Higher Santa Cruz capital costs weigh on Ivanhoe Electric
Ivanhoe Electric's Santa Cruz copper project PFS shows pre-production capital rising 15% to $1.43 billion, though NPV increased to $1.5 billion. The study includes a redesigned access tunnel and a copper price assumption of $4.75/lb, resulting in a 19% IRR and a 4.8-year payback.