Titan Mining to Start Shipping First Graphite Product and Feasibility Study Underway for 40,000 tpa Integrated Kilbourne Graphite Project

Original announcement by tmx on

Company
Titan Mining Corporation
Ticker
TI
Exchange
TSX
Region
New York
Primary commodity
Graphite
Secondary commodities
Zinc
Document categories
Resource update, Other
Extracted
2026-09-15 03:01:29 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

Titan Mining has launched a fully-funded Feasibility Study for its 40,000 tpa Kilbourne Graphite Project in New York and has begun shipping graphite concentrate from its demonstration facility. The project is supported by EXIM Bank and aims to address U.S. reliance on graphite imports.

Reasoning: The company is transitioning from demonstration-scale to a planned 40,000 tpa integrated operation, supported by federal funding and active drilling for resource expansion.

Positive factors

  • Commencement of shipping first graphite product from demonstration facility
  • Launch of fully-funded Feasibility Study
  • Federal financing support from EXIM Bank
  • Strategic positioning to address US import reliance

Facts used in scoring: 2

Classification and evidence

Maiden Resource (neutral)neutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The company is currently conducting drilling aimed at mineral resource expansion to upgrade the current estimate.

Evidence · text

“aimed at mineral resource expansion, commenced in the fourth quarter of 2025”

Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

Resource Estimates (1)

Fact 1View all details
Link to this fact

Identity

Region
new york
Reported Region
New York
Ticker
TI

Resource scope

Reporting standards
ni_43_101
Ownership percent
100 %

Review

Needs Review
No
Historical
No

Dates

Event date
2026-03-11T00:00:00.000Z

Reasoning: Demonstrates successful demonstration-scale production and ability to deliver product to customers.

Positive factors

  • First commercial-scale shipping milestone

Evidence · text

“commencement of shipping of graphite concentrate from its demonstration facility”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.