 19,564

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenEl Tigre · silverTonnes: 19564000Grade: 16.4Grade Unit: g/tContained Metal: 10316Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:09e3a8884296e44bb5c9
Deposit or zone
Oxide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
19564000
Grade
16.4
Grade Unit
g/t
Contained Metal
10316
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The proven oxide silver reserve contributes significantly to the project's economic viability and de-risking.

Positive factors

  • Proven reserve classification indicates high confidence.
  • Good silver grade for an open pit oxide reserve.

Evidence · table

“16.4”

Context: 19,564

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenEl Tigre · goldTonnes: 4655000Grade: 0.52Grade Unit: g/tContained Metal: 78Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:8fb70918f3e438e790e4
Deposit or zone
Sulphide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
4655000
Grade
0.52
Grade Unit
g/t
Contained Metal
78
Contained Unit
koz
Cutoff Grade
0.16
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The proven sulphide gold reserve adds to the project's overall economic robustness.

Positive factors

  • Proven reserve classification indicates high confidence.
  • Good gold grade for an open pit sulphide reserve.

Evidence · table

“0.52”

Context: 4,655

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenEl Tigre · silverTonnes: 4655000Grade: 7.6Grade Unit: g/tContained Metal: 1137Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:8fb70918f3e438e790e4
Deposit or zone
Sulphide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
4655000
Grade
7.6
Grade Unit
g/t
Contained Metal
1137
Contained Unit
koz
Cutoff Grade
0.16
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The proven sulphide silver reserve contributes to the overall project, though the grade is on the lower side.

Positive factors

  • Proven reserve classification indicates high confidence.

Negative factors

  • Silver grade of 7.6 g/t for sulphide material is relatively low.

Evidence · table

“7.6”

Context: 4,655

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · goldTonnes: 14800000Grade: 0.37Grade Unit: g/tContained Metal: 176Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:01af5d70ab0e3ff74cb3
Deposit or zone
Oxide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
14800000
Grade
0.37
Grade Unit
g/t
Contained Metal
176
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The probable oxide gold reserve adds to the project's overall resource base, though at a moderate grade.

Positive factors

  • Probable reserve classification indicates reasonable confidence.

Negative factors

  • Gold grade of 0.37 g/t for oxide material is moderate.

Evidence · table

“0.37”

Context: 14,800

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · silverTonnes: 14800000Grade: 13.7Grade Unit: g/tContained Metal: 6519Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:01af5d70ab0e3ff74cb3
Deposit or zone
Oxide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
14800000
Grade
13.7
Grade Unit
g/t
Contained Metal
6519
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The probable oxide silver reserve adds to the project's overall resource base, though at a moderate grade.

Positive factors

  • Probable reserve classification indicates reasonable confidence.

Negative factors

  • Silver grade of 13.7 g/t for oxide material is moderate.

Evidence · table

“13.7”

Context: 14,800

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · goldTonnes: 1272000Grade: 0.43Grade Unit: g/tContained Metal: 18Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:5efaa38c5820b829d1e6
Deposit or zone
Sulphide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
1272000
Grade
0.43
Grade Unit
g/t
Contained Metal
18
Contained Unit
koz
Cutoff Grade
0.16
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The probable sulphide gold reserve contributes to the project's overall resource base, though at a moderate grade.

Positive factors

  • Probable reserve classification indicates reasonable confidence.

Negative factors

  • Gold grade of 0.43 g/t for sulphide material is moderate.

Evidence · table

“0.43”

Context: 1,272

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · silverTonnes: 1272000Grade: 33.8Grade Unit: g/tContained Metal: 1382Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:5efaa38c5820b829d1e6
Deposit or zone
Sulphide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
1272000
Grade
33.8
Grade Unit
g/t
Contained Metal
1382
Contained Unit
koz
Cutoff Grade
0.16
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The probable sulphide silver reserve adds to the project's overall resource base with a good grade.

Positive factors

  • Probable reserve classification indicates reasonable confidence.
  • Good silver grade for an open pit sulphide reserve.

Evidence · table

“33.8”

Context: 1,272

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · goldTonnes: 34365000Grade: 0.39Grade Unit: g/tContained Metal: 428Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:a013f25b66e0d18fae83
Deposit or zone
Oxide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
34365000
Grade
0.39
Grade Unit
g/t
Contained Metal
428
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The combined Proven and Probable oxide gold reserve provides a strong foundation for the project's economics.

Positive factors

  • Combined Proven and Probable classification indicates high confidence.
  • Good contained gold metal in oxide material.

Evidence · table

“0.39”

Context: 34,365

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · silverTonnes: 34365000Grade: 15.2Grade Unit: g/tContained Metal: 16834Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:a013f25b66e0d18fae83
Deposit or zone
Oxide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
34365000
Grade
15.2
Grade Unit
g/t
Contained Metal
16834
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The combined Proven and Probable oxide silver reserve provides a strong foundation for the project's economics.

Positive factors

  • Combined Proven and Probable classification indicates high confidence.
  • Good contained silver metal in oxide material.

Evidence · table

“15.2”

Context: 34,365

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · goldTonnes: 5928000Grade: 0.5Grade Unit: g/tContained Metal: 95Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:fbbcbe03c0d28c3b2aaa
Deposit or zone
Sulphide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
5928000
Grade
0.5
Grade Unit
g/t
Contained Metal
95
Contained Unit
koz
Cutoff Grade
0.16
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The combined Proven and Probable sulphide gold reserve adds to the project's overall economic robustness.

Positive factors

  • Combined Proven and Probable classification indicates high confidence.
  • Good contained gold metal in sulphide material.

Evidence · table

“0.5”

Context: 5,928

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · silverTonnes: 5928000Grade: 13.2Grade Unit: g/tContained Metal: 2520Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:fbbcbe03c0d28c3b2aaa
Deposit or zone
Sulphide
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
5928000
Grade
13.2
Grade Unit
g/t
Contained Metal
2520
Contained Unit
koz
Cutoff Grade
0.16
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The combined Proven and Probable sulphide silver reserve contributes to the project's overall resource base, though at a moderate grade.

Positive factors

  • Combined Proven and Probable classification indicates high confidence.

Negative factors

  • Silver grade of 13.2 g/t for sulphide material is moderate.

Evidence · table

“13.2”

Context: 5,928

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · goldTonnes: 40292000Grade: 0.4Grade Unit: g/tContained Metal: 523Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:133da258e78623f5ac30
Deposit or zone
Total 2P
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
40292000
Grade
0.4
Grade Unit
g/t
Contained Metal
523
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The total Proven and Probable gold reserve provides a substantial and high-confidence base for the project's economic studies.

Positive factors

  • Large total Proven and Probable gold reserve.
  • High confidence in the reserve classification.

Evidence · table

“0.4”

Context: 40,292

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · silverTonnes: 40292000Grade: 14.9Grade Unit: g/tContained Metal: 19354Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:133da258e78623f5ac30
Deposit or zone
Total 2P
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
40292000
Grade
14.9
Grade Unit
g/t
Contained Metal
19354
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The total Proven and Probable silver reserve provides a substantial and high-confidence base for the project's economic studies.

Positive factors

  • Large total Proven and Probable silver reserve.
  • High confidence in the reserve classification.

Evidence · table

“14.9”

Context: 40,292

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 27732000Grade: 0.54Grade Unit: g/tContained Metal: 609Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:6c0fa144ca2250f1de89
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
27732000
Grade
0.54
Grade Unit
g/t
Contained Metal
609
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves.

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.54”

Context: 27,732

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 27732000Grade: 39Grade Unit: g/tContained Metal: 35034Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:6c0fa144ca2250f1de89
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
27732000
Grade
39
Grade Unit
g/t
Contained Metal
35034
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured silver resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves.

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good silver grade for pit-constrained oxide material.

Evidence · table

“39”

Context: 27,732

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 19804000Grade: 0.36Grade Unit: g/tContained Metal: 75Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:74bc5f88ffdb647d6173
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
19804000
Grade
0.36
Grade Unit
g/t
Contained Metal
75
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.36”

Context: 19,804

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 19804000Grade: 10Grade Unit: g/tContained Metal: 6593Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:74bc5f88ffdb647d6173
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
19804000
Grade
10
Grade Unit
g/t
Contained Metal
6593
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated silver resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Silver grade of 10 g/t for pit-constrained oxide material is moderate.

Evidence · table

“10”

Context: 19,804

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 4475000Grade: 0.38Grade Unit: g/tContained Metal: 18Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:fb4202c20909250b3525
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4475000
Grade
0.38
Grade Unit
g/t
Contained Metal
18
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.38”

Context: 4,475

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 4475000Grade: 10Grade Unit: g/tContained Metal: 1453Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:fb4202c20909250b3525
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4475000
Grade
10
Grade Unit
g/t
Contained Metal
1453
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred silver resource provides exploration upside but requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Silver grade of 10 g/t for pit-constrained oxide material is moderate.

Evidence · table

“10”

Context: 4,475

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 6031000Grade: 0.54Grade Unit: g/tContained Metal: 105Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:981058f5676ea9e1d8de
Deposit or zone
Pit-Constrained Sulphide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
6031000
Grade
0.54
Grade Unit
g/t
Contained Metal
105
Contained Unit
koz
Cutoff Grade
0.12
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained sulphide zone provides a high-confidence base for future studies.

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained sulphide material.

Evidence · table

“0.54”

Context: 6,031

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 6031000Grade: 31Grade Unit: g/tContained Metal: 6042Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:981058f5676ea9e1d8de
Deposit or zone
Pit-Constrained Sulphide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
6031000
Grade
31
Grade Unit
g/t
Contained Metal
6042
Contained Unit
koz
Cutoff Grade
0.12
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured silver resource in the pit-constrained sulphide zone provides a high-confidence base for future studies.

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good silver grade for pit-constrained sulphide material.

Evidence · table

“31”

Context: 6,031

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 1723000Grade: 0.46Grade Unit: g/tContained Metal: 25Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:ef11d21d537dd07e5243
Deposit or zone
Pit-Constrained Sulphide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1723000
Grade
0.46
Grade Unit
g/t
Contained Metal
25
Contained Unit
koz
Cutoff Grade
0.12
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained sulphide zone adds to the project's resource base, though at a moderate grade.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.46 g/t for pit-constrained sulphide material is moderate.

Evidence · table

“0.46”

Context: 1,723

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 1723000Grade: 14Grade Unit: g/tContained Metal: 756Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:ef11d21d537dd07e5243
Deposit or zone
Pit-Constrained Sulphide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1723000
Grade
14
Grade Unit
g/t
Contained Metal
756
Contained Unit
koz
Cutoff Grade
0.12
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated silver resource in the pit-constrained sulphide zone adds to the project's resource base, though at a moderate grade.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Silver grade of 14 g/t for pit-constrained sulphide material is moderate.

Evidence · table

“14”

Context: 1,723

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 463000Grade: 0.52Grade Unit: g/tContained Metal: 8Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:0f3464f69c428ed82c81
Deposit or zone
Pit-Constrained Sulphide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
463000
Grade
0.52
Grade Unit
g/t
Contained Metal
8
Contained Unit
koz
Cutoff Grade
0.12
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.52 g/t for pit-constrained sulphide material is moderate.

Evidence · table

“0.52”

Context: 463

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 463000Grade: 74Grade Unit: g/tContained Metal: 1096Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:0f3464f69c428ed82c81
Deposit or zone
Pit-Constrained Sulphide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
463000
Grade
74
Grade Unit
g/t
Contained Metal
1096
Contained Unit
koz
Cutoff Grade
0.12
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred silver resource in the pit-constrained sulphide zone provides exploration upside with a good grade, but requires further drilling to upgrade confidence.

Positive factors

  • Good silver grade for pit-constrained sulphide inferred resource.

Negative factors

  • Inferred resource classification has lower geological confidence.

Evidence · table

“74”

Context: 463

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 1010000Grade: 1.05Grade Unit: g/tContained Metal: 34Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:9a98040ccbb907e78d40
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010000
Grade
1.05
Grade Unit
g/t
Contained Metal
34
Contained Unit
koz
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The high-grade measured gold resource in the out-of-pit category represents a valuable component for potential underground mining.

Positive factors

  • High gold grade for out-of-pit measured resource.
  • Measured resource classification indicates high geological confidence.

Evidence · table

“1.05”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 1010000Grade: 453Grade Unit: g/tContained Metal: 14698Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:9a98040ccbb907e78d40
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010000
Grade
453
Grade Unit
g/t
Contained Metal
14698
Contained Unit
koz
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The exceptionally high-grade measured silver resource in the out-of-pit category is a significant positive, indicating strong potential for underground mining.

Positive factors

  • Exceptional silver grade for out-of-pit measured resource.
  • Measured resource classification indicates high geological confidence.

Evidence · table

“453”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · copperTonnes: 1010000Grade: 0.13Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:9a98040ccbb907e78d40
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010000
Grade
0.13
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured copper resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver.

Positive factors

  • Measured resource classification indicates high geological confidence.

Negative factors

  • Copper grade of 0.13% is weak and likely not economic as a primary commodity.

Evidence · table

“0.13”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · leadTonnes: 1010000Grade: 0.54Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:9a98040ccbb907e78d40
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010000
Grade
0.54
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured lead resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver.

Positive factors

  • Measured resource classification indicates high geological confidence.

Negative factors

  • Lead grade of 0.54% is weak and likely not economic as a primary commodity.

Evidence · table

“0.54”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · zincTonnes: 1010000Grade: 0.92Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:9a98040ccbb907e78d40
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010000
Grade
0.92
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured zinc resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver.

Positive factors

  • Measured resource classification indicates high geological confidence.

Negative factors

  • Zinc grade of 0.92% is weak and likely not economic as a primary commodity.

Evidence · table

“0.92”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 1374000Grade: 1.05Grade Unit: g/tContained Metal: 47Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:a2f5a2c38f312a68b6dd
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374000
Grade
1.05
Grade Unit
g/t
Contained Metal
47
Contained Unit
koz
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The high-grade indicated gold resource in the out-of-pit category represents a valuable component for potential underground mining.

Positive factors

  • High gold grade for out-of-pit indicated resource.
  • Indicated resource classification provides reasonable geological confidence.

Evidence · table

“1.05”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 1374000Grade: 398Grade Unit: g/tContained Metal: 17588Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:a2f5a2c38f312a68b6dd
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374000
Grade
398
Grade Unit
g/t
Contained Metal
17588
Contained Unit
koz
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The exceptionally high-grade indicated silver resource in the out-of-pit category is a significant positive, indicating strong potential for underground mining.

Positive factors

  • Exceptional silver grade for out-of-pit indicated resource.
  • Indicated resource classification provides reasonable geological confidence.

Evidence · table

“398”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · copperTonnes: 1374000Grade: 0.08Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:a2f5a2c38f312a68b6dd
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374000
Grade
0.08
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated copper resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Copper grade of 0.08% is weak and likely not economic as a primary commodity.

Evidence · table

“0.08”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · leadTonnes: 1374000Grade: 0.24Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:a2f5a2c38f312a68b6dd
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374000
Grade
0.24
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated lead resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Lead grade of 0.24% is weak and likely not economic as a primary commodity.

Evidence · table

“0.24”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · zincTonnes: 1374000Grade: 0.41Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:a2f5a2c38f312a68b6dd
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374000
Grade
0.41
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated zinc resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Zinc grade of 0.41% is weak and likely not economic as a primary commodity.

Evidence · table

“0.41”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 4100000Grade: 1.58Grade Unit: g/tContained Metal: 208Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b028beec620db3ab9e96
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100000
Grade
1.58
Grade Unit
g/t
Contained Metal
208
Contained Unit
koz
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The high-grade inferred gold resource in the out-of-pit category provides significant exploration upside for potential underground mining.

Positive factors

  • High gold grade for out-of-pit inferred resource.

Negative factors

  • Inferred resource classification has lower geological confidence.

Evidence · table

“1.58”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 4100000Grade: 294Grade Unit: g/tContained Metal: 38822Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b028beec620db3ab9e96
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100000
Grade
294
Grade Unit
g/t
Contained Metal
38822
Contained Unit
koz
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The exceptionally high-grade inferred silver resource in the out-of-pit category provides significant exploration upside for potential underground mining.

Positive factors

  • Exceptional silver grade for out-of-pit inferred resource.

Negative factors

  • Inferred resource classification has lower geological confidence.

Evidence · table

“294”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · copperTonnes: 4100000Grade: 0.32Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b028beec620db3ab9e96
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100000
Grade
0.32
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred copper resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver, and requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Copper grade of 0.32% is weak and likely not economic as a primary commodity.

Evidence · table

“0.32”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · leadTonnes: 4100000Grade: 0.75Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b028beec620db3ab9e96
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100000
Grade
0.75
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred lead resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver, and requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Lead grade of 0.75% is weak and likely not economic as a primary commodity.

Evidence · table

“0.75”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · zincTonnes: 4100000Grade: 0.89Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b028beec620db3ab9e96
Deposit or zone
Out-Of-Pit
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100000
Grade
0.89
Grade Unit
%
Cutoff Grade
1.28
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred zinc resource is present but at a very low grade, suggesting it is a minor byproduct rather than a primary economic driver, and requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Zinc grade of 0.89% is weak and likely not economic as a primary commodity.

Evidence · table

“0.89”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 146000Grade: 0.29Grade Unit: g/tContained Metal: 1Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:6ec2756469805435af4b
Deposit or zone
Tailings
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
146000
Grade
0.29
Grade Unit
g/t
Contained Metal
1
Contained Unit
koz
Cutoff Grade
0.45
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in tailings provides a small, low-grade component that could be reprocessed.

Positive factors

  • Measured resource classification indicates high geological confidence.

Negative factors

  • Gold grade of 0.29 g/t for tailings is low.

Evidence · table

“0.29”

Context: 146

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 146000Grade: 79Grade Unit: g/tContained Metal: 371Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:6ec2756469805435af4b
Deposit or zone
Tailings
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
146000
Grade
79
Grade Unit
g/t
Contained Metal
371
Contained Unit
koz
Cutoff Grade
0.45
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured silver resource in tailings provides a small, good-grade component that could be reprocessed.

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good silver grade for tailings material.

Evidence · table

“79”

Context: 146

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 706000Grade: 0.26Grade Unit: g/tContained Metal: 6Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:95264a442de021a03d89
Deposit or zone
Tailings
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
706000
Grade
0.26
Grade Unit
g/t
Contained Metal
6
Contained Unit
koz
Cutoff Grade
0.45
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in tailings provides a small, low-grade component that could be reprocessed.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.26 g/t for tailings is low.

Evidence · table

“0.26”

Context: 706

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 706000Grade: 77Grade Unit: g/tContained Metal: 1752Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:95264a442de021a03d89
Deposit or zone
Tailings
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
706000
Grade
77
Grade Unit
g/t
Contained Metal
1752
Contained Unit
koz
Cutoff Grade
0.45
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated silver resource in tailings provides a small, good-grade component that could be reprocessed.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.
  • Good silver grade for tailings material.

Evidence · table

“77”

Context: 706

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 52000Grade: 0.27Grade Unit: g/tContained Metal: 1Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:637a7932669db22fbdfc
Deposit or zone
Tailings
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
52000
Grade
0.27
Grade Unit
g/t
Contained Metal
1
Contained Unit
koz
Cutoff Grade
0.45
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource in tailings provides a small, low-grade component that could be reprocessed, but requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.27 g/t for tailings is low.

Evidence · table

“0.27”

Context: 52

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 52000Grade: 81Grade Unit: g/tContained Metal: 134Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:637a7932669db22fbdfc
Deposit or zone
Tailings
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
52000
Grade
81
Grade Unit
g/t
Contained Metal
134
Contained Unit
koz
Cutoff Grade
0.45
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred silver resource in tailings provides a small, good-grade component that could be reprocessed, but requires further drilling to upgrade confidence.

Positive factors

  • Good silver grade for tailings material.

Negative factors

  • Inferred resource classification has lower geological confidence.

Evidence · table

“81”

Context: 52

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 101000Grade: 0.92Grade Unit: g/tContained Metal: 3Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:11e0d53b4ee9262cdb27
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101000
Grade
0.92
Grade Unit
g/t
Contained Metal
3
Contained Unit
koz
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the stockpile provides a small, good-grade component that can be readily processed.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.
  • Good gold grade for stockpile material.

Evidence · table

“0.92”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 101000Grade: 181Grade Unit: g/tContained Metal: 586Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:11e0d53b4ee9262cdb27
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101000
Grade
181
Grade Unit
g/t
Contained Metal
586
Contained Unit
koz
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated silver resource in the stockpile provides a small, high-grade component that can be readily processed.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.
  • High silver grade for stockpile material.

Evidence · table

“181”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · copperTonnes: 101000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:11e0d53b4ee9262cdb27
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101000
Grade
0.02
Grade Unit
%
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated copper resource in the stockpile is present but at a negligible grade, indicating it is a trace element.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Copper grade of 0.02% is very weak and likely not economic.

Evidence · table

“0.02”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · leadTonnes: 101000Grade: 0.23Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:11e0d53b4ee9262cdb27
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101000
Grade
0.23
Grade Unit
%
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated lead resource in the stockpile is present but at a negligible grade, indicating it is a trace element.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Lead grade of 0.23% is very weak and likely not economic.

Evidence · table

“0.23”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · zincTonnes: 101000Grade: 0.1Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:11e0d53b4ee9262cdb27
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101000
Grade
0.1
Grade Unit
%
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated zinc resource in the stockpile is present but at a negligible grade, indicating it is a trace element.

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Zinc grade of 0.10% is very weak and likely not economic.

Evidence · table

“0.10”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 18000Grade: 0.46Grade Unit: g/tContained Metal: 0.3Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:8d535c5d9d02f6774ed4
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18000
Grade
0.46
Grade Unit
g/t
Contained Metal
0.3
Contained Unit
koz
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource in the stockpile provides a small, moderate-grade component that requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.46 g/t for stockpile material is moderate.

Evidence · table

“0.46”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 18000Grade: 146Grade Unit: g/tContained Metal: 83Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:8d535c5d9d02f6774ed4
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18000
Grade
146
Grade Unit
g/t
Contained Metal
83
Contained Unit
koz
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred silver resource in the stockpile provides a small, good-grade component that requires further drilling to upgrade confidence.

Positive factors

  • Good silver grade for stockpile material.

Negative factors

  • Inferred resource classification has lower geological confidence.

Evidence · table

“146”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · copperTonnes: 18000Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:8d535c5d9d02f6774ed4
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18000
Grade
0.02
Grade Unit
%
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred copper resource in the stockpile is present but at a negligible grade, indicating it is a trace element, and requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Copper grade of 0.02% is very weak and likely not economic.

Evidence · table

“0.02”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · leadTonnes: 18000Grade: 0.17Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:8d535c5d9d02f6774ed4
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18000
Grade
0.17
Grade Unit
%
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred lead resource in the stockpile is present but at a negligible grade, indicating it is a trace element, and requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Lead grade of 0.17% is very weak and likely not economic.

Evidence · table

“0.17”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · zincTonnes: 18000Grade: 0.09Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:8d535c5d9d02f6774ed4
Deposit or zone
Stockpile
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18000
Grade
0.09
Grade Unit
%
Cutoff Grade
0.46
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred zinc resource in the stockpile is present but at a negligible grade, indicating it is a trace element, and requires further drilling to upgrade confidence.

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Zinc grade of 0.09% is very weak and likely not economic.

Evidence · table

“0.09”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenEl Tigre · goldTonnes: 24220Grade: 0.43Grade Unit: g/tContained Metal: 329Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:09a3779c968283f7bed5
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
24220
Grade
0.43
Grade Unit
g/t
Contained Metal
329
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Metal Eq. Grade
0.52
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The proven oxide gold reserve contributes significantly to the project's economic viability and de-risking. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Proven reserve classification indicates high confidence.
  • Good gold grade for an open pit oxide reserve.

Evidence · table

“0.43”

Context: 24,220

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenEl Tigre · silverTonnes: 24220Grade: 14.7Grade Unit: g/tContained Metal: 11453Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:09a3779c968283f7bed5
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
24220
Grade
14.7
Grade Unit
g/t
Contained Metal
11453
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Metal Eq. Grade
0.52
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The proven oxide gold reserve contributes significantly to the project's economic viability and de-risking. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Proven reserve classification indicates high confidence.
  • Good gold grade for an open pit oxide reserve.

Evidence · table

“14.7”

Context: 24,220

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · goldTonnes: 16073Grade: 0.37Grade Unit: g/tContained Metal: 194Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:4fb170647f0ebd852c55
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
16073
Grade
0.37
Grade Unit
g/t
Contained Metal
194
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Metal Eq. Grade
0.47
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The probable oxide gold reserve adds to the project's overall resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Probable reserve classification indicates reasonable confidence.

Negative factors

  • Gold grade of 0.37 g/t for oxide material is moderate.

Evidence · table

“0.37”

Context: 16,073

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · silverTonnes: 16073Grade: 15.3Grade Unit: g/tContained Metal: 7901Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:4fb170647f0ebd852c55
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
16073
Grade
15.3
Grade Unit
g/t
Contained Metal
7901
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Metal Eq. Grade
0.47
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The probable oxide gold reserve adds to the project's overall resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Probable reserve classification indicates reasonable confidence.

Negative factors

  • Gold grade of 0.37 g/t for oxide material is moderate.

Evidence · table

“15.3”

Context: 16,073

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · goldTonnes: 40292Grade: 0.4Grade Unit: g/tContained Metal: 523Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:20b0c11b3989121ecd14
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
40292
Grade
0.4
Grade Unit
g/t
Contained Metal
523
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Metal Eq. Grade
0.5
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The probable oxide gold reserve adds to the project's overall resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Probable reserve classification indicates reasonable confidence.

Negative factors

  • Gold grade of 0.37 g/t for oxide material is moderate.

Evidence · table

“0.4”

Context: 40,292

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Tigre · silverTonnes: 40292Grade: 14.9Grade Unit: g/tContained Metal: 19354Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
reserve
Effective date
2024-10-22T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Andrew Bradfield
Resource group id
resource:20b0c11b3989121ecd14
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
40292
Grade
14.9
Grade Unit
g/t
Contained Metal
19354
Contained Unit
koz
Cutoff Grade
0.11
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2024-10-22

Metal Equivalent

Metal Eq. Grade
0.5
Metal Eq. Unit
g/t AuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The probable oxide gold reserve adds to the project's overall resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Probable reserve classification indicates reasonable confidence.

Negative factors

  • Gold grade of 0.37 g/t for oxide material is moderate.

Evidence · table

“14.9”

Context: 40,292

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 27732Grade: 39Grade Unit: g/tContained Metal: 35034Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:5797a81da28d9ea1e47e
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
27732
Grade
39
Grade Unit
g/t
Contained Metal
35034
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
136
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“39”

Context: 27,732

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 27732Grade: 0.54Grade Unit: g/tContained Metal: 609Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:5797a81da28d9ea1e47e
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
27732
Grade
0.54
Grade Unit
g/t
Contained Metal
609
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
136
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.54”

Context: 27,732

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 19804Grade: 10Grade Unit: g/tContained Metal: 6593Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:5f2372fd3fa04f5e4a41
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
19804
Grade
10
Grade Unit
g/t
Contained Metal
6593
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
74
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“10”

Context: 19,804

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 19804Grade: 0.36Grade Unit: g/tContained Metal: 75Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:5f2372fd3fa04f5e4a41
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
19804
Grade
0.36
Grade Unit
g/t
Contained Metal
75
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
74
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.36”

Context: 19,804

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 4475Grade: 10Grade Unit: g/tContained Metal: 1453Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:e3d12e8db32370c6bfc0
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4475
Grade
10
Grade Unit
g/t
Contained Metal
1453
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
77
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“10”

Context: 4,475

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 4475Grade: 0.38Grade Unit: g/tContained Metal: 18Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:e3d12e8db32370c6bfc0
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4475
Grade
0.38
Grade Unit
g/t
Contained Metal
18
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
77
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.38”

Context: 4,475

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 6031Grade: 31Grade Unit: g/tContained Metal: 6042Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:f3e04970aa61fd1a276f
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
6031
Grade
31
Grade Unit
g/t
Contained Metal
6042
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
96
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“31”

Context: 6,031

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 6031Grade: 0.54Grade Unit: g/tContained Metal: 105Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:f3e04970aa61fd1a276f
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
6031
Grade
0.54
Grade Unit
g/t
Contained Metal
105
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
96
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.54”

Context: 6,031

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 1723Grade: 14Grade Unit: g/tContained Metal: 756Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:0117de237f9bcc2f34cb
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1723
Grade
14
Grade Unit
g/t
Contained Metal
756
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
69
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“14”

Context: 1,723

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 1723Grade: 0.46Grade Unit: g/tContained Metal: 25Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:0117de237f9bcc2f34cb
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1723
Grade
0.46
Grade Unit
g/t
Contained Metal
25
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
69
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.46”

Context: 1,723

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 463Grade: 74Grade Unit: g/tContained Metal: 1096Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:e537eb3d77007db9484a
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
463
Grade
74
Grade Unit
g/t
Contained Metal
1096
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
136
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“74”

Context: 463

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 463Grade: 0.52Grade Unit: g/tContained Metal: 8Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:e537eb3d77007db9484a
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
463
Grade
0.52
Grade Unit
g/t
Contained Metal
8
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
136
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.52”

Context: 463

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 33763Grade: 38Grade Unit: g/tContained Metal: 41076Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b88880400ad54803ee71
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
33763
Grade
38
Grade Unit
g/t
Contained Metal
41076
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
129
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“38”

Context: 33,763

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 33763Grade: 0.54Grade Unit: g/tContained Metal: 588Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b88880400ad54803ee71
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
33763
Grade
0.54
Grade Unit
g/t
Contained Metal
588
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
129
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.54”

Context: 33,763

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 21528Grade: 11Grade Unit: g/tContained Metal: 7348Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:7007943e2204c81e29f6
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
21528
Grade
11
Grade Unit
g/t
Contained Metal
7348
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
73
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“11”

Context: 21,528

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 21528Grade: 0.36Grade Unit: g/tContained Metal: 252Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:7007943e2204c81e29f6
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
21528
Grade
0.36
Grade Unit
g/t
Contained Metal
252
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
73
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.36”

Context: 21,528

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 4939Grade: 16Grade Unit: g/tContained Metal: 2550Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b49923852b93fcc24005
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4939
Grade
16
Grade Unit
g/t
Contained Metal
2550
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
82
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“16”

Context: 4,939

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 4939Grade: 0.39Grade Unit: g/tContained Metal: 62Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:b49923852b93fcc24005
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4939
Grade
0.39
Grade Unit
g/t
Contained Metal
62
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
82
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.39”

Context: 4,939

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 1010Grade: 453Grade Unit: g/tContained Metal: 14698Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:fb66b0f917cb8d284653
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010
Grade
453
Grade Unit
g/t
Contained Metal
14698
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
589
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“453”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 1010Grade: 1.05Grade Unit: g/tContained Metal: 34Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:fb66b0f917cb8d284653
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010
Grade
1.05
Grade Unit
g/t
Contained Metal
34
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
589
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“1.05”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · copperTonnes: 1010Grade: 0.13Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:fb66b0f917cb8d284653
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010
Grade
0.13
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
589
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.13”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · leadTonnes: 1010Grade: 0.54Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:fb66b0f917cb8d284653
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010
Grade
0.54
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
589
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.54”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · zincTonnes: 1010Grade: 0.92Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:fb66b0f917cb8d284653
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
1010
Grade
0.92
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
589
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.92”

Context: 1,010

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 1374Grade: 398Grade Unit: g/tContained Metal: 17588Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:3837151bd8751c3468a2
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374
Grade
398
Grade Unit
g/t
Contained Metal
17588
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
509
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“398”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 1374Grade: 1.05Grade Unit: g/tContained Metal: 47Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:3837151bd8751c3468a2
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374
Grade
1.05
Grade Unit
g/t
Contained Metal
47
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
509
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“1.05”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · copperTonnes: 1374Grade: 0.08Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:3837151bd8751c3468a2
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374
Grade
0.08
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
509
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.08”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · leadTonnes: 1374Grade: 0.24Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:3837151bd8751c3468a2
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374
Grade
0.24
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
509
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.24”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · zincTonnes: 1374Grade: 0.41Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:3837151bd8751c3468a2
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
1374
Grade
0.41
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
509
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.41”

Context: 1,374

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 4100Grade: 294Grade Unit: g/tContained Metal: 38822Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:506d7d6ed7727ecbb720
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100
Grade
294
Grade Unit
g/t
Contained Metal
38822
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
497
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“294”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 4100Grade: 1.58Grade Unit: g/tContained Metal: 208Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:506d7d6ed7727ecbb720
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100
Grade
1.58
Grade Unit
g/t
Contained Metal
208
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
497
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“1.58”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · copperTonnes: 4100Grade: 0.32Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:506d7d6ed7727ecbb720
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100
Grade
0.32
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
497
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.32”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · leadTonnes: 4100Grade: 0.75Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:506d7d6ed7727ecbb720
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100
Grade
0.75
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
497
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.75”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · zincTonnes: 4100Grade: 0.89Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:506d7d6ed7727ecbb720
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4100
Grade
0.89
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
497
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.89”

Context: 4,100

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 146Grade: 79Grade Unit: g/tContained Metal: 371Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:cc4fb3d6a9b357f832dd
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
146
Grade
79
Grade Unit
g/t
Contained Metal
371
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
103
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“79”

Context: 146

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 146Grade: 0.29Grade Unit: g/tContained Metal: 1Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:cc4fb3d6a9b357f832dd
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
146
Grade
0.29
Grade Unit
g/t
Contained Metal
1
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
103
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.29”

Context: 146

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 706Grade: 77Grade Unit: g/tContained Metal: 1752Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:f90ddbdc7e3cf699439b
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
706
Grade
77
Grade Unit
g/t
Contained Metal
1752
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
99
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“77”

Context: 706

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 706Grade: 0.26Grade Unit: g/tContained Metal: 6Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:f90ddbdc7e3cf699439b
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
706
Grade
0.26
Grade Unit
g/t
Contained Metal
6
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
99
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.26”

Context: 706

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 52Grade: 81Grade Unit: g/tContained Metal: 134Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:2a983543fc2390458019
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
52
Grade
81
Grade Unit
g/t
Contained Metal
134
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
104
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“81”

Context: 52

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 52Grade: 0.27Grade Unit: g/tContained Metal: 1Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:2a983543fc2390458019
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
52
Grade
0.27
Grade Unit
g/t
Contained Metal
1
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
104
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.27”

Context: 52

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 0Grade: 0Grade Unit: g/tContained Metal: 0Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:d277f7fb051093fea27e
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
0
Grade
0
Grade Unit
g/t
Contained Metal
0
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
0
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0”

Context: 0

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 0Grade: 0Grade Unit: g/tContained Metal: 0Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:d277f7fb051093fea27e
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
0
Grade
0
Grade Unit
g/t
Contained Metal
0
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
0
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0”

Context: 0

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · copperTonnes: 0Grade: 0Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:d277f7fb051093fea27e
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
0
Grade
0
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
0
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0”

Context: 0

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · leadTonnes: 0Grade: 0Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:d277f7fb051093fea27e
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
0
Grade
0
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
0
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0”

Context: 0

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · zincTonnes: 0Grade: 0Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:d277f7fb051093fea27e
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
0
Grade
0
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
0
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0”

Context: 0

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 101Grade: 181Grade Unit: g/tContained Metal: 586Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:1f454565eb145fc1db93
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101
Grade
181
Grade Unit
g/t
Contained Metal
586
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
256
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“181”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 101Grade: 0.92Grade Unit: g/tContained Metal: 3Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:1f454565eb145fc1db93
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101
Grade
0.92
Grade Unit
g/t
Contained Metal
3
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
256
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.92”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · copperTonnes: 101Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:1f454565eb145fc1db93
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101
Grade
0.02
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
256
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.02”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · leadTonnes: 101Grade: 0.23Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:1f454565eb145fc1db93
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101
Grade
0.23
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
256
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.23”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · zincTonnes: 101Grade: 0.1Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:1f454565eb145fc1db93
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
101
Grade
0.1
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
256
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.10”

Context: 101

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 18Grade: 146Grade Unit: g/tContained Metal: 83Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:2ff3cd6c88c4ba56fefa
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18
Grade
146
Grade Unit
g/t
Contained Metal
83
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
183
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“146”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 18Grade: 0.46Grade Unit: g/tContained Metal: 0.3Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:2ff3cd6c88c4ba56fefa
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18
Grade
0.46
Grade Unit
g/t
Contained Metal
0.3
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
183
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.46”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · copperTonnes: 18Grade: 0.02Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:2ff3cd6c88c4ba56fefa
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18
Grade
0.02
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
183
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.02”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · leadTonnes: 18Grade: 0.17Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:2ff3cd6c88c4ba56fefa
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18
Grade
0.17
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
183
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.17”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · zincTonnes: 18Grade: 0.09Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:2ff3cd6c88c4ba56fefa
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
18
Grade
0.09
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
183
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.09”

Context: 18

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · silverTonnes: 34920Grade: 50Grade Unit: g/tContained Metal: 56145Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:19d6b4b13a895d54c811
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
34920
Grade
50
Grade Unit
g/t
Contained Metal
56145
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
142
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“50”

Context: 34,920

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · goldTonnes: 34920Grade: 0.55Grade Unit: g/tContained Metal: 623Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:19d6b4b13a895d54c811
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
34920
Grade
0.55
Grade Unit
g/t
Contained Metal
623
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
142
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.55”

Context: 34,920

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · copperTonnes: 34920Grade: 0.13Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:19d6b4b13a895d54c811
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
34920
Grade
0.13
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
142
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.13”

Context: 34,920

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · leadTonnes: 34920Grade: 0.54Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:19d6b4b13a895d54c811
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
34920
Grade
0.54
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
142
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.54”

Context: 34,920

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredEl Tigre · zincTonnes: 34920Grade: 0.92Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:19d6b4b13a895d54c811
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
34920
Grade
0.92
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
142
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The measured gold resource in the pit-constrained oxide zone provides a high-confidence base for future studies and potential conversion to reserves. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Measured resource classification indicates high geological confidence.
  • Good gold grade for pit-constrained oxide material.

Evidence · table

“0.92”

Context: 34,920

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · silverTonnes: 23708Grade: 36Grade Unit: g/tContained Metal: 27275Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:cb21c1b2dd50e3304fc8
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
23708
Grade
36
Grade Unit
g/t
Contained Metal
27275
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
100
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“36”

Context: 23,708

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · goldTonnes: 23708Grade: 0.4Grade Unit: g/tContained Metal: 308Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:cb21c1b2dd50e3304fc8
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
23708
Grade
0.4
Grade Unit
g/t
Contained Metal
308
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
100
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.40”

Context: 23,708

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · copperTonnes: 23708Grade: 0.07Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:cb21c1b2dd50e3304fc8
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
23708
Grade
0.07
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
100
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.07”

Context: 23,708

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · leadTonnes: 23708Grade: 0.24Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:cb21c1b2dd50e3304fc8
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
23708
Grade
0.24
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
100
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.24”

Context: 23,708

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Tigre · zincTonnes: 23708Grade: 0.39Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:cb21c1b2dd50e3304fc8
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
23708
Grade
0.39
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
100
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The indicated gold resource in the pit-constrained oxide zone adds to the project's resource base, though at a moderate grade. (Expanded from multi-commodity resource table for completeness.)

Positive factors

  • Indicated resource classification provides reasonable geological confidence.

Negative factors

  • Gold grade of 0.36 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.39”

Context: 23,708

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · silverTonnes: 9108Grade: 142Grade Unit: g/tContained Metal: 41589Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:248d68ff02c95c1e2a95
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
9108
Grade
142
Grade Unit
g/t
Contained Metal
41589
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
269
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“142”

Context: 9,108

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · goldTonnes: 9108Grade: 0.92Grade Unit: g/tContained Metal: 271Contained Unit: kozView all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:248d68ff02c95c1e2a95
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
9108
Grade
0.92
Grade Unit
g/t
Contained Metal
271
Contained Unit
koz
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
269
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.92”

Context: 9,108

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · copperTonnes: 9108Grade: 0.32Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
copper
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:248d68ff02c95c1e2a95
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
9108
Grade
0.32
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
269
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.32”

Context: 9,108

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · leadTonnes: 9108Grade: 0.75Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
lead
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:248d68ff02c95c1e2a95
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
9108
Grade
0.75
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
269
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.75”

Context: 9,108

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Tigre · zincTonnes: 9108Grade: 0.89Grade Unit: %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
zinc
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Resource scope

Estimate type
resource
Effective date
2025-06-20T00:00:00.000Z
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Dave Duncan, Charles Spath, Fred Brown, Eugene Puritch
Resource group id
resource:248d68ff02c95c1e2a95
Deposit or zone
Pit-Constrained Oxide
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
9108
Grade
0.89
Grade Unit
%
Cutoff Grade
0.08
Cutoff Unit
g/t AuEq

Prior Estimate

Resource Date
2025-06-20

Metal Equivalent

Metal Eq. Grade
269
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Lab

Laboratory
Bureau Veritas

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: The inferred gold resource provides exploration upside but requires further drilling to upgrade confidence. (Expanded from multi-commodity resource table for completeness.)

Negative factors

  • Inferred resource classification has lower geological confidence.
  • Gold grade of 0.38 g/t for pit-constrained oxide material is moderate.

Evidence · table

“0.89”

Context: 9,108

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (2)

crushing, coarse bottle rolls, column testingEl Tigre · silverRecovery: 43 %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
silver
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Test Work

Program Status
detailed
Test Type
crushing, coarse bottle rolls, column testing
Processing Route
heap leach, Merrill - Crowe process
Sample
Transition and Sulphide zones

Recovery

Recovery
43 %
Recovery Basis
actual_test

Lab

Laboratory
McClelland Laboratories, Inc., Sparks, Nevada

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: Silver recovery of 43% for transition and sulphide material is weak for heap leach, which could significantly impact overall silver production and revenue from these zones.

Positive factors

  • Test work completed by a reputable laboratory (McClelland Laboratories).

Negative factors

  • Silver recovery of 43% for transition and sulphide material is weak for heap leach, indicating significant losses.

Evidence · text

“The transition and sulfide zones had estimated recoveries of 59% Au and 43% Ag. Further percolation testing also confirmed no requirement for agglomeration of the crushed material is required prior to loading on the leach pad.”

Tags used in scoring

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: processing_route matches the heap_leach signal

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: 43% is below the weak band (75%)

crushing, coarse bottle rolls, column testingEl Tigre · goldRecovery: 59 %View all details
Link to this fact

Identity

Project
El Tigre
Commodity
gold
Region
mexico
Reported Region
Sonora, Mexico
Ticker
SLVR

Test Work

Program Status
detailed
Test Type
crushing, coarse bottle rolls, column testing
Processing Route
heap leach, Merrill - Crowe process
Sample
Transition and Sulphide zones

Recovery

Recovery
59 %
Recovery Basis
actual_test

Lab

Laboratory
McClelland Laboratories, Inc., Sparks, Nevada

Review

Needs Review
No
Historical
No

Dates

Event date
2026-01-20T00:00:00.000Z

Reasoning: Gold recovery of 59% for transition and sulphide material is lower than for oxide, suggesting potential metallurgical challenges or lower revenue from these zones.

Positive factors

  • Test work completed by a reputable laboratory (McClelland Laboratories).

Negative factors

  • Gold recovery of 59% for transition and sulphide material is moderate to weak for heap leach, indicating potential challenges.

Evidence · text

“The transition and sulfide zones had estimated recoveries of 59% Au and 43% Ag. Further percolation testing also confirmed no requirement for agglomeration of the crushed material is required prior to loading on the leach pad.”

Tags used in scoring

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: processing_route matches the heap_leach signal

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.