Eloro Resources Ltd.
Drill Results
Eloro Resources Ltd. Intersects the Longest Zinc Interval to Date at its Iska Iska Project, Potosí Department, Bolivia with 456 Metres Grading 1.72% Zn including 190.5m grading 2.35% Zn in Hole DSB-88
Eloro Resources Ltd. announced significant drill results from its Iska Iska Project in Bolivia, including the longest zinc interval to date in hole DSB-88, grading 1.72% Zn over 456 metres. Step-out drilling in both DSB-88 and DSB-89 expanded the polymetallic mineralization, with results expected to contribute to resource expansion and an upcoming Preliminary Economic Assessment. The company confirmed standard QA/QC procedures and disclosed metal equivalent assumptions.