Talon Metals Reports Additional High-Grade Nickel-Copper Assays from the Vault Zone

Original announcement by tmx on

Company
Talon Metals Corp.
Ticker
TLO
Exchange
TSX
Region
Minnesota
Primary commodity
Nickel
Secondary commodities
Copper, Cobalt, Palladium, Platinum, Gold, Silver
Document categories
Drill results
Extracted
2026-09-15 03:12:20 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Talon Metals reports additional high-grade nickel-copper assays from six previously reported drill holes in the Vault Zone of its Tamarack Nickel-Copper-Cobalt Project in central Minnesota. Highlights include 3.13 meters grading 12.05% Ni, 15.05% Cu, 6.15 g/t Pd, 15.72 g/t Pt, 3.14 g/t Au, and 130.08 g/t Ag in hole 25TK0563D. These results confirm and extend mineralization, supporting the geological model of a stacked mineralized system and identifying new exploration targets.

Reasoning: The drill results confirm high-grade nickel-copper-PGE mineralization in the Vault Zone, with several exceptional intercepts, supporting the geological model and indicating potential for further expansion. The identification of a new BHEM anomaly adds exploration upside.

Positive factors

  • Exceptional high-grade nickel and copper intercepts in hole 25TK0563D
  • Confirmation and extension of mineralization continuity in the Vault Zone
  • Identification of a new untested off-hole BHEM anomaly for future drilling
  • Comprehensive QA/QC disclosure and QP sign-off

Negative factors

  • True width of intercepts is not known

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 95

Extracted facts

Stored fact records: 95. Some facts used in scoring do not have a stored record.

Drill Results (95)

25TK0563DTamarack North · nickelGrade: 12.05Grade Unit: %Intercept: 3.13 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
12.05
Grade Unit
%
Intercept
3.13 m
From
757.16 m
To
760.29 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:757.16-760.29
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
24.06
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows an exceptionally high nickel grade over a moderate width, contributing significantly to the overall metal equivalent value and confirming high-grade mineralization in the Vault Zone.

Positive factors

  • Exceptional nickel grade (12.05%) significantly above project average and bonanza threshold for underground mining
  • High NiEq grade (24.06%) indicating strong overall metal value
  • Intercept confirms high-grade mineralization in the Vault Zone

Negative factors

  • True width is unknown

Evidence · table

“12.05”

Context: 3.13

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · copperGrade: 15.05Grade Unit: %Intercept: 3.13 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
15.05
Grade Unit
%
Intercept
3.13 m
From
757.16 m
To
760.29 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:757.16-760.29
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
48.13
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows an exceptionally high copper grade over a moderate width, contributing significantly to the overall metal equivalent value and confirming high-grade mineralization in the Vault Zone.

Positive factors

  • Exceptional copper grade (15.05%) significantly above project average and bonanza threshold for underground mining
  • High CuEq grade (48.13%) indicating strong overall metal value
  • Intercept confirms high-grade mineralization in the Vault Zone

Negative factors

  • True width is unknown

Evidence · table

“15.05”

Context: 3.13

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · cobaltGrade: 0.08Grade Unit: %Intercept: 3.13 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.08
Grade Unit
%
Intercept
3.13 m
From
757.16 m
To
760.29 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:757.16-760.29
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a positive byproduct credit, contributing to the overall value of the high-grade intercept.

Positive factors

  • Cobalt grade (0.08%) is higher than the project average (0.059%) for Tamarack North
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“0.08”

Context: 3.13

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · palladiumGrade: 6.15Grade Unit: g/tIntercept: 3.13 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
6.15
Grade Unit
g/t
Intercept
3.13 m
From
757.16 m
To
760.29 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:757.16-760.29
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The palladium grade is exceptionally high for the project, significantly contributing to the overall metal value of the intercept.

Positive factors

  • Exceptional palladium grade (6.15 g/t) significantly above project average and best grade for Tamarack North
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“6.15”

Context: 3.13

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · platinumGrade: 15.72Grade Unit: g/tIntercept: 3.13 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
15.72
Grade Unit
g/t
Intercept
3.13 m
From
757.16 m
To
760.29 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:757.16-760.29
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The platinum grade is exceptionally high for the project, significantly contributing to the overall metal value of the intercept.

Positive factors

  • Exceptional platinum grade (15.72 g/t) significantly above project average and best grade for Tamarack North
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“15.72”

Context: 3.13

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · goldGrade: 3.14Grade Unit: g/tIntercept: 3.13 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
3.14
Grade Unit
g/t
Intercept
3.13 m
From
757.16 m
To
760.29 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:757.16-760.29
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The gold grade is a positive byproduct credit, though below the project average, it adds to the overall value of the high-grade intercept.

Positive factors

  • Gold grade (3.14 g/t) is moderate for underground mining and contributes to the polymetallic nature of the mineralization

Negative factors

  • Gold grade is below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“3.14”

Context: 3.13

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · silverGrade: 130.08Grade Unit: g/tIntercept: 3.13 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
130.08
Grade Unit
g/t
Intercept
3.13 m
From
757.16 m
To
760.29 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:757.16-760.29
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The silver grade is exceptionally high for the project, significantly contributing to the overall metal value of the intercept.

Positive factors

  • Exceptional silver grade (130.08 g/t) significantly above project average and best grade for Tamarack North
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“130.08”

Context: 3.13

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · nickelGrade: 1.97Grade Unit: %Intercept: 4.12 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.97
Grade Unit
%
Intercept
4.12 m
From
779.54 m
To
783.66 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:779.54-783.66
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
5.24
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a moderate nickel grade, contributing to the overall metal value but below the project average.

Positive factors

  • Nickel grade (1.97%) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Nickel grade is below the project average (7.396%)
  • True width is unknown

Evidence · table

“1.97”

Context: 4.12

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · copperGrade: 3.34Grade Unit: %Intercept: 4.12 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
3.34
Grade Unit
%
Intercept
4.12 m
From
779.54 m
To
783.66 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:779.54-783.66
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
3.59
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a moderate copper grade, contributing to the overall metal value but below the project average.

Positive factors

  • Copper grade (3.34%) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Copper grade is below the project average (10.513%)
  • True width is unknown

Evidence · table

“3.34”

Context: 4.12

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · cobaltGrade: 0.02Grade Unit: %Intercept: 4.12 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.02
Grade Unit
%
Intercept
4.12 m
From
779.54 m
To
783.66 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:779.54-783.66
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Cobalt grade (0.02%) is below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.02”

Context: 4.12

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · palladiumGrade: 2.02Grade Unit: g/tIntercept: 4.12 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.02
Grade Unit
g/t
Intercept
4.12 m
From
779.54 m
To
783.66 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:779.54-783.66
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a moderate palladium grade, contributing to the overall metal value but below the project average.

Positive factors

  • Palladium grade (2.02 g/t) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Palladium grade is below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“2.02”

Context: 4.12

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · platinumGrade: 4.18Grade Unit: g/tIntercept: 4.12 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
4.18
Grade Unit
g/t
Intercept
4.12 m
From
779.54 m
To
783.66 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:779.54-783.66
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a platinum grade above the project average, contributing positively to the overall metal value.

Positive factors

  • Platinum grade (4.18 g/t) is above the project average (3.791 g/t)
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“4.18”

Context: 4.12

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · goldGrade: 1.22Grade Unit: g/tIntercept: 4.12 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.22
Grade Unit
g/t
Intercept
4.12 m
From
779.54 m
To
783.66 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:779.54-783.66
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The gold grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Gold grade (1.22 g/t) is below the project average (4.98 g/t) and moderate for underground mining
  • True width is unknown

Evidence · table

“1.22”

Context: 4.12

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · silverGrade: 5.33Grade Unit: g/tIntercept: 4.12 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
5.33
Grade Unit
g/t
Intercept
4.12 m
From
779.54 m
To
783.66 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:779.54-783.66
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The silver grade is a minor byproduct credit, significantly below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (5.33 g/t) is significantly below the project average (35.322 g/t)
  • True width is unknown

Evidence · table

“5.33”

Context: 4.12

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · nickelGrade: 0.03Grade Unit: %Intercept: 1.25 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.03
Grade Unit
%
Intercept
1.25 m
From
783.66 m
To
784.91 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:783.66-784.91
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low nickel grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Nickel grade (0.03%) is very low and significantly below the project average (7.396%)
  • True width is unknown

Evidence · table

“0.03”

Context: 1.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · copperGrade: 0.12Grade Unit: %Intercept: 1.25 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.12
Grade Unit
%
Intercept
1.25 m
From
783.66 m
To
784.91 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:783.66-784.91
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low copper grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Copper grade (0.12%) is very low and significantly below the project average (10.513%)
  • True width is unknown

Evidence · table

“0.12”

Context: 1.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · cobaltGrade: 0Grade Unit: %Intercept: 1.25 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0
Grade Unit
%
Intercept
1.25 m
From
783.66 m
To
784.91 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:783.66-784.91
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a negligible cobalt grade, indicating no economic significance for this metal in this interval.

Negative factors

  • Cobalt grade (0.00%) is negligible and significantly below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.00”

Context: 1.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · palladiumGrade: 0.18Grade Unit: g/tIntercept: 1.25 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.18
Grade Unit
g/t
Intercept
1.25 m
From
783.66 m
To
784.91 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:783.66-784.91
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low palladium grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Palladium grade (0.18 g/t) is very low and significantly below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“0.18”

Context: 1.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · platinumGrade: 0.86Grade Unit: g/tIntercept: 1.25 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.86
Grade Unit
g/t
Intercept
1.25 m
From
783.66 m
To
784.91 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:783.66-784.91
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low platinum grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Platinum grade (0.86 g/t) is very low and significantly below the project average (3.791 g/t)
  • True width is unknown

Evidence · table

“0.86”

Context: 1.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · goldGrade: 15.15Grade Unit: g/tIntercept: 1.25 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
15.15
Grade Unit
g/t
Intercept
1.25 m
From
783.66 m
To
784.91 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:783.66-784.91
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows an exceptionally high gold grade over a narrow width, contributing positively to the overall metal value.

Positive factors

  • Exceptional gold grade (15.15 g/t) for underground mining, significantly above project average (4.98 g/t)
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“15.15”

Context: 1.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0563DTamarack North · silverGrade: 13.1Grade Unit: g/tIntercept: 1.25 mView all details
Link to this fact

Identity

Hole ID
25TK0563D
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
13.1
Grade Unit
g/t
Intercept
1.25 m
From
783.66 m
To
784.91 m
Hole Depth
913.2 m
Intercept Depth
757.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0563D:783.66-784.91
Mining Method
underground

Location

Location
Vault Zone
Easting
491049.3
Northing
5168348.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.2 °
Dip
-85.5 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The silver grade is a minor byproduct credit, significantly below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (13.10 g/t) is significantly below the project average (35.322 g/t)
  • True width is unknown

Evidence · table

“13.10”

Context: 1.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · nickelGrade: 2.26Grade Unit: %Intercept: 40.67 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.26
Grade Unit
%
Intercept
40.67 m
From
639.9 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
5.86
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a good width with moderate nickel grades, confirming mineralization in the Stringer Zone, though below the project average.

Positive factors

  • Significant intercept length (40.67 m) indicating good continuity
  • Nickel grade (2.26%) is moderate for underground mining
  • Intercept confirms mineralization in the Stringer Zone

Negative factors

  • Nickel grade is below the project average (7.396%)
  • True width is unknown

Evidence · table

“2.26”

Context: 40.67

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · copperGrade: 4.66Grade Unit: %Intercept: 40.67 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
4.66
Grade Unit
%
Intercept
40.67 m
From
639.9 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
10.94
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a good width with moderate copper grades, confirming mineralization in the Stringer Zone, though below the project average.

Positive factors

  • Significant intercept length (40.67 m) indicating good continuity
  • Copper grade (4.66%) is moderate for underground mining
  • Intercept confirms mineralization in the Stringer Zone

Negative factors

  • Copper grade is below the project average (10.513%)
  • True width is unknown

Evidence · table

“4.66”

Context: 40.67

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · cobaltGrade: 0.03Grade Unit: %Intercept: 40.67 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.03
Grade Unit
%
Intercept
40.67 m
From
639.9 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Cobalt grade (0.03%) is below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.03”

Context: 40.67

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · palladiumGrade: 1.26Grade Unit: g/tIntercept: 40.67 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.26
Grade Unit
g/t
Intercept
40.67 m
From
639.9 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a palladium grade below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Palladium grade (1.26 g/t) is below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“1.26”

Context: 40.67

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · platinumGrade: 2.13Grade Unit: g/tIntercept: 40.67 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.13
Grade Unit
g/t
Intercept
40.67 m
From
639.9 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a platinum grade below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Platinum grade (2.13 g/t) is below the project average (3.791 g/t)
  • True width is unknown

Evidence · table

“2.13”

Context: 40.67

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · goldGrade: 1.48Grade Unit: g/tIntercept: 40.67 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.48
Grade Unit
g/t
Intercept
40.67 m
From
639.9 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a gold grade below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Gold grade (1.48 g/t) is below the project average (4.98 g/t) and moderate for underground mining
  • True width is unknown

Evidence · table

“1.48”

Context: 40.67

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · silverGrade: 8.75Grade Unit: g/tIntercept: 40.67 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
8.75
Grade Unit
g/t
Intercept
40.67 m
From
639.9 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The silver grade is a minor byproduct credit, significantly below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (8.75 g/t) is significantly below the project average (35.322 g/t)
  • True width is unknown

Evidence · table

“8.75”

Context: 40.67

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · nickelGrade: 2.17Grade Unit: %Intercept: 2.1 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.17
Grade Unit
%
Intercept
2.1 m
From
639.9 m
To
642 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-642
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
6.75
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate nickel grade, contributing to the overall metal value but below the project average.

Positive factors

  • Nickel grade (2.17%) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Nickel grade is below the project average (7.396%)
  • True width is unknown

Evidence · table

“2.17”

Context: 2.10

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · copperGrade: 4.65Grade Unit: %Intercept: 2.1 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
4.65
Grade Unit
%
Intercept
2.1 m
From
639.9 m
To
642 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-642
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
12.29
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate copper grade, contributing to the overall metal value but below the project average.

Positive factors

  • Copper grade (4.65%) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Copper grade is below the project average (10.513%)
  • True width is unknown

Evidence · table

“4.65”

Context: 2.10

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · cobaltGrade: 0.02Grade Unit: %Intercept: 2.1 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.02
Grade Unit
%
Intercept
2.1 m
From
639.9 m
To
642 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-642
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Cobalt grade (0.02%) is below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.02”

Context: 2.10

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · palladiumGrade: 1.94Grade Unit: g/tIntercept: 2.1 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.94
Grade Unit
g/t
Intercept
2.1 m
From
639.9 m
To
642 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-642
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate palladium grade, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Palladium grade (1.94 g/t) is below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“1.94”

Context: 2.10

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · platinumGrade: 5Grade Unit: g/tIntercept: 2.1 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
5
Grade Unit
g/t
Intercept
2.1 m
From
639.9 m
To
642 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-642
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a strong platinum grade, contributing positively to the overall metal value.

Positive factors

  • Platinum grade (5.00 g/t) is above the project average (3.791 g/t) and strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“5.00”

Context: 2.10

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · goldGrade: 2.37Grade Unit: g/tIntercept: 2.1 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.37
Grade Unit
g/t
Intercept
2.1 m
From
639.9 m
To
642 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-642
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate gold grade, contributing to the overall metal value but below the project average.

Positive factors

  • Gold grade (2.37 g/t) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Gold grade is below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“2.37”

Context: 2.10

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · silverGrade: 34.95Grade Unit: g/tIntercept: 2.1 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
34.95
Grade Unit
g/t
Intercept
2.1 m
From
639.9 m
To
642 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:639.9-642
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate silver grade, contributing to the overall metal value but slightly below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (34.95 g/t) is below the project average (35.322 g/t) but moderate for underground mining
  • True width is unknown

Evidence · table

“34.95”

Context: 2.10

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · nickelGrade: 3.46Grade Unit: %Intercept: 20.19 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
3.46
Grade Unit
%
Intercept
20.19 m
From
645.27 m
To
665.46 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:645.27-665.46
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
9.48
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a good width with moderate nickel grades, contributing to the overall metal value but below the project average.

Positive factors

  • Significant intercept length (20.19 m) indicating good continuity
  • Nickel grade (3.46%) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Nickel grade is below the project average (7.396%)
  • True width is unknown

Evidence · table

“3.46”

Context: 20.19

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · copperGrade: 7.56Grade Unit: %Intercept: 20.19 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
7.56
Grade Unit
%
Intercept
20.19 m
From
645.27 m
To
665.46 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:645.27-665.46
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
17.05
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a good width with strong copper grades, contributing significantly to the overall metal value but below the project average.

Positive factors

  • Significant intercept length (20.19 m) indicating good continuity
  • Copper grade (7.56%) is strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Copper grade is below the project average (10.513%)
  • True width is unknown

Evidence · table

“7.56”

Context: 20.19

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · cobaltGrade: 0.03Grade Unit: %Intercept: 20.19 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.03
Grade Unit
%
Intercept
20.19 m
From
645.27 m
To
665.46 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:645.27-665.46
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Cobalt grade (0.03%) is below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.03”

Context: 20.19

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · palladiumGrade: 2.23Grade Unit: g/tIntercept: 20.19 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.23
Grade Unit
g/t
Intercept
20.19 m
From
645.27 m
To
665.46 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:645.27-665.46
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate palladium grade, contributing to the overall metal value but slightly below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Palladium grade (2.23 g/t) is slightly below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“2.23”

Context: 20.19

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · platinumGrade: 3.58Grade Unit: g/tIntercept: 20.19 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
3.58
Grade Unit
g/t
Intercept
20.19 m
From
645.27 m
To
665.46 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:645.27-665.46
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate platinum grade, contributing to the overall metal value but slightly below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Platinum grade (3.58 g/t) is slightly below the project average (3.791 g/t)
  • True width is unknown

Evidence · table

“3.58”

Context: 20.19

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · goldGrade: 2.66Grade Unit: g/tIntercept: 20.19 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.66
Grade Unit
g/t
Intercept
20.19 m
From
645.27 m
To
665.46 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:645.27-665.46
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate gold grade, contributing to the overall metal value but below the project average.

Positive factors

  • Gold grade (2.66 g/t) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Gold grade is below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“2.66”

Context: 20.19

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · silverGrade: 10.73Grade Unit: g/tIntercept: 20.19 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
10.73
Grade Unit
g/t
Intercept
20.19 m
From
645.27 m
To
665.46 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:645.27-665.46
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a silver grade significantly below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (10.73 g/t) is significantly below the project average (35.322 g/t)
  • True width is unknown

Evidence · table

“10.73”

Context: 20.19

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · nickelGrade: 1.59Grade Unit: %Intercept: 10.75 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.59
Grade Unit
%
Intercept
10.75 m
From
669.82 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:669.82-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
2.98
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate nickel grade, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Nickel grade (1.59%) is below the project average (7.396%) and moderate for underground mining
  • True width is unknown

Evidence · table

“1.59”

Context: 10.75

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · copperGrade: 2.33Grade Unit: %Intercept: 10.75 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.33
Grade Unit
%
Intercept
10.75 m
From
669.82 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:669.82-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
5.57
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a moderate copper grade, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Copper grade (2.33%) is below the project average (10.513%) and moderate for underground mining
  • True width is unknown

Evidence · table

“2.33”

Context: 10.75

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · cobaltGrade: 0.03Grade Unit: %Intercept: 10.75 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.03
Grade Unit
%
Intercept
10.75 m
From
669.82 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:669.82-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Cobalt grade (0.03%) is below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.03”

Context: 10.75

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · palladiumGrade: 0.13Grade Unit: g/tIntercept: 10.75 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.13
Grade Unit
g/t
Intercept
10.75 m
From
669.82 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:669.82-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a very low palladium grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Palladium grade (0.13 g/t) is very low and significantly below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“0.13”

Context: 10.75

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · platinumGrade: 0.14Grade Unit: g/tIntercept: 10.75 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.14
Grade Unit
g/t
Intercept
10.75 m
From
669.82 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:669.82-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a very low platinum grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Platinum grade (0.14 g/t) is very low and significantly below the project average (3.791 g/t)
  • True width is unknown

Evidence · table

“0.14”

Context: 10.75

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · goldGrade: 0.07Grade Unit: g/tIntercept: 10.75 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.07
Grade Unit
g/t
Intercept
10.75 m
From
669.82 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:669.82-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a very low gold grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Gold grade (0.07 g/t) is very low and significantly below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“0.07”

Context: 10.75

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0567Tamarack North · silverGrade: 5.21Grade Unit: g/tIntercept: 10.75 mView all details
Link to this fact

Identity

Hole ID
25TK0567
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
5.21
Grade Unit
g/t
Intercept
10.75 m
From
669.82 m
To
680.57 m
Hole Depth
919.3 m
Intercept Depth
639.9 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0567:669.82-680.57
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.3
Northing
5168292
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
86 °
Dip
-87.6 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a very low silver grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Silver grade (5.21 g/t) is very low and significantly below the project average (35.322 g/t)
  • True width is unknown

Evidence · table

“5.21”

Context: 10.75

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568Tamarack North · nickelGrade: 2.77Grade Unit: %Intercept: 20.32 mView all details
Link to this fact

Identity

Hole ID
25TK0568
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.77
Grade Unit
%
Intercept
20.32 m
From
611.57 m
To
631.89 m
Hole Depth
866.2 m
Intercept Depth
611.57 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568:611.57-631.89
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.9 °
Dip
-80.4 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
7.51
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a good width with moderate nickel grades, supporting the geological model, though below the project average.

Positive factors

  • Significant intercept length (20.32 m) indicating good continuity
  • Nickel grade (2.77%) is moderate for underground mining
  • Intercept supports the interpretation of a stacked mineralized system

Negative factors

  • Nickel grade is below the project average (7.396%)
  • True width is unknown

Evidence · table

“2.77”

Context: 20.32

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568Tamarack North · copperGrade: 5.86Grade Unit: %Intercept: 20.32 mView all details
Link to this fact

Identity

Hole ID
25TK0568
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
5.86
Grade Unit
%
Intercept
20.32 m
From
611.57 m
To
631.89 m
Hole Depth
866.2 m
Intercept Depth
611.57 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568:611.57-631.89
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.9 °
Dip
-80.4 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
13.62
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a good width with strong copper grades, supporting the geological model, though below the project average.

Positive factors

  • Significant intercept length (20.32 m) indicating good continuity
  • Copper grade (5.86%) is strong for underground mining
  • Intercept supports the interpretation of a stacked mineralized system

Negative factors

  • Copper grade is below the project average (10.513%)
  • True width is unknown

Evidence · table

“5.86”

Context: 20.32

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568Tamarack North · cobaltGrade: 0.03Grade Unit: %Intercept: 20.32 mView all details
Link to this fact

Identity

Hole ID
25TK0568
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.03
Grade Unit
%
Intercept
20.32 m
From
611.57 m
To
631.89 m
Hole Depth
866.2 m
Intercept Depth
611.57 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568:611.57-631.89
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.9 °
Dip
-80.4 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Cobalt grade (0.03%) is below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.03”

Context: 20.32

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568Tamarack North · palladiumGrade: 1.53Grade Unit: g/tIntercept: 20.32 mView all details
Link to this fact

Identity

Hole ID
25TK0568
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.53
Grade Unit
g/t
Intercept
20.32 m
From
611.57 m
To
631.89 m
Hole Depth
866.2 m
Intercept Depth
611.57 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568:611.57-631.89
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.9 °
Dip
-80.4 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a palladium grade below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Palladium grade (1.53 g/t) is below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“1.53”

Context: 20.32

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568Tamarack North · platinumGrade: 2.5Grade Unit: g/tIntercept: 20.32 mView all details
Link to this fact

Identity

Hole ID
25TK0568
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.5
Grade Unit
g/t
Intercept
20.32 m
From
611.57 m
To
631.89 m
Hole Depth
866.2 m
Intercept Depth
611.57 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568:611.57-631.89
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.9 °
Dip
-80.4 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a platinum grade below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Platinum grade (2.50 g/t) is below the project average (3.791 g/t)
  • True width is unknown

Evidence · table

“2.50”

Context: 20.32

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568Tamarack North · goldGrade: 2.41Grade Unit: g/tIntercept: 20.32 mView all details
Link to this fact

Identity

Hole ID
25TK0568
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.41
Grade Unit
g/t
Intercept
20.32 m
From
611.57 m
To
631.89 m
Hole Depth
866.2 m
Intercept Depth
611.57 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568:611.57-631.89
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.9 °
Dip
-80.4 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a moderate gold grade, contributing to the overall metal value but below the project average.

Positive factors

  • Gold grade (2.41 g/t) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Gold grade is below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“2.41”

Context: 20.32

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568Tamarack North · silverGrade: 22.03Grade Unit: g/tIntercept: 20.32 mView all details
Link to this fact

Identity

Hole ID
25TK0568
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
22.03
Grade Unit
g/t
Intercept
20.32 m
From
611.57 m
To
631.89 m
Hole Depth
866.2 m
Intercept Depth
611.57 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568:611.57-631.89
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.9 °
Dip
-80.4 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a moderate silver grade, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (22.03 g/t) is below the project average (35.322 g/t) but moderate for underground mining
  • True width is unknown

Evidence · table

“22.03”

Context: 20.32

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · nickelGrade: 0.35Grade Unit: %Intercept: 7.92 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.35
Grade Unit
%
Intercept
7.92 m
From
621.08 m
To
629 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:621.08-629
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
1.63
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low nickel grade, indicating minimal economic significance for this metal in this interval.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Nickel grade (0.35%) is very low and significantly below the project average (7.396%)
  • True width is unknown

Evidence · table

“0.35”

Context: 7.92

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · copperGrade: 1.42Grade Unit: %Intercept: 7.92 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.42
Grade Unit
%
Intercept
7.92 m
From
621.08 m
To
629 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:621.08-629
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
2.47
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low copper grade, indicating minimal economic significance for this metal in this interval.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Copper grade (1.42%) is very low and significantly below the project average (10.513%)
  • True width is unknown

Evidence · table

“1.42”

Context: 7.92

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · cobaltGrade: 0.01Grade Unit: %Intercept: 7.92 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.01
Grade Unit
%
Intercept
7.92 m
From
621.08 m
To
629 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:621.08-629
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low cobalt grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Cobalt grade (0.01%) is very low and significantly below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.01”

Context: 7.92

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · palladiumGrade: 0.33Grade Unit: g/tIntercept: 7.92 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.33
Grade Unit
g/t
Intercept
7.92 m
From
621.08 m
To
629 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:621.08-629
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low palladium grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Palladium grade (0.33 g/t) is very low and significantly below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“0.33”

Context: 7.92

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · platinumGrade: 0.45Grade Unit: g/tIntercept: 7.92 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.45
Grade Unit
g/t
Intercept
7.92 m
From
621.08 m
To
629 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:621.08-629
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low platinum grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Platinum grade (0.45 g/t) is very low and significantly below the project average (3.791 g/t)
  • True width is unknown

Evidence · table

“0.45”

Context: 7.92

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · goldGrade: 0.11Grade Unit: g/tIntercept: 7.92 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.11
Grade Unit
g/t
Intercept
7.92 m
From
621.08 m
To
629 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:621.08-629
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low gold grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Gold grade (0.11 g/t) is very low and significantly below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“0.11”

Context: 7.92

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · silverGrade: 29.88Grade Unit: g/tIntercept: 7.92 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
29.88
Grade Unit
g/t
Intercept
7.92 m
From
621.08 m
To
629 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:621.08-629
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a moderate silver grade, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (29.88 g/t) is below the project average (35.322 g/t) but moderate for underground mining
  • True width is unknown

Evidence · table

“29.88”

Context: 7.92

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · nickelGrade: 1.96Grade Unit: %Intercept: 4.25 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.96
Grade Unit
%
Intercept
4.25 m
From
638.04 m
To
642.29 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:638.04-642.29
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
4.38
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a moderate nickel grade, contributing to the overall metal value but below the project average.

Positive factors

  • Nickel grade (1.96%) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Nickel grade is below the project average (7.396%)
  • True width is unknown

Evidence · table

“1.96”

Context: 4.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · copperGrade: 3.79Grade Unit: %Intercept: 4.25 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
3.79
Grade Unit
%
Intercept
4.25 m
From
638.04 m
To
642.29 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:638.04-642.29
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
8.03
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a moderate copper grade, contributing to the overall metal value but below the project average.

Positive factors

  • Copper grade (3.79%) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Copper grade is below the project average (10.513%)
  • True width is unknown

Evidence · table

“3.79”

Context: 4.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · cobaltGrade: 0.02Grade Unit: %Intercept: 4.25 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.02
Grade Unit
%
Intercept
4.25 m
From
638.04 m
To
642.29 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:638.04-642.29
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Cobalt grade (0.02%) is below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.02”

Context: 4.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · palladiumGrade: 0.61Grade Unit: g/tIntercept: 4.25 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.61
Grade Unit
g/t
Intercept
4.25 m
From
638.04 m
To
642.29 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:638.04-642.29
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a palladium grade below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Palladium grade (0.61 g/t) is below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“0.61”

Context: 4.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · platinumGrade: 0.51Grade Unit: g/tIntercept: 4.25 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.51
Grade Unit
g/t
Intercept
4.25 m
From
638.04 m
To
642.29 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:638.04-642.29
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low platinum grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Platinum grade (0.51 g/t) is very low and significantly below the project average (3.791 g/t)
  • True width is unknown

Evidence · table

“0.51”

Context: 4.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · goldGrade: 0.34Grade Unit: g/tIntercept: 4.25 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.34
Grade Unit
g/t
Intercept
4.25 m
From
638.04 m
To
642.29 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:638.04-642.29
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low gold grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Gold grade (0.34 g/t) is very low and significantly below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“0.34”

Context: 4.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · silverGrade: 8.5Grade Unit: g/tIntercept: 4.25 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
8.5
Grade Unit
g/t
Intercept
4.25 m
From
638.04 m
To
642.29 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:638.04-642.29
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a very low silver grade, indicating minimal economic significance for this metal in this interval.

Negative factors

  • Silver grade (8.50 g/t) is very low and significantly below the project average (35.322 g/t)
  • True width is unknown

Evidence · table

“8.50”

Context: 4.25

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · nickelGrade: 9.47Grade Unit: %Intercept: 8.88 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
9.47
Grade Unit
%
Intercept
8.88 m
From
733.15 m
To
742.03 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:733.15-742.03
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
18.62
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a high nickel grade over a good width, significantly contributing to the overall metal equivalent value and supporting continuity at depth.

Positive factors

  • High nickel grade (9.47%) above project average (7.396%) and strong for underground mining
  • High NiEq grade (18.62%) indicating strong overall metal value
  • Intercept supports continuity of mineralization at depth

Negative factors

  • True width is unknown

Evidence · table

“9.47”

Context: 8.88

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · copperGrade: 14.37Grade Unit: %Intercept: 8.88 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
14.37
Grade Unit
%
Intercept
8.88 m
From
733.15 m
To
742.03 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:733.15-742.03
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
36.72
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a high copper grade over a good width, significantly contributing to the overall metal equivalent value and supporting continuity at depth.

Positive factors

  • High copper grade (14.37%) above project average (10.513%) and exceptional for underground mining
  • High CuEq grade (36.72%) indicating strong overall metal value
  • Intercept supports continuity of mineralization at depth

Negative factors

  • True width is unknown

Evidence · table

“14.37”

Context: 8.88

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · cobaltGrade: 0.12Grade Unit: %Intercept: 8.88 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.12
Grade Unit
%
Intercept
8.88 m
From
733.15 m
To
742.03 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:733.15-742.03
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is significantly above the project average, providing a strong byproduct credit to the high-grade intercept.

Positive factors

  • Cobalt grade (0.12%) is significantly above the project average (0.059%) and strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“0.12”

Context: 8.88

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · palladiumGrade: 2.44Grade Unit: g/tIntercept: 8.88 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.44
Grade Unit
g/t
Intercept
8.88 m
From
733.15 m
To
742.03 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:733.15-742.03
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The palladium grade is above the project average, providing a positive byproduct credit to the high-grade intercept.

Positive factors

  • Palladium grade (2.44 g/t) is above the project average (2.322 g/t) and strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“2.44”

Context: 8.88

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · platinumGrade: 3Grade Unit: g/tIntercept: 8.88 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
3
Grade Unit
g/t
Intercept
8.88 m
From
733.15 m
To
742.03 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:733.15-742.03
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The platinum grade is moderate for underground mining, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Platinum grade (3.00 g/t) is below the project average (3.791 g/t) but moderate for underground mining
  • True width is unknown

Evidence · table

“3.00”

Context: 8.88

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · goldGrade: 2.86Grade Unit: g/tIntercept: 8.88 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.86
Grade Unit
g/t
Intercept
8.88 m
From
733.15 m
To
742.03 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:733.15-742.03
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The gold grade is moderate for underground mining, contributing to the overall metal value but below the project average.

Positive factors

  • Gold grade (2.86 g/t) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Gold grade is below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“2.86”

Context: 8.88

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0568ATamarack North · silverGrade: 37.41Grade Unit: g/tIntercept: 8.88 mView all details
Link to this fact

Identity

Hole ID
25TK0568A
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
37.41
Grade Unit
g/t
Intercept
8.88 m
From
733.15 m
To
742.03 m
Hole Depth
948.5 m
Intercept Depth
621.08 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0568A:733.15-742.03
Mining Method
underground

Location

Location
Vault Zone
Easting
490992.5
Northing
5168401.9
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
168.5 °
Dip
-80.3 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The silver grade is above the project average, providing a positive byproduct credit to the high-grade intercept.

Positive factors

  • Silver grade (37.41 g/t) is above the project average (35.322 g/t) and strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“37.41”

Context: 8.88

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569Tamarack North · nickelGrade: 4.67Grade Unit: %Intercept: 18.9 mView all details
Link to this fact

Identity

Hole ID
25TK0569
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
4.67
Grade Unit
%
Intercept
18.9 m
From
640.85 m
To
659.75 m
Hole Depth
906.2 m
Intercept Depth
640.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569:640.85-659.75
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
12.23
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a good width with moderate nickel grades, confirming mineralization in the Stringer Zone, though below the project average.

Positive factors

  • Significant intercept length (18.90 m) indicating good continuity
  • Nickel grade (4.67%) is moderate for underground mining
  • Intercept confirms mineralization in the Stringer Zone

Negative factors

  • Nickel grade is below the project average (7.396%)
  • True width is unknown

Evidence · table

“4.67”

Context: 18.90

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569Tamarack North · copperGrade: 9.84Grade Unit: %Intercept: 18.9 mView all details
Link to this fact

Identity

Hole ID
25TK0569
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
9.84
Grade Unit
%
Intercept
18.9 m
From
640.85 m
To
659.75 m
Hole Depth
906.2 m
Intercept Depth
640.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569:640.85-659.75
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
22.3
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a good width with strong copper grades, confirming mineralization in the Stringer Zone, though slightly below the project average.

Positive factors

  • Significant intercept length (18.90 m) indicating good continuity
  • Copper grade (9.84%) is strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Copper grade is below the project average (10.513%)
  • True width is unknown

Evidence · table

“9.84”

Context: 18.90

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569Tamarack North · cobaltGrade: 0.05Grade Unit: %Intercept: 18.9 mView all details
Link to this fact

Identity

Hole ID
25TK0569
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.05
Grade Unit
%
Intercept
18.9 m
From
640.85 m
To
659.75 m
Hole Depth
906.2 m
Intercept Depth
640.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569:640.85-659.75
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is a minor byproduct credit, below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Cobalt grade (0.05%) is below the project average (0.059%)
  • True width is unknown

Evidence · table

“0.05”

Context: 18.90

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569Tamarack North · palladiumGrade: 2.66Grade Unit: g/tIntercept: 18.9 mView all details
Link to this fact

Identity

Hole ID
25TK0569
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.66
Grade Unit
g/t
Intercept
18.9 m
From
640.85 m
To
659.75 m
Hole Depth
906.2 m
Intercept Depth
640.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569:640.85-659.75
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The palladium grade is above the project average, providing a positive byproduct credit to the intercept.

Positive factors

  • Palladium grade (2.66 g/t) is above the project average (2.322 g/t) and strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“2.66”

Context: 18.90

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569Tamarack North · platinumGrade: 4.26Grade Unit: g/tIntercept: 18.9 mView all details
Link to this fact

Identity

Hole ID
25TK0569
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
4.26
Grade Unit
g/t
Intercept
18.9 m
From
640.85 m
To
659.75 m
Hole Depth
906.2 m
Intercept Depth
640.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569:640.85-659.75
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The platinum grade is above the project average, providing a positive byproduct credit to the intercept.

Positive factors

  • Platinum grade (4.26 g/t) is above the project average (3.791 g/t) and strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“4.26”

Context: 18.90

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569Tamarack North · goldGrade: 3.24Grade Unit: g/tIntercept: 18.9 mView all details
Link to this fact

Identity

Hole ID
25TK0569
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
3.24
Grade Unit
g/t
Intercept
18.9 m
From
640.85 m
To
659.75 m
Hole Depth
906.2 m
Intercept Depth
640.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569:640.85-659.75
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The gold grade is moderate for underground mining, contributing to the overall metal value but below the project average.

Positive factors

  • Gold grade (3.24 g/t) is moderate for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Gold grade is below the project average (4.98 g/t)
  • True width is unknown

Evidence · table

“3.24”

Context: 18.90

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569Tamarack North · silverGrade: 15.17Grade Unit: g/tIntercept: 18.9 mView all details
Link to this fact

Identity

Hole ID
25TK0569
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
15.17
Grade Unit
g/t
Intercept
18.9 m
From
640.85 m
To
659.75 m
Hole Depth
906.2 m
Intercept Depth
640.85 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569:640.85-659.75
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The silver grade is moderate for underground mining, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (15.17 g/t) is below the project average (35.322 g/t) but moderate for underground mining
  • True width is unknown

Evidence · table

“15.17”

Context: 18.90

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · nickelGrade: 4.14Grade Unit: %Intercept: 16.07 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
4.14
Grade Unit
%
Intercept
16.07 m
From
766.16 m
To
782.23 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:766.16-782.23
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
10.43
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a good width with moderate nickel grades, supporting potential expansion, though below the project average.

Positive factors

  • Significant intercept length (16.07 m) indicating good continuity
  • Nickel grade (4.14%) is moderate for underground mining
  • Intercept supports potential expansion of mineralization

Negative factors

  • Nickel grade is below the project average (7.396%)
  • True width is unknown

Evidence · table

“4.14”

Context: 16.07

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · copperGrade: 9.46Grade Unit: %Intercept: 16.07 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
9.46
Grade Unit
%
Intercept
16.07 m
From
766.16 m
To
782.23 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:766.16-782.23
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
18.84
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a good width with strong copper grades, supporting potential expansion, though below the project average.

Positive factors

  • Significant intercept length (16.07 m) indicating good continuity
  • Copper grade (9.46%) is strong for underground mining
  • Intercept supports potential expansion of mineralization

Negative factors

  • Copper grade is below the project average (10.513%)
  • True width is unknown

Evidence · table

“9.46”

Context: 16.07

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · cobaltGrade: 0.06Grade Unit: %Intercept: 16.07 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.06
Grade Unit
%
Intercept
16.07 m
From
766.16 m
To
782.23 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:766.16-782.23
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is above the project average, providing a positive byproduct credit to the intercept.

Positive factors

  • Cobalt grade (0.06%) is above the project average (0.059%)
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“0.06”

Context: 16.07

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · palladiumGrade: 1.23Grade Unit: g/tIntercept: 16.07 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.23
Grade Unit
g/t
Intercept
16.07 m
From
766.16 m
To
782.23 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:766.16-782.23
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a palladium grade below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Palladium grade (1.23 g/t) is below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“1.23”

Context: 16.07

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · platinumGrade: 1.64Grade Unit: g/tIntercept: 16.07 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
platinum
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.64
Grade Unit
g/t
Intercept
16.07 m
From
766.16 m
To
782.23 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:766.16-782.23
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This intercept shows a platinum grade below the project average, contributing to the overall metal value.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Platinum grade (1.64 g/t) is below the project average (3.791 g/t)
  • True width is unknown

Evidence · table

“1.64”

Context: 16.07

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · goldGrade: 1.47Grade Unit: g/tIntercept: 16.07 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
gold
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
1.47
Grade Unit
g/t
Intercept
16.07 m
From
766.16 m
To
782.23 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:766.16-782.23
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The gold grade is moderate for underground mining, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Gold grade (1.47 g/t) is below the project average (4.98 g/t) and moderate for underground mining
  • True width is unknown

Evidence · table

“1.47”

Context: 16.07

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · silverGrade: 21.86Grade Unit: g/tIntercept: 16.07 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
silver
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
21.86
Grade Unit
g/t
Intercept
16.07 m
From
766.16 m
To
782.23 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:766.16-782.23
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The silver grade is moderate for underground mining, contributing to the overall metal value but below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Silver grade (21.86 g/t) is below the project average (35.322 g/t) but moderate for underground mining
  • True width is unknown

Evidence · table

“21.86”

Context: 16.07

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · nickelGrade: 8.84Grade Unit: %Intercept: 4.95 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
nickel
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
8.84
Grade Unit
%
Intercept
4.95 m
From
772.68 m
To
777.63 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:772.68-777.63
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
18.81
Metal Eq. Unit
% NiEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a high nickel grade over a good width, significantly contributing to the overall metal equivalent value and supporting potential expansion.

Positive factors

  • High nickel grade (8.84%) above project average (7.396%) and strong for underground mining
  • High NiEq grade (18.81%) indicating strong overall metal value
  • Intercept supports potential expansion of mineralization

Negative factors

  • True width is unknown

Evidence · table

“8.84”

Context: 4.95

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · copperGrade: 16.72Grade Unit: %Intercept: 4.95 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
copper
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
16.72
Grade Unit
%
Intercept
4.95 m
From
772.68 m
To
777.63 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:772.68-777.63
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Metal Eq. Grade
36.75
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: This sub-interval shows a high copper grade over a good width, significantly contributing to the overall metal equivalent value and supporting potential expansion.

Positive factors

  • High copper grade (16.72%) above project average (10.513%) and exceptional for underground mining
  • High CuEq grade (36.75%) indicating strong overall metal value
  • Intercept supports potential expansion of mineralization

Negative factors

  • True width is unknown

Evidence · table

“16.72”

Context: 4.95

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · cobaltGrade: 0.13Grade Unit: %Intercept: 4.95 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
cobalt
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
0.13
Grade Unit
%
Intercept
4.95 m
From
772.68 m
To
777.63 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:772.68-777.63
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The cobalt grade is significantly above the project average, providing a strong byproduct credit to the high-grade intercept.

Positive factors

  • Cobalt grade (0.13%) is significantly above the project average (0.059%) and strong for underground mining
  • Adds to the polymetallic nature of the mineralization

Negative factors

  • True width is unknown

Evidence · table

“0.13”

Context: 4.95

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

25TK0569ATamarack North · palladiumGrade: 2.21Grade Unit: g/tIntercept: 4.95 mView all details
Link to this fact

Identity

Hole ID
25TK0569A
Project
Tamarack North
Commodity
palladium
Region
minnesota
Reported Region
minnesota
Ticker
TLO

Geometry

Grade
2.21
Grade Unit
g/t
Intercept
4.95 m
From
772.68 m
To
777.63 m
Hole Depth
852.5 m
Intercept Depth
766.16 m

Classification

Program
exploration
Sample Type
drill
Group ID
25TK0569A:772.68-777.63
Mining Method
underground

Location

Location
Vault Zone
Easting
490998.2
Northing
5168292.3
CRS
UTM Zone 15N, NAD83
Elevation
388 m
Azimuth
71 °
Dip
-86.2 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Minerals
QA/QC Disclosed
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-19T00:00:00.000Z

Reasoning: The palladium grade is moderate for underground mining, contributing to the overall metal value but slightly below the project average.

Positive factors

  • Adds to the polymetallic nature of the mineralization

Negative factors

  • Palladium grade (2.21 g/t) is slightly below the project average (2.322 g/t)
  • True width is unknown

Evidence · table

“2.21”

Context: 4.95

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Tamarack Nickel-Copper-Cobalt Project comprises a large land position (18km of strike length) with additional high-g"

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.