US Copper Announces Positive Locked Cycle Test Results from Metallurgical Testwork at the Moonlight-Superior Copper Project
US Copper Corp. has announced positive locked cycle metallurgical test results for the Moonlight-Superior Copper Project, achieving 91% copper recovery with a 24% Cu concentrate. The tests, conducted at ALS Metallurgy, confirm a robust and conventional flotation flowsheet for the Superior sulphide zone.