Gold Mining News in Manitoba

Boreal Gold Inc.
Boreal Gold Inc.
BGLD
Manitoba
Drill Results

Massive Sulphides at Fay Lake

Boreal Gold Inc. reported visual observations of massive and semi-massive sulphides from drilling at its Fay Lake Property in Manitoba. Drill holes FA-26-01 and FA-26-03 intersected sulphides, with a significant 10.05m interval in FA-26-01, but assays are pending for all new intercepts. The company also provided details on QA/QC procedures and mentioned historical rock samples with high gold grades from the area.

View story
ONGold Resources Ltd.
ONGold Resources Ltd.
ONAU.V
Manitoba

ONGold Identifies AZ Zone as Priority Near-Mine Gold Drill Target at Monument Bay & Receives Manitoba Government Support

ONGold Resources Ltd. has identified the AZ Zone at the Monument Bay Gold Project as a priority near-mine drill target, supported by historical high-grade grab and channel samples. The company will commence a 2,500m diamond drill program in November 2026 and has received a $300k grant from the Manitoba government.

View story
1911 Gold Corporation
1911 Gold Corporation
AUMB
Gold
Manitoba

1911 Gold Targets 2027 Restart of Fully Permitted True North Mine in Manitoba

1911 Gold is targeting a 2027 production restart at its fully permitted True North mine in Manitoba, supported by strong PEA economics. Recent drilling has confirmed a high-grade link between zones, and the company is preparing a global resource update for Q4 2026.

View story
ONGold Resources
ONGold Resources
ONAU
Manitoba

ONGold revives Monument Bay with 2M oz resource

ONGold Resources has released an updated mineral resource estimate for the Monument Bay gold project in Manitoba, outlining 2 million ounces of measured and indicated gold. While the new model includes significantly more tonnage than the 2017 historical estimate, it reports lower grades and fewer total contained ounces.

View story
Boreal Gold Inc.
Boreal Gold Inc.
BGLD.CN
Manitoba
Drill Results

Boreal Gold Announces 190.38 g/t Gold from Koscielny Lake and 19.19 g/t Gold from Redwin Shaft Area on the Fay Lake Property

Boreal Gold has reported high-grade gold surface grab samples from the Fay Lake Property, including a bonanza intercept of 190.38 g/t Au at Koscielny Lake. The results also include notable gold values from the Redwin Shaft area, with mineralization associated with trace bismuth, tellurium, and molybdenum.

View story
NiCAN Limited
NiCAN Limited
NICN
Manitoba
Drill Results

NiCAN Intersects Broad Zones of Gold Mineralization at Pipy South, Thompson, Manitoba

NiCAN Limited announced positive assay results from the first seven holes of its 16-hole diamond drill program at the Pipy South Property in Thompson, Manitoba. The drilling confirmed broad zones of gold mineralization, extending the Horseshoe Gold zone at least 400m along strike. The results also identified a larger, geologically similar target to the south, significantly expanding the exploration potential of the property.

View story
ONGold Resources Ltd.
ONGold Resources Ltd.
ONAU
Manitoba

ONGold Announces Updated Mineral Resource Estimate for the Monument Bay Gold Project, Manitoba

ONGold has announced an updated Mineral Resource Estimate for the Monument Bay Gold Project in Manitoba, totaling 98.85 million tonnes of gold at 0.76 g/t Au (combined M&I and Inferred). The update features a strong Measured and Indicated component of 2.0 million ounces and highlights new tungsten assay results from historical samples within high-grade gold zones.

View story
ONGold Resources Ltd.
ONGold Resources Ltd.
ONAU.V
Manitoba
Resource Estimate

ONGold Announces Updated Mineral Resource Estimate for the Monument Bay Gold Project, Manitoba

ONGold Resources Ltd. announced an updated Mineral Resource Estimate for its Monument Bay Gold Project in Manitoba, effective July 31, 2026. The estimate outlines 74.39 million tonnes at 0.84 g/t Au for 2.0 million ounces of gold in the Measured and Indicated categories, with an additional 24.46 million tonnes at 0.62 g/t Au for 0.49 million ounces in the Inferred category. The resource is open-pit constrained, reported above a 0.20 g/t Au cut-off, and incorporates a revised geological model, with 80% of contained gold in higher confidence categories.

View story
NiCAN Limited
NiCAN Limited
NICN.V
Manitoba
Drill Results

NiCAN Intersects Broad Zones of Gold Mineralization at Pipy South, Thompson, Manitoba

NiCAN Limited announced assay results from the first seven holes of its 16-hole diamond drill program at the Pipy South Property in Thompson, Manitoba. The results confirm that the Horseshoe Gold zone extends at least 400m along strike, with notable intercepts including 75m at 0.65g/t gold and 30m at 0.9g/t gold, which included 2m of 8.01g/t gold. The company has also expanded its land position to 65km² based on the identification of a larger, geologically similar feature to the south.

View story
1911 Gold Corp
1911 Gold Corp
AUMB
Gold
Manitoba

1911 Gold reports high-grade results, confirms L10/710-711 connection at True North

1911 Gold Corp reported high-grade underground drill results from the True North Gold Project in Manitoba, confirming a connection between the L10 and 710-711 vein systems. The results include an intercept of 50.61 g/t gold over 1.60 metres and will be incorporated into an upcoming global mineral resource estimate in Q4 2026.

View story