Mining News in Wisconsin

GreenLight Metals Inc.
GreenLight Metals Inc.
GRL.V
Wisconsin

GreenLight Metals Intersects Massive to Semi-Massive Sulfides in Step-Out Holes at the Bend Copper-Gold Project

GreenLight Metals reports drill results from its Bend Copper-Gold VMS Project in Wisconsin, highlighting a significant gold intercept in hole B26-012, including high-grade sub-intervals. Visual observations from step-out holes B26-015 and B26-016 indicate massive to semi-massive sulfides, with assays pending. The company also provides an update on permitting progress and discusses a historical resource estimate that is not considered current.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin
Drill Results

GreenLight Metals Intersects 52.18m of 1.12 g/t Au (1.28% CuEq) Including 10.82m of 2.49 g/t Au (2.75% CuEq) at the Bend VMS Deposit in Wisconsin

GreenLight Metals reported significant drill intercepts at the Bend VMS Project in Wisconsin, including 52.18m of 1.12 g/t Au (1.28% CuEq) in hole B26-009W. The results demonstrate down-dip extension of both gold-bearing footwall mineralization and copper-rich massive sulfides.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin
Drill Results

GreenLight Metals Intersects 27.72m of 1.07% Cu and 0.97 g/t Au (2.10% CuEq) including 15.65m of 1.66% Cu and 1.39 g/t Au (3.14% CuEq) at the Bend VMS Deposit in Wisconsin

GreenLight Metals has reported significant drill results from the Bend VMS Project in Wisconsin, including a 27.72m intercept of 1.07% Cu and 0.97 g/t Au in hole B26-008. The results confirm the extension of high-grade mineralization down-dip and along strike from previous exploration.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin
Drill Results

GreenLight Metals Intersects 30.7m of 1.05% Cu and 1.34 g/t Au (2.49% CuEq1) Including 14.9m of 1.95% Cu and 1.58 g/t Au (3.65% CuEq) at the Bend VMS Deposit in Wisconsin

GreenLight Metals has reported high-grade drill results from hole B26-007 at the Bend VMS Project in Wisconsin, intersecting 30.7m at 1.05% Cu and 1.34 g/t Au (2.49% CuEq). The intercept includes a high-grade 14.9m zone at 1.95% Cu and 1.58 g/t Au (3.65% CuEq), confirming the down-dip extension of mineralization.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin

GreenLight Metals Receives Regulatory Approvals and Commences Mobilization for Expanded Bend Drill Program

GreenLight Metals has received regulatory approvals from the Wisconsin DNR and USFS for exploration drilling at the Bend VMS Project. Mobilization of two drill rigs has commenced for an expanded program permitting up to 7,000 metres of drilling.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin

GreenLight Metals Reviews 2025 Achievements and 2026 Exploration Strategy

GreenLight Metals reported strong Phase 1 drill results from the Bend Project in Wisconsin, featuring high-grade copper-gold intercepts and significant tellurium values. The results confirm the continuity and strengthening of the mineralized system with depth, supporting the company's 2026 expansion strategy.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin
Drill Results

GreenLight Metals Intersects 23.98 meters of 1.19% Copper and 1.60 g/t Gold (2.86% Copper Equivalent) at the Bend VMS Deposit in Wisconsin

GreenLight Metals has reported high-grade copper and gold drill results from its Bend VMS project in Wisconsin. Hole B25-006 intersected up to 17.11m at 1.64% Cu and 1.61 g/t Au, confirming the strengthening of mineralization down-plunge.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin
Drill Results

GreenLight Metals Intersects 22.24 meters of 3.02 g/t Gold and 2.03% Copper (5.27% Copper Equivalent) at the Bend VMS Deposit in Wisconsin

GreenLight Metals has completed its Phase 1 drilling at the Bend VMS deposit in Wisconsin, reporting high-grade gold and copper intercepts. Notable results include 22.24m at 3.02 g/t Au and 2.03% Cu in hole B25-004, confirming that mineralization strengthens down-plunge.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin
Drill Results

GreenLight Metals Intersects Significant Copper-Rich VMS Mineralization at Bend Project in Wisconsin Including 12.85m of 4.15% Copper Equivalent

GreenLight Metals announced significant copper-rich VMS mineralization at its Bend Project in Wisconsin, with initial assay results from the first three holes of its Phase 1 drill program. Hole B25-003 intersected 12.85m grading 4.15% copper equivalent, including high-grade sub-intervals. The program successfully extended mineralization eastward and at depth, with visual observations in the remaining three holes suggesting continued success, though assays are pending.

View story
GreenLight Metals Inc.
GreenLight Metals Inc.
GRL
Wisconsin

Greenlight Metals Engages Taconite Drilling for Bend Drill Program and Files Notice of Intent to Drill with Wisconsin DNR

GreenLight Metals has engaged Taconite Drilling LLC for its upcoming Phase 1 exploration program at the Bend VMS Project in Wisconsin. The company has also filed a Notice of Intent to Drill with the Wisconsin DNR, with mobilization expected to begin June 16, 2025.

View story