Thor Explorations Announces High-Grade Exploration Results Confirm Expanding Gold Footprint at the Douta Project, Senegal

Original announcement by tmx on

Company
Thor Explorations Ltd.
Ticker
THX
Exchange
TSX
Region
Senegal
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Drill results
Extracted
2026-09-15 02:52:39 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Thor Explorations announced encouraging initial drill results from its 2026 program at the Douta Project in Senegal, confirming an expanding gold footprint. Highlights include high-grade intercepts up to 16.99 g/t Au over 4m at the Bousankhoba Prospect, alongside extensions to mineralization at Makosa Tail and infill drilling at Baraka 3 aimed at resource upgrades. The program successfully identified new oxide mineralization and extended known zones, supporting the project's economic potential.

Reasoning: The announcement reports the first set of 2026 drill results, including high-grade discoveries at Bousankhoba and extensions at Makosa Tail, which are positive for expanding the project's gold footprint and improving economics. While some intercepts are lower grade or narrow, the overall program objectives of resource upgrade and new discovery are being met with good confidence in the data.

Positive factors

  • High-grade intercepts, particularly at Bousankhoba, including 16.99 g/t Au over 4m.
  • Discovery of new oxide mineralization at Bousankhoba Prospect.
  • Extension of strike length at Makosa Tail, expanding known mineralization.
  • Drilling within inferred areas at Baraka 3 to upgrade resource classification.
  • Comprehensive QA/QC disclosure with named laboratory and Qualified Person sign-off.
  • True width estimates provided for all reported intercepts.

Negative factors

  • Many intercepts are narrow and/or low grade for orogenic gold deposits.
  • Some true widths are below the 3m tolerance for orogenic gold, suggesting potentially limited economic width for those specific intercepts.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 57

Classification and evidence

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: The document consistently provides 'True Width (m)' for all reported drill intercepts in the tables.

Evidence · text

“True Width (m)”

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: The release mentions that drill samples were analysed by ALS Laboratories using the AA26 fire assay method and that a Qualified Person reviewed QA/QC, sampling, analytical and test data.

Evidence · text

“Drill samples were analysed by ALS Laboratories in Mali using the AA26 fire assay method (50 gramme charge).”

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: The tables explicitly state the compositing parameters: '0.5 g/t Au lower cut off; minimum width 2m with 2m max internal waste'.

Evidence · text

“0.5 g/t Au lower cut off; minimum width 2m with 2m max internal waste”

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: Drilling at Makosa Tail has successfully extended the strike length of previously defined mineralisation, and new oxide mineralisation was intersected at Bousankhoba.

Evidence · text

“At Makosa Tail, drilling has successfully extended the strike length of the previously defined mineralisation, and in the Bousankhoba licence, drilling has successfully intersected new oxide mineralisation.”

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The drilling program is designed to upgrade the classification of inferred mineralisation and has intersected mineralisation in currently inferred areas within and below designed pit shells.

Evidence · text

“The ongoing 40,000 metre drilling program has been designed to upgrade the classification of inferred mineralisation that currently lies within the pit shells, and to test several previously delineated oxide targets in the Douta, Douta-West and Bousankohba licences.”

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: Hole BSAC045 returned 4m at 16.99 g/t Au, which is an exceptional grade for an orogenic gold deposit.

Evidence · table

“16.99”

Context: 4

Extracted facts

Stored fact records: 57. Some facts used in scoring do not have a stored record.

Drill Results (57)

DWDD003Douta West · goldGrade: 2.91Grade Unit: g/tIntercept: 5.5 mView all details
Link to this fact

Identity

Hole ID
DWDD003
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
2.91
Grade Unit
g/t
Intercept
5.5 m
True Width
2.9 m
From
185 m
To
190 m
Hole Depth
210 m
Intercept Depth
185 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWDD003:185-190
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159834
Northing
1410589
Elevation
135 m
Azimuth
134 °
Dip
-75 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A weak grade intercept with a narrow true width, but contributes to the overall understanding of the Baraka 3 deposit.

Positive factors

  • True width disclosed (2.9m).

Negative factors

  • Grade (2.91 g/t Au) is weak for an orogenic gold deposit.
  • True width (2.9m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“2.91”

Context: 5.5

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.9

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWDD004Douta West · goldGrade: 1.38Grade Unit: g/tIntercept: 3.5 mView all details
Link to this fact

Identity

Hole ID
DWDD004
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.38
Grade Unit
g/t
Intercept
3.5 m
True Width
1.9 m
From
88 m
To
92 m
Hole Depth
120 m
Intercept Depth
88 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWDD004:88-92
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159878
Northing
1410745
Elevation
139 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade intercept with a narrow true width, contributing to the overall geological model but not highly material on its own.

Positive factors

  • True width disclosed (1.9m).

Negative factors

  • Grade (1.38 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.9m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.38”

Context: 3.5

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.9

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWDD004Douta West · goldGrade: 1.39Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
DWDD004
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.39
Grade Unit
g/t
Intercept
6 m
True Width
3.2 m
From
101 m
To
107 m
Hole Depth
120 m
Intercept Depth
88 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWDD004:101-107
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159878
Northing
1410745
Elevation
139 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade intercept with a narrow true width, contributing to the overall geological model but not highly material on its own.

Positive factors

  • True width disclosed (3.2m).

Negative factors

  • Grade (1.39 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“1.39”

Context: 6.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWDD005Douta West · goldGrade: 1.91Grade Unit: g/tIntercept: 6.8 mView all details
Link to this fact

Identity

Hole ID
DWDD005
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.91
Grade Unit
g/t
Intercept
6.8 m
True Width
3.6 m
From
17 m
To
24 m
Hole Depth
33 m
Intercept Depth
17 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWDD005:17-24
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159918
Northing
1410840
Elevation
141 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade intercept with a narrow true width, contributing to the overall geological model but not highly material on its own.

Positive factors

  • True width disclosed (3.6m).

Negative factors

  • Grade (1.91 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“1.91”

Context: 6.8

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWDD005Douta West · goldGrade: 1.15Grade Unit: g/tIntercept: 3.5 mView all details
Link to this fact

Identity

Hole ID
DWDD005
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.15
Grade Unit
g/t
Intercept
3.5 m
True Width
1.9 m
From
25 m
To
29 m
Hole Depth
33 m
Intercept Depth
17 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWDD005:25-29
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159918
Northing
1410840
Elevation
141 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade intercept with a narrow true width, contributing to the overall geological model but not highly material on its own.

Positive factors

  • True width disclosed (1.9m).

Negative factors

  • Grade (1.15 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.9m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.15”

Context: 3.5

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.9

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC453Douta West · goldGrade: 4.28Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
DWRC453
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
4.28
Grade Unit
g/t
Intercept
7 m
True Width
3.7 m
From
122 m
To
129 m
Hole Depth
153 m
Intercept Depth
122 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC453:122-129
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159864
Northing
1410760
Elevation
139 m
Azimuth
130 °
Dip
-70 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A moderate grade intercept with a reasonable true width, contributing positively to the Baraka 3 resource.

Positive factors

  • Grade (4.28 g/t Au) is moderate for an orogenic gold deposit.
  • True width disclosed (3.7m).

Evidence · table

“4.28”

Context: 7.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.7

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC484Douta West · goldGrade: 0.9Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC484
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.9
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
19 m
To
21 m
Hole Depth
50 m
Intercept Depth
19 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC484:19-21
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159913
Northing
1410847
Elevation
141 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.90 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.90”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC484Douta West · goldGrade: 1.17Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DWRC484
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.17
Grade Unit
g/t
Intercept
3 m
True Width
1.6 m
From
23 m
To
26 m
Hole Depth
50 m
Intercept Depth
19 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC484:23-26
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159913
Northing
1410847
Elevation
141 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.6m).

Negative factors

  • Grade (1.17 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.17”

Context: 3.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC484Douta West · goldGrade: 0.87Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
DWRC484
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.87
Grade Unit
g/t
Intercept
7 m
True Width
3.7 m
From
30 m
To
37 m
Hole Depth
50 m
Intercept Depth
19 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC484:30-37
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159913
Northing
1410847
Elevation
141 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade intercept with a narrow true width, contributing to the overall geological model but not highly material on its own.

Positive factors

  • True width disclosed (3.7m).

Negative factors

  • Grade (0.87 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“0.87”

Context: 7.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.7

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC489Douta West · goldGrade: 0.67Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC489
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.67
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
5 m
To
7 m
Hole Depth
50 m
Intercept Depth
5 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC489:5-7
Mining Method
open_pit

Location

Location
Baraka 3
Easting
162731
Northing
1415309
Elevation
172 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.67 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.67”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC496Douta West · goldGrade: 1.92Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC496
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.92
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
10 m
To
12 m
Hole Depth
50 m
Intercept Depth
10 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC496:10-12
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159940
Northing
1410933
Elevation
143 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (1.92 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.92”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC497Douta West · goldGrade: 1.14Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
DWRC497
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.14
Grade Unit
g/t
Intercept
5 m
True Width
2.7 m
From
40 m
To
45 m
Hole Depth
84 m
Intercept Depth
40 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC497:40-45
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159919
Northing
1410946
Elevation
142 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.7m).

Negative factors

  • Grade (1.14 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.7m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.14”

Context: 5.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.7

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC499Douta West · goldGrade: 1.17Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
DWRC499
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.17
Grade Unit
g/t
Intercept
5 m
True Width
2.7 m
From
21 m
To
26 m
Hole Depth
60 m
Intercept Depth
21 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC499:21-26
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159960
Northing
1411038
Elevation
145 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.7m).

Negative factors

  • Grade (1.17 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.7m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.17”

Context: 5.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.7

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC499Douta West · goldGrade: 0.61Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
DWRC499
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.61
Grade Unit
g/t
Intercept
4 m
True Width
2.1 m
From
32 m
To
36 m
Hole Depth
60 m
Intercept Depth
21 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC499:32-36
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159960
Northing
1411038
Elevation
145 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.1m).

Negative factors

  • Grade (0.61 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.61”

Context: 4.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC499Douta West · goldGrade: 0.83Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC499
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.83
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
50 m
To
52 m
Hole Depth
60 m
Intercept Depth
21 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC499:50-52
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159960
Northing
1411038
Elevation
145 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.83 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.83”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC500Douta West · goldGrade: 1.64Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DWRC500
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.64
Grade Unit
g/t
Intercept
3 m
True Width
1.6 m
From
70 m
To
73 m
Hole Depth
96 m
Intercept Depth
70 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC500:70-73
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159936
Northing
1411054
Elevation
146 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.6m).

Negative factors

  • Grade (1.64 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.64”

Context: 3.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC503Douta West · goldGrade: 1.07Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
DWRC503
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.07
Grade Unit
g/t
Intercept
4 m
True Width
2.1 m
From
26 m
To
30 m
Hole Depth
45 m
Intercept Depth
26 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC503:26-30
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160162
Northing
1412413
Elevation
182 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.1m).

Negative factors

  • Grade (1.07 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.07”

Context: 4.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC520Douta West · goldGrade: 0.84Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC520
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.84
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
51 m
To
53 m
Hole Depth
114 m
Intercept Depth
51 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC520:51-53
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160054
Northing
1412669
Elevation
187 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.84 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.84”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC522Douta West · goldGrade: 0.74Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC522
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.74
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
42 m
To
44 m
Hole Depth
114 m
Intercept Depth
42 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC522:42-44
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159984
Northing
1412590
Elevation
192 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.74 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.74”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC522Douta West · goldGrade: 0.68Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC522
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.68
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
85 m
To
87 m
Hole Depth
114 m
Intercept Depth
42 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC522:85-87
Mining Method
open_pit

Location

Location
Baraka 3
Easting
159984
Northing
1412590
Elevation
192 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.68 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.68”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC523Douta West · goldGrade: 1.32Grade Unit: g/tIntercept: 18 mView all details
Link to this fact

Identity

Hole ID
DWRC523
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.32
Grade Unit
g/t
Intercept
18 m
True Width
9.5 m
From
90 m
To
108 m
Hole Depth
114 m
Intercept Depth
90 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC523:90-108
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160122
Northing
1412469
Elevation
183 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A wide intercept with a low grade, contributing to volume but not high-grade potential.

Positive factors

  • True width disclosed (9.5m).
  • Intercept length (18.0m) is moderate.

Negative factors

  • Grade (1.32 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“1.32”

Context: 18.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 9.5

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC529Douta West · goldGrade: 1.17Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DWRC529
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.17
Grade Unit
g/t
Intercept
3 m
True Width
1.6 m
From
4 m
To
7 m
Hole Depth
87 m
Intercept Depth
4 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC529:4-7
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160570
Northing
1413103
Elevation
175 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.6m).

Negative factors

  • Grade (1.17 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.17”

Context: 3.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC543Douta West · goldGrade: 1.62Grade Unit: g/tIntercept: 9 mView all details
Link to this fact

Identity

Hole ID
DWRC543
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.62
Grade Unit
g/t
Intercept
9 m
True Width
4.8 m
From
24 m
To
33 m
Hole Depth
87 m
Intercept Depth
24 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC543:24-33
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160724
Northing
1413385
Elevation
172 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A moderate width intercept with a low grade, contributing to volume but not high-grade potential.

Positive factors

  • True width disclosed (4.8m).
  • Intercept length (9.0m) is moderate.

Negative factors

  • Grade (1.62 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“1.62”

Context: 9.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4.8

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC543Douta West · goldGrade: 0.91Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC543
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.91
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
41 m
To
43 m
Hole Depth
87 m
Intercept Depth
24 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC543:41-43
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160724
Northing
1413385
Elevation
172 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.91 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.91”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC544Douta West · goldGrade: 0.52Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC544
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.52
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
8 m
To
10 m
Hole Depth
78 m
Intercept Depth
8 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC544:8-10
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160706
Northing
1413401
Elevation
174 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.52 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.52”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC544Douta West · goldGrade: 0.92Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC544
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.92
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
56 m
To
58 m
Hole Depth
78 m
Intercept Depth
8 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC544:56-58
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160706
Northing
1413401
Elevation
174 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.92 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.92”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC544Douta West · goldGrade: 0.6Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
DWRC544
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.6
Grade Unit
g/t
Intercept
4 m
True Width
2.1 m
From
61 m
To
65 m
Hole Depth
78 m
Intercept Depth
8 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC544:61-65
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160706
Northing
1413401
Elevation
174 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.1m).

Negative factors

  • Grade (0.60 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.60”

Context: 4.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC544Douta West · goldGrade: 0.65Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
DWRC544
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.65
Grade Unit
g/t
Intercept
7 m
True Width
3.7 m
From
68 m
To
75 m
Hole Depth
78 m
Intercept Depth
8 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC544:68-75
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160706
Northing
1413401
Elevation
174 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (3.7m).

Negative factors

  • Grade (0.65 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“0.65”

Context: 7.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.7

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC547Douta West · goldGrade: 0.58Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DWRC547
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.58
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
22 m
To
24 m
Hole Depth
50 m
Intercept Depth
22 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC547:22-24
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160783
Northing
1413467
Elevation
183 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.58 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.58”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC548Douta West · goldGrade: 0.67Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DWRC548
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.67
Grade Unit
g/t
Intercept
3 m
True Width
1.6 m
From
12 m
To
15 m
Hole Depth
54 m
Intercept Depth
12 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC548:12-15
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160763
Northing
1413484
Elevation
183 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.6m).

Negative factors

  • Grade (0.67 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.67”

Context: 3.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC548Douta West · goldGrade: 0.59Grade Unit: g/tIntercept: 6 mView all details
Link to this fact

Identity

Hole ID
DWRC548
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.59
Grade Unit
g/t
Intercept
6 m
True Width
3.2 m
From
45 m
To
51 m
Hole Depth
54 m
Intercept Depth
12 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DWRC548:45-51
Mining Method
open_pit

Location

Location
Baraka 3
Easting
160763
Northing
1413484
Elevation
183 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (3.2m).

Negative factors

  • Grade (0.59 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“0.59”

Context: 6.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DTRC1176Douta West · goldGrade: 1.73Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
DTRC1176
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.73
Grade Unit
g/t
Intercept
2 m
True Width
1.7 m
From
11 m
To
13 m
Hole Depth
35 m
Intercept Depth
11 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DTRC1176:11-13
Mining Method
open_pit

Location

Location
Makosa Tail
Easting
174189
Northing
1433789
Elevation
199 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.7m).

Negative factors

  • Grade (1.73 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.7m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.73”

Context: 2.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.7

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DTRC1187Douta West · goldGrade: 1.56Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DTRC1187
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.56
Grade Unit
g/t
Intercept
3 m
True Width
2.6 m
From
21 m
To
24 m
Hole Depth
50 m
Intercept Depth
21 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DTRC1187:21-24
Mining Method
open_pit

Location

Location
Makosa Tail
Easting
174124
Northing
1433616
Elevation
229 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.6m).

Negative factors

  • Grade (1.56 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.56”

Context: 3.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DTRC1188Douta West · goldGrade: 1.09Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
DTRC1188
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.09
Grade Unit
g/t
Intercept
3 m
True Width
2.6 m
From
49 m
To
52 m
Hole Depth
66 m
Intercept Depth
49 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DTRC1188:49-52
Mining Method
open_pit

Location

Location
Makosa Tail
Easting
174099
Northing
1433630
Elevation
226 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.6m).

Negative factors

  • Grade (1.09 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.09”

Context: 3.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DTRC1193Douta West · goldGrade: 3.06Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
DTRC1193
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
3.06
Grade Unit
g/t
Intercept
4 m
True Width
3.4 m
From
20 m
To
24 m
Hole Depth
50 m
Intercept Depth
20 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DTRC1193:20-24
Mining Method
open_pit

Location

Location
Makosa Tail
Easting
173949
Northing
1433489
Elevation
217 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A weak grade intercept with a reasonable true width, contributing positively to the Makosa Tail extension.

Positive factors

  • Grade (3.06 g/t Au) is weak for an orogenic gold deposit.
  • True width disclosed (3.4m).

Evidence · table

“3.06”

Context: 4.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DTRC1210Douta West · goldGrade: 0.81Grade Unit: g/tIntercept: 5 mView all details
Link to this fact

Identity

Hole ID
DTRC1210
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.81
Grade Unit
g/t
Intercept
5 m
True Width
4.3 m
From
27 m
To
32 m
Hole Depth
46 m
Intercept Depth
27 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DTRC1210:27-32
Mining Method
open_pit

Location

Location
Makosa Tail
Easting
173784
Northing
1433583
Elevation
210 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (4.3m).

Negative factors

  • Grade (0.81 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“0.81”

Context: 5.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4.3

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DTRC1211Douta West · goldGrade: 3.26Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
DTRC1211
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
3.26
Grade Unit
g/t
Intercept
4 m
True Width
3.4 m
From
24 m
To
28 m
Hole Depth
48 m
Intercept Depth
24 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
DTRC1211:24-28
Mining Method
open_pit

Location

Location
Makosa Tail
Easting
173772
Northing
1433599
Elevation
210 m
Azimuth
130 °
Dip
-60 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A weak grade intercept with a reasonable true width, contributing positively to the Makosa Tail extension.

Positive factors

  • Grade (3.26 g/t Au) is weak for an orogenic gold deposit.
  • True width disclosed (3.4m).

Evidence · table

“3.26”

Context: 4.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC001Douta West · goldGrade: 0.64Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC001
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.64
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
9 m
To
11 m
Hole Depth
37 m
Intercept Depth
9 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC001:9-11
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171299
Northing
1422502
Elevation
170 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.64 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.64”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC001Douta West · goldGrade: 9.09Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC001
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
9.09
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
14 m
To
16 m
Hole Depth
37 m
Intercept Depth
9 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC001:14-16
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171299
Northing
1422502
Elevation
170 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A strong grade intercept, despite its narrow true width, indicating high-grade potential at Bousankhoba.

Positive factors

  • Grade (9.09 g/t Au) is strong for an orogenic gold deposit.
  • True width disclosed (1.1m).

Negative factors

  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“9.09”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC001Douta West · goldGrade: 0.92Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC001
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.92
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
32 m
To
34 m
Hole Depth
37 m
Intercept Depth
9 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC001:32-34
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171299
Northing
1422502
Elevation
170 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.92 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.92”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC005Douta West · goldGrade: 0.55Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC005
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.55
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
42 m
To
44 m
Hole Depth
45 m
Intercept Depth
42 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC005:42-44
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171221
Northing
1422502
Elevation
168 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.55 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.55”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC006Douta West · goldGrade: 2.5Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC006
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
2.5
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
17 m
To
19 m
Hole Depth
27 m
Intercept Depth
17 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC006:17-19
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171246
Northing
1422502
Elevation
170 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A weak grade intercept with a narrow true width, contributing to the overall geological model.

Positive factors

  • Grade (2.50 g/t Au) is weak for an orogenic gold deposit.
  • True width disclosed (1.1m).

Negative factors

  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“2.50”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC009Douta West · goldGrade: 2.69Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
BSAC009
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
2.69
Grade Unit
g/t
Intercept
3 m
True Width
1.7 m
From
5 m
To
8 m
Hole Depth
27 m
Intercept Depth
5 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC009:5-8
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171278
Northing
1422499
Elevation
169 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A weak grade intercept with a narrow true width, contributing to the overall geological model.

Positive factors

  • Grade (2.69 g/t Au) is weak for an orogenic gold deposit.
  • True width disclosed (1.7m).

Negative factors

  • True width (1.7m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“2.69”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.7

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC019Douta West · goldGrade: 4.56Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
BSAC019
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
4.56
Grade Unit
g/t
Intercept
4 m
True Width
2.2 m
From
6 m
To
10 m
Hole Depth
10 m
Intercept Depth
6 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC019:6-10
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171549
Northing
1422497
Elevation
171 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A moderate grade intercept, indicating good potential at Bousankhoba, despite the narrow true width.

Positive factors

  • Grade (4.56 g/t Au) is moderate for an orogenic gold deposit.
  • True width disclosed (2.2m).

Negative factors

  • True width (2.2m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“4.56”

Context: 4

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC020Douta West · goldGrade: 1.66Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC020
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.66
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
3 m
To
5 m
Hole Depth
18 m
Intercept Depth
3 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC020:3-5
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171555
Northing
1422496
Elevation
171 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (1.66 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.66”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC027Douta West · goldGrade: 0.5Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC027
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.5
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
17 m
To
19 m
Hole Depth
19 m
Intercept Depth
17 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC027:17-19
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171559
Northing
1422808
Elevation
168 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.50 g/t Au) is at the cut-off grade and below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.50”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC028Douta West · goldGrade: 0.87Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC028
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.87
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
22 m
To
24 m
Hole Depth
33 m
Intercept Depth
22 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC028:22-24
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171570
Northing
1422806
Elevation
168 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.87 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.87”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC042Douta West · goldGrade: 1.08Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
BSAC042
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.08
Grade Unit
g/t
Intercept
3 m
True Width
1.6 m
From
14 m
To
17 m
Hole Depth
34 m
Intercept Depth
14 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC042:14-17
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
172002
Northing
1422616
Elevation
160 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.6m).

Negative factors

  • Grade (1.08 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.08”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC045Douta West · goldGrade: 16.99Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
BSAC045
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
16.99
Grade Unit
g/t
Intercept
4 m
True Width
2 m
From
7 m
To
11 m
Hole Depth
42 m
Intercept Depth
7 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC045:7-11
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
172028
Northing
1422722
Elevation
159 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: An exceptional grade intercept, indicating significant high-grade potential at Bousankhoba, despite the narrow true width.

Positive factors

  • Grade (16.99 g/t Au) is exceptional for an orogenic gold deposit.
  • True width disclosed (2.0m).

Negative factors

  • True width (2.0m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“16.99”

Context: 4

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC049Douta West · goldGrade: 0.63Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC049
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.63
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
22 m
To
24 m
Hole Depth
33 m
Intercept Depth
22 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC049:22-24
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171875
Northing
1422820
Elevation
158 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A very low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (0.63 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.63”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC050Douta West · goldGrade: 1.29Grade Unit: g/tIntercept: 4 mView all details
Link to this fact

Identity

Hole ID
BSAC050
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.29
Grade Unit
g/t
Intercept
4 m
True Width
4 m
From
10 m
To
14 m
Hole Depth
18 m
Intercept Depth
10 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC050:10-14
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171896
Northing
1422818
Elevation
158 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade intercept with a reasonable true width, contributing to the overall geological model.

Positive factors

  • True width disclosed (4.0m).

Negative factors

  • Grade (1.29 g/t Au) is below the weak threshold for an orogenic gold deposit.

Evidence · table

“1.29”

Context: 4

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 4

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC058Douta West · goldGrade: 0.94Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
BSAC058
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.94
Grade Unit
g/t
Intercept
3 m
True Width
2.6 m
From
18 m
To
21 m
Hole Depth
50 m
Intercept Depth
18 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC058:18-21
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171997
Northing
1422921
Elevation
153 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.6m).

Negative factors

  • Grade (0.94 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.94”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC060Douta West · goldGrade: 1.93Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC060
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
1.93
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
27 m
To
29 m
Hole Depth
29 m
Intercept Depth
27 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC060:27-29
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171131
Northing
1422303
Elevation
170 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (1.1m).

Negative factors

  • Grade (1.93 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“1.93”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC062Douta West · goldGrade: 2.98Grade Unit: g/tIntercept: 2 mView all details
Link to this fact

Identity

Hole ID
BSAC062
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
2.98
Grade Unit
g/t
Intercept
2 m
True Width
1.1 m
From
32 m
To
34 m
Hole Depth
50 m
Intercept Depth
32 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC062:32-34
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171996
Northing
1422920
Elevation
168 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A weak grade intercept with a narrow true width, contributing to the overall geological model.

Positive factors

  • Grade (2.98 g/t Au) is weak for an orogenic gold deposit.
  • True width disclosed (1.1m).

Negative factors

  • True width (1.1m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“2.98”

Context: 2

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

BSAC063Douta West · goldGrade: 0.6Grade Unit: g/tIntercept: 3 mView all details
Link to this fact

Identity

Hole ID
BSAC063
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
0.6
Grade Unit
g/t
Intercept
3 m
True Width
2.6 m
From
0 m
To
3 m
Hole Depth
29 m
Intercept Depth
0 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
BSAC063:0-3
Mining Method
open_pit

Location

Location
Bousankhoba Prospect
Easting
171206
Northing
1422301
Elevation
166 m
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Deleterious

Deleterious Flag
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A low-grade, narrow intercept with limited economic significance.

Positive factors

  • True width disclosed (2.6m).

Negative factors

  • Grade (0.60 g/t Au) is below the weak threshold for an orogenic gold deposit.
  • True width (2.6m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · table

“0.60”

Context: 3

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 2.6

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC163Douta West · goldGrade: 4.38Grade Unit: g/tIntercept: 7 mView all details
Link to this fact

Identity

Hole ID
DWRC163
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
4.38
Grade Unit
g/t
Intercept
7 m
From
122 m
To
129 m

Classification

Deposit Type
orogenic
Sample Type
drill

Location

Location
Baraka 3
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Compositing

Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A weak grade intercept with a narrow true width, but contributes to the overall understanding of the Baraka 3 deposit.

Positive factors

  • True width disclosed (2.9m).

Negative factors

  • Grade (2.91 g/t Au) is weak for an orogenic gold deposit.
  • True width (2.9m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · text

“7m grading 4.38 g/t Au from 122m”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

DWRC163Douta West · goldGrade: 8.91Grade Unit: g/tIntercept: 14 mView all details
Link to this fact

Identity

Hole ID
DWRC163
Project
Douta West
Commodity
gold
Region
senegal
Reported Region
senegal
Ticker
THX

Geometry

Grade
8.91
Grade Unit
g/t
Intercept
14 m
From
1 m
To
15 m

Classification

Deposit Type
orogenic
Sample Type
drill

Location

Location
Baraka 3
Loc. Source
document

QA/QC

Laboratory
ALS Laboratories
QA/QC Disclosed
Yes
QP Signed
Yes

Compositing

Dilution Disclosed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-05-13T00:00:00.000Z

Reasoning: A weak grade intercept with a narrow true width, but contributes to the overall understanding of the Baraka 3 deposit.

Positive factors

  • True width disclosed (2.9m).

Negative factors

  • Grade (2.91 g/t Au) is weak for an orogenic gold deposit.
  • True width (2.9m) is below the 3m tolerance for orogenic gold, suggesting limited economic width.

Evidence · text

“14m grading 8.91 g/t Au from 1m”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: ""We continue to progress our post PFS workstreams and anticipate full permitting and the start of construction later thi"

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.