Karora Resources Drills 13.7% Ni over 2.6 metres, 12.0% Ni over 2.9 metres, and 15.4% Ni over 0.6 Metres Further Demonstrating the High-Grade Potential of the Open-Ended 50C Nickel Trough
Karora Resources reported high-grade nickel drill results from its 50C Nickel Trough at the Beta Hunt project in Western Australia, with intercepts including 13.7% Ni over 2.6 metres and 15.4% Ni over 0.6 metres. This infill drilling program is designed to upgrade and extend the existing Gamma Block nickel resource, which currently stands at 197kt at 3.0% Ni in M&I and 317kt at 2.7% Ni in Inferred categories. The company highlights the open-ended nature of the mineralization and the potential for further resource expansion, supported by robust QA/QC protocols.