Silver Elephant Mining Corp.
Silver Elephant Reports 350 Grams Per Ton Germanium and 28% Zinc over 6.6 feet in Historic Drill Assays at the Kentucky Robinson-Lasher Project, 90 Miles from Proposed US$7.4 Billion Smelter in Tennessee
Silver Elephant Mining Corp. reports historical drill assays from its Robinson-Lasher Project in Kentucky, revealing high-grade germanium (up to 350 g/t) and zinc (up to 28%) over significant widths. The project is strategically located near a proposed US$7.4 billion critical-minerals smelter. However, all results are historical and unverified, with no current metallurgical or economic studies completed.