Mining News in Minnesota

Green Bridge Metals Corporation
Green Bridge Metals Corporation
GRBM
Minnesota

Green Bridge Metals Intersects 195.0 Metres Grading 0.25% Cu and 10.18% TiO2 at Titac South, Minnesota; Step-Out Hole Confirms Mineralization at Previously Untested Geophysical Target

Green Bridge Metals has reported final assay results from its Phase 1 drill program at the Titac Project in Minnesota. A key highlight is the step-out hole TS26-007, which intersected copper and titanium mineralization at a previously untested geophysical target, validating the company's 3D VTEM inversion modelling.

View story
Green Bridge Metals Corporation
Green Bridge Metals Corporation
GRBM
Minnesota
Drill Results

Green Bridge Metals Intersects 195.0 Metres Grading 0.25% Cu and 10.18% TiO2 at Titac South, Minnesota; Step-Out Hole Confirms Mineralization at Previously Untested Geophysical Target

Green Bridge Metals reported final assay results from its Phase 1 diamond drill program at the Titac Project in Minnesota. Hole TS26-004a intersected a significant 195.0m grading 0.25% Cu and 10.18% TiO₂, confirming existing mineralization. An exploratory step-out hole, TS26-007, successfully intersected mineralization at a previously untested geophysical target, validating the company's 3D VTEM inversion modelling as an effective targeting tool.

View story
Talon Metals
Talon Metals
TLO
Minnesota

Talon scraps plan to build North Dakota mill for Tamarack

Talon Metals has abandoned plans to build a new mill in North Dakota, opting instead to process Tamarack ore at its existing Humboldt mill in Michigan to reduce capex. The announcement follows the reporting of a significant high-grade nickel-copper-cobalt sulphide intercept at the Tamarack project.

View story
Talon Metals
Talon Metals
TLO
Minnesota

Talon drops plan to build North Dakota mill for Tamarack

Talon Metals has abandoned plans to construct a new mill in North Dakota, opting instead to process Tamarack project ore at its existing Humboldt mill in Michigan to reduce capex. The announcement follows the reporting of a significant 753m sulphide intercept at the Tamarack nickel-copper-cobalt project.

View story
Talon Metals
Talon Metals
TLO
Minnesota
Drill Results

Talon Metals Shares Jump 30 Percent on Assay Results

Talon Metals reported record-breaking polymetallic assay results from its Tamarack project in Minnesota. Drill hole 25TK0562A returned high-grade nickel (13.37%) and copper (16.54%) over 46.43m, extending the Vault zone mineralization by 50m.

View story
Talon Metals Corp.
Talon Metals Corp.
TLO
Minnesota

Talon Metals chooses Humboldt Mill as processing location for Tamarack Project, Minnesota

Talon Metals has selected its existing Humboldt Mill in Michigan as the processing location for the Tamarack Project in Minnesota, abandoning plans for the Beulah Minerals Processing Facility in North Dakota. The decision leverages existing nickel-copper infrastructure and expertise acquired through the Eagle Mine acquisition. A feasibility study to evaluate process modifications at Humboldt is expected to conclude in Q4 2026.

View story
Green Bridge Metals
Green Bridge Metals
GRBM
Minnesota
Drill Results

Green Bridge Metals Intersects 195.0 Metres Grading 0.25% Cu and 10.18% TiO2 at Titac South, Minnesota; Step-Out Hole Confirms Mineralization at Previously Untested Geophysical Target

Green Bridge Metals has reported final assay results from its Phase 1 diamond drill program at the Titac Project in Minnesota. Drill hole TS26-004a intersected a significant 195.0 metre interval containing 0.25% Cu and 10.18% TiO2, confirming mineralization at a new step-out target.

View story
Talon Metals Corp.
Talon Metals Corp.
TLO
Minnesota
Drill Results

Talon Metals Reports Assays from Record 46.43-Meter Vault Zone Intercept at Tamarack

Talon Metals announced exceptional drill results from the Vault Zone at its Tamarack Project in central Minnesota, with drill hole 25TK0562A intersecting a record 46.43 meters grading 13.37% Ni, 16.54% Cu, and significant PGEs and gold. This high-grade polymetallic intercept, which includes a 26.22-meter sub-interval at even higher grades, extends known mineralization and supports the company's BHEM-guided exploration strategy. The results underscore the strategic importance of Tamarack as a potential domestic source of critical minerals.

View story
Electric Metals (USA) Limited
Electric Metals (USA) Limited
EML
Manganese
Minnesota

Electric Metals to Present at the Clean Energy & Metals Virtual Investor Conference on August 27th

Electric Metals (USA) Limited announced that CEO Brian Savage will present at the Clean Energy & Metals Virtual Investor Conference on August 27, 2026. The company highlighted key metrics for its North Star Manganese Project, including a NI 43-101 resource and Preliminary Economic Assessment results.

View story
Talon Metals Corp.
Talon Metals Corp.
TLO
Minnesota
Drill Results

Talon Metals Drills Record Vault Zone Intercept at Tamarack: 46.43 Meters of Massive and Mixed Massive Sulphide Mineralization

Talon Metals has reported a record 46.43-meter intercept of massive and mixed massive sulphide mineralization at the Tamarack Project in Minnesota. The intercept, found in drill hole 25TK0562A, represents a significant step-out and validation of the Vault Zone geological model, although assay results are still pending.

View story