Fireweed Intersects 43 m True Width Sub-Interval of 10.53% ZnEq in Tom South Step Out
Fireweed Metals reported a major step-out drill intersection at the Tom South deposit within the Macpass Project, hitting 64 m true width at 8.35% ZnEq. The hole (TS26-003) included high-grade sub-intervals of up to 12.85% ZnEq, demonstrating thickening of the mineralized zone.