Gold Mining News in Eritrea

Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Gold
Eritrea
Drill Results

Alpha Drills 12 m Grading 2.09 g/t Gold within 31 m Grading 1.12 g/t Gold at New Aburna Corridor Obok Prospect

Alpha Exploration Ltd. announced a first batch of drill results from its ongoing exploration program at the Aburna Gold Project in Eritrea, highlighting a significant intercept of 12 meters grading 2.09 g/t gold within 31 meters grading 1.12 g/t gold in hole ABD029 at the new Obok Prospect. The program also returned multiple gold intercepts at the EER and SW targets, demonstrating potential to expand the Hill 52 prospect's mineralization. These results are from early testing of new targets within the highly prospective Aburna corridor, with further results expected.

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Eritrea

Alpha Commences Drilling at Aburna Gold Project and New Targets Identified

Alpha Exploration Ltd. has commenced a 6,500-metre exploration drilling campaign at the Aburna Gold Project in Eritrea. The program aims to expand existing prospects and test seven newly identified targets within the Aburna corridor.

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Eritrea

Alpha Chairman Mike Hopley Retires and Stephen Gatley Joins Alpha Board of Directors

Alpha Exploration Ltd. announced the retirement of Chairman Mike Hopley and the appointment of mining engineer Stephen Gatley to its Board of Directors. The company also confirmed the completion of its recent private placement, raising approximately $7.52 million.

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Eritrea

Alpha Exploration Closes Second Tranche of Private Placement Financing and Extension of Private Placement Financing

Alpha Exploration has closed the second tranche of its non-brokered private placement, raising C$1,269,419 at C$0.60 per unit. The total proceeds to date from this placement amount to C$7,520,820, which will be used to fund exploration at the Kerkasha Project in Eritrea.

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Gold
Eritrea
Drill Results

Alpha Announces Second Batch of 2025 Drill Results, Including 10 Metres Grading 3.12 g/t Gold, from the Aburna Gold Project

Alpha Exploration Ltd. announced positive drill results from its Aburna Gold Project in Eritrea, including 10 metres grading 3.12 g/t gold and a high-grade intercept of 16.61 g/t gold over 1 metre. These results, part of the 2025 exploration program, confirm the tenor of the gold system and extend mineralization to at least 150 metres vertical depth. The company also provided detailed QA/QC information and estimates for true widths of the intersections.

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Gold
Eritrea

Alpha Announces New Drilling Results from Ongoing 2025 Exploration Program at the Aburna Gold Project

Alpha Exploration Ltd. announced new drilling results from its ongoing 2025 exploration program at the Aburna Gold Project in Eritrea. Key intercepts include 21m at 1.20 g/t gold (including 5m at 3.32 g/t gold) in ABR179 and 8m at 1.19 g/t gold (including 5m at 1.73 g/t gold) in ABR178, which extended mineralization 60m to the southeast. The results confirm the project's scale and the shallow nature of gold mineralization, with 80% of the 7km trend remaining untested. QA/QC procedures are disclosed, and true widths are estimated to range between 70% and 90% of drilled intersections.

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Gold
Eritrea

Alpha Exploration Announces CEO Appointment, and Expanded Gold Prospect Targets with RAB Drilling Results

Alpha Exploration announced positive shallow RAB drilling results from its Aburna Gold project in Eritrea, identifying new gold-in-bedrock anomalies and expanding the known footprint. The program returned high-grade intercepts up to 9.76 g/t gold over 1 meter, indicating significant exploration potential. The company plans follow-up RC or core drilling to further define these targets.

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Eritrea

Alpha Exploration Commences Drilling at the Aburna Gold Prospect and Plans to Advance the Anagulu Copper-Gold Porphyry Prospect at Kerkasha, Eritrea

Alpha Exploration has commenced its 2025 drill program at the Kerkasha Project in Eritrea, including RAB, RC, and DD drilling. The program aims to expand the Aburna gold system and advance exploration at the Anagulu copper-gold porphyry and Tolegimja VMS prospects.

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Gold
Eritrea
Drill Results

Alpha Exploration Announces Additional New Drill Results from the Aburna Gold District, Kerkasha Project, Eritrea

Alpha Exploration has released new drill assay results from the Hill 52 and Central prospects of the Aburna gold project in Eritrea. The results confirm the macroscopic structural controls of gold mineralization within the Central Aburna Antiform (CAA).

View story
Alpha Exploration Ltd.
Alpha Exploration Ltd.
ALEX
Gold
Eritrea
Drill Results

Alpha Exploration Announces New Drill Results from the Aburna Gold District Including 29 Meters Averaging 2.89 g/t Gold at Hill 52 Prospect, and 8 Meters Averaging 3.77 g/t Gold at the Northeast Prospect

Alpha Exploration announced new drill results from its Aburna Gold District, highlighting intercepts of 29 meters averaging 2.89 g/t gold at the Hill 52 Prospect and 8 meters averaging 3.77 g/t gold at the Northeast Prospect. The drilling extended mineralization at the Northeast Prospect to over 650 meters of strike length and further defined the high-grade zone at Hill 52. These results follow a delay in assay processing due to equipment issues at a local independent sample preparation laboratory, which has now resumed full capacity.

View story