# Tudor Upsizes Flow-Through Financing

Canonical Atlas analysis: https://atlas-extractions.minestarters.com/news/tudor-upsizes-flow-through-financing--1bdcb234-8a14-43c9-a308-c15e3fa2258c

Original source: https://money.tmx.com/en/quote/TUD/news/8051796295543206/tudor-upsizes-flow-through-financing

Publisher: tmx

Original announcement: 2025-11-25T22:56:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Tudor Gold Corp.

- Ticker: TUD

- Exchange: TSX

- Region: British Columbia

- Primary commodity: Gold

- Secondary commodities: Copper, Silver

- Document categories: Resource update, Capital raise

- Extracted: 2026-09-17 03:07:51 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Tudor Gold Corp. intends to upsize its previously announced flow-through financing to up to 12.75 million units, aiming for gross proceeds of approximately $12 million. The funds are earmarked for exploration at the Treaty Creek Project in British Columbia. The release also restates the Indicated and Inferred resource components of the Goldstorm Deposit.

Reasoning: The company is increasing the size of its flow-through financing to raise up to $12M, providing significant liquidity for exploration at a large gold-copper porphyry system.

- Positive factor: Upsizing of financing from 8.5m to 12.75m units

- Positive factor: Significant resource scale at Treaty Creek Project

- Positive factor: Clear use of proceeds for exploration

Facts used in scoring: 7

## Classification and evidence

**capital\_raise**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The document announces an intention to increase the size of a non-brokered private placement.

Evidence · text

> intends to increase the size of its non-brokered private placement

**resource\_update**

Polarity: neutral

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The document restates historical resource figures for the Goldstorm Deposit.

Evidence · text

> The Goldstorm Deposit has an Indicated Mineral Resource of 730.20 million tonnes

## Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

## Resource Estimates (6)

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/tudor-upsizes-flow-through-financing--1bdcb234-8a14-43c9-a308-c15e3fa2258c#fact-resource-facts-1)

Treaty Creek Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Treaty Creek Project
- Commodity: gold
- Region: canada\_bc
- Reported Region: British Columbia
- Ticker: TUD

#### Resource scope

- Estimate type: resource
- Resource group id: resource:a90d655fa8f0e13d9b63
- Deposit or zone: Goldstorm Deposit
- Mining method: other
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 730200000
- Grade: 0.92
- Grade Unit: g/t
- Contained Metal: 21.66
- Contained Unit: moz

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-04-05T00:00:00.000Z

#### Dates

- Event date: 2025-11-25T00:00:00.000Z

Reasoning: Restatement of historical resource data from an April 2024 technical report.

- Positive factor: Large scale indicated resource

Evidence · text

> Indicated Mineral Resource of 730.20 million tonnes \(Mt\) comprised of 21.66 million ounces gold grading 0.92 g/t

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/tudor-upsizes-flow-through-financing--1bdcb234-8a14-43c9-a308-c15e3fa2258c#fact-resource-facts-2)

Treaty Creek Project · copper

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Treaty Creek Project
- Commodity: copper
- Region: canada\_bc
- Reported Region: British Columbia
- Ticker: TUD

#### Resource scope

- Estimate type: resource
- Resource group id: resource:a90d655fa8f0e13d9b63
- Deposit or zone: Goldstorm Deposit
- Mining method: other
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 730200000
- Grade: 0.18
- Grade Unit: %
- Contained Metal: 2870000000
- Contained Unit: lb

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-04-05T00:00:00.000Z

#### Dates

- Event date: 2025-11-25T00:00:00.000Z

Reasoning: Restatement of historical resource data for copper.

Evidence · text

> 2.87 billion pounds copper grading 0.18%

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### indicated

[Link to this fact](https://atlas-extractions.minestarters.com/news/tudor-upsizes-flow-through-financing--1bdcb234-8a14-43c9-a308-c15e3fa2258c#fact-resource-facts-3)

Treaty Creek Project · silver

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Treaty Creek Project
- Commodity: silver
- Region: canada\_bc
- Reported Region: British Columbia
- Ticker: TUD

#### Resource scope

- Estimate type: resource
- Resource group id: resource:a90d655fa8f0e13d9b63
- Deposit or zone: Goldstorm Deposit
- Mining method: other
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 730200000
- Grade: 5.48
- Grade Unit: g/t
- Contained Metal: 128.73
- Contained Unit: moz

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-04-05T00:00:00.000Z

#### Dates

- Event date: 2025-11-25T00:00:00.000Z

Reasoning: Restatement of historical resource data for silver.

Evidence · text

> 128.73 million ounces silver grading 5.48 g/t

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/tudor-upsizes-flow-through-financing--1bdcb234-8a14-43c9-a308-c15e3fa2258c#fact-resource-facts-4)

Treaty Creek Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Treaty Creek Project
- Commodity: gold
- Region: canada\_bc
- Reported Region: British Columbia
- Ticker: TUD

#### Resource scope

- Estimate type: resource
- Resource group id: resource:a1c1f8501d1dda7fa369
- Deposit or zone: Goldstorm Deposit
- Mining method: other
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 149610000
- Grade: 1.01
- Grade Unit: g/t
- Contained Metal: 4.88
- Contained Unit: moz

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-04-05T00:00:00.000Z

#### Dates

- Event date: 2025-11-25T00:00:00.000Z

Reasoning: Restatement of historical resource data for gold \(Inferred\).

Evidence · text

> Inferred Mineral Resource of 149.61 Mt comprised of 4.88 million ounces gold grading 1.01 g/t

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/tudor-upsizes-flow-through-financing--1bdcb234-8a14-43c9-a308-c15e3fa2258c#fact-resource-facts-5)

Treaty Creek Project · copper

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Treaty Creek Project
- Commodity: copper
- Region: canada\_bc
- Reported Region: British Columbia
- Ticker: TUD

#### Resource scope

- Estimate type: resource
- Resource group id: resource:a1c1f8501d1dda7fa369
- Deposit or zone: Goldstorm Deposit
- Mining method: other
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 149610000
- Grade: 0.15
- Grade Unit: %
- Contained Metal: 503200000
- Contained Unit: lb

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-04-05T00:00:00.000Z

#### Dates

- Event date: 2025-11-25T00:00:00.000Z

Reasoning: Restatement of historical resource data for copper \(Inferred\).

Evidence · text

> 503.2 million pounds copper grading 0.15%

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### inferred

[Link to this fact](https://atlas-extractions.minestarters.com/news/tudor-upsizes-flow-through-financing--1bdcb234-8a14-43c9-a308-c15e3fa2258c#fact-resource-facts-6)

Treaty Creek Project · silver

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Treaty Creek Project
- Commodity: silver
- Region: canada\_bc
- Reported Region: British Columbia
- Ticker: TUD

#### Resource scope

- Estimate type: resource
- Resource group id: resource:a1c1f8501d1dda7fa369
- Deposit or zone: Goldstorm Deposit
- Mining method: other
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 149610000
- Grade: 6.02
- Grade Unit: g/t
- Contained Metal: 28.97
- Contained Unit: moz

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2024-04-05T00:00:00.000Z

#### Dates

- Event date: 2025-11-25T00:00:00.000Z

Reasoning: Restatement of historical resource data for silver \(Inferred\).

Evidence · text

> 28.97 million ounces silver grading 6.02 g/t

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
