# Tintina Mines Announces Commencement of Drilling at the Dos Amigos Project in Chile

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/tintina-mines-announces-commencement-of-drilling-at-the-dos-amigos-project-in-ch--db385e11-f99a-445d-bdaf-c37f0976d165

Original source: https://www.accessnewswire.com/newsroom/en/metals-and-mining/tintina-mines-announces-commencement-of-drilling-at-the-dos-amigos-project-in-chi-1225169

Publisher: accesswire

Original announcement: 2026-09-22T11:16:01.412Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Tintina Mines Limited

- Ticker: TTS

- Exchange: Unavailable

- Region: Atacama Region, Chile

- Primary commodity: Copper

- Secondary commodities: Gold

- Document categories: Resource update, Drill results

- Extracted: 2026-09-22 11:21:22 UTC

Narrative sentiment: 0.40 · Bullish

## Minestarters Atlas summary

Tintina Mines has commenced a 40,000-metre diamond drilling program at the Dos Amigos project in Chile to convert Inferred resources to the Indicated category. The company also announced the appointment of Richard Leclerc as General Manager for its Chilean subsidiary.

Reasoning: The announcement marks the start of a significant resource conversion drilling program at a large copper-gold project, providing a clear catalyst for upcoming resource upgrades.

- Positive factor: Commencement of a large 40,000m infill drilling program

- Positive factor: Existing resource base of ~357 Mt copper-gold

- Positive factor: Clear path toward feasibility study

Facts used in scoring: 3

## Classification and evidence

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The 40,000m program is explicitly described as infill drilling to support resource conversion.

Evidence · text

> 40,000-metre infill drilling program underway at Dos Amigos in support of a planned feasibility study

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: The release details specific QA/QC protocols including standards, blanks, and duplicates.

Evidence · text

> The Company employed a rigorous QAQC program involving certified standards, blank, ¼ core duplicates and coarse reject duplicates.

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The resource estimate is reported in accordance with NI 43-101 standards.

Evidence · text

> The Mineral resource estimates disclosed in this news release were reported... in accordance with NI 43-101.

## Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

## Drill Results (1)

### Fact 1

[Link to this fact](https://atlas-extractions.minestarters.com/news/tintina-mines-announces-commencement-of-drilling-at-the-dos-amigos-project-in-ch--db385e11-f99a-445d-bdaf-c37f0976d165#fact-drill-facts-2)

Tricolor · copper

Historical result

Needs review: drill\_no\_hole\_id

#### Identity

- Project: Tricolor
- Commodity: copper
- Region: chile
- Reported Region: chile
- Ticker: TTS

#### Geometry

- Grade: 0.56
- Grade Unit: %
- Intercept: 230 m

#### Classification

- Sample Type: drill

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, blanks, duplicates

#### Compositing

- Dilution Disclosed: Yes

#### Review

- Needs Review: Yes
- Review Reason: drill\_no\_hole\_id
- Interp. Status: scored
- Historical: Yes

#### Dates

- Event date: 2026-09-22T00:00:00.000Z

Reasoning: Historical drill result explicitly reported in source prose.

Evidence · text

> Previous drilling in 2018 at Tricolor returned 230m @ 0.56% copper \("Cu"\) and 0.33 g/t gold \("Au"\) from 18m to end-of-hole \(SDDK 18-035\).

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Stale Data Re-release**

Polarity: negative

Definition: Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: the fact restates a prior release

## Resource Estimates (2)

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/tintina-mines-announces-commencement-of-drilling-at-the-dos-amigos-project-in-ch--db385e11-f99a-445d-bdaf-c37f0976d165#fact-resource-facts-0)

Dos Amigos · copper

#### Identity

- Project: Dos Amigos
- Commodity: copper
- Region: chile
- Reported Region: Atacama Region, Chile
- Ticker: TTS

#### Resource scope

- Estimate type: resource
- Resource group id: resource:05e3d956d48660771da6

#### Resource Data

- Category: indicated
- Tonnes: 100800000
- Grade: 0.35
- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-22T00:00:00.000Z

Reasoning: Part of the existing M&amp;I resource base mentioned in the context of the new drilling program.

Evidence · text

> 100.8 million tonnes \("Mt"\) at 0.35% copper

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/tintina-mines-announces-commencement-of-drilling-at-the-dos-amigos-project-in-ch--db385e11-f99a-445d-bdaf-c37f0976d165#fact-resource-facts-1)

Dos Amigos · copper

#### Identity

- Project: Dos Amigos
- Commodity: copper
- Region: chile
- Reported Region: Atacama Region, Chile
- Ticker: TTS

#### Resource scope

- Estimate type: resource
- Resource group id: resource:e0c8f1e3d3be84e4e70a

#### Resource Data

- Category: inferred
- Tonnes: 256300000
- Grade: 0.34
- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-09-22T00:00:00.000Z

Reasoning: Inferred resource component targeted for conversion by the new drilling program.

Evidence · text

> 256.3 Mt at 0.34% copper

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
