Surge Battery Metals Announces Filing of Updated Mineral Resource Estimate Technical Report

Original announcement by tmx on

Company
Surge Battery Metals Inc.
Ticker
NILI
Exchange
TSX
Region
Nevada
Primary commodity
Lithium
Secondary commodities
None reported
Document categories
Resource update
Extracted
2026-09-14 14:40:01 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Surge Battery Metals has filed an updated NI 43-101 Technical Report for the Nevada North Lithium Project. The project features a pit-constrained Measured & Indicated resource of 10.51 Mt LCE at 3007 ppm Li.

Reasoning: The filing of the NI 43-101 technical report formalizes the updated MRE, providing high-confidence geological data for the Nevada North project.

Positive factors

  • Pit-constrained Measured & Indicated resource established
  • High-grade lithium clay mineralization
  • NI 43-101 compliant technical report filed

Negative factors

  • Resource is a restatement of May 15, 2026 release

Facts used in scoring: 1

Classification and evidence

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The company announced the filing of an NI 43-101 Technical Report.

Evidence · text

“updated Mineral Resource Estimate ("MRE") for the Company's flagship Nevada North Lithium Project has now been filed on SEDAR+ and is available on the Company's website; Surge Battery Metals - NI43-101 Technical Report .”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Independent Qualified Persons Jeff Bickel and Nathan Forsythe are named as having prepared the MRE.

Evidence · text

“The independent QPs were Mr. Jeff Bickel, C.P.G., and Mr. Nathan Forsythe, C.P.G., of RESPEC in Reno, Nevada.”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The announcement concerns the filing of an updated Mineral Resource Estimate technical report.

Evidence · text

“Surge Battery Metals Announces Filing of Updated Mineral Resource Estimate Technical Report”

Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

Resource Estimates (1)

indicatedNevada North Lithium Project · lithiumTonnes: 10510000Grade: 3007Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Nevada North Lithium Project
Commodity
lithium
Region
usa_nv
Reported Region
Nevada
Ticker
NILI

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Jeff Bickel, Nathan Forsythe
Resource group id
resource:600c6630a326a5a07425
Deposit or zone
Nevada North Lithium Project
Ownership percent
70.54 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
10510000
Grade
3007
Grade Unit
ppm
Cutoff Grade
1250
Cutoff Unit
ppm

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-05-15T00:00:00.000Z

Dates

Event date
2026-06-30T00:00:00.000Z

Reasoning: The resource represents a formalization of the May 15 update in a technical report.

Positive factors

  • Pit-constrained resource
  • High grade (3007 ppm Li)

Negative factors

  • Restatement of May 15 release

Evidence · text

“The Project now has a pit-constrained Measured & Indicated Resource containing an estimated 10.51 Mt of Lithium Carbonate Equivalent (LCE) grading 3007 ppm Li at a 1,250-ppm cutoff.”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.