GreenLight Metals Intersects 27.72m of 1.07% Cu and 0.97 g/t Au (2.10% CuEq) including 15.65m of 1.66% Cu and 1.39 g/t Au (3.14% CuEq) at the Bend VMS Deposit in Wisconsin
GreenLight Metals has reported significant drill results from the Bend VMS Project in Wisconsin, including a 27.72m intercept of 1.07% Cu and 0.97 g/t Au in hole B26-008. The results confirm the extension of high-grade mineralization down-dip and along strike from previous exploration.