Lead Mining News

Maronan Metals
Maronan Metals
MMA
Queensland

Maronan Metals keeps the silver-lead hits rolling in Queensland

Maronan Metals has reported strong silver-lead infill drill results at its Maronan project in Queensland. The drilling, part of a 40,000m program, includes high-grade intercepts and is intended to support a resource update in Q4 FY27 and a subsequent PFS in mid-2027.

View story
Cantex Mine Development Corp.
Cantex Mine Development Corp.
CD
Yukon
Metallurgical Results

Cantex Announces Outstanding Preliminary Flotation Results; Achieves Premium-Grade Lead and Zinc Concentrates with Strong Silver Credits at North Rackla

Cantex has announced successful preliminary flotation testwork at its North Rackla project in the Yukon. The tests produced premium-grade lead and zinc concentrates from high-grade, low-grade, and oxide composites, with significant silver credits reported in the lead concentrates.

View story
Leading Edge Materials Corp.
Leading Edge Materials Corp.
LEM
Romania
Drill Results

LEADING EDGE MATERIALS' PROGRESS UPDATE ON ROMANIAN EXPLORATION PROJECT

Leading Edge Materials announced progress from its 2025 exploration campaign in Romania, highlighting extensive polymetallic mineralization (lead, zinc, copper) identified through channel sampling in underground galleries. The results include multiple high-grade intercepts over significant widths, with some sub-intervals showing bonanza grades. The company emphasizes the potential for a large, interconnected mineralized system and confirms JORC-compliant reporting with comprehensive QA/QC procedures, though collar and downhole surveys are pending.

View story
Silver North Resources Ltd.
Silver North Resources Ltd.
SNAG
Yukon Territory

Silver North's Veronica Property Yields 76.8% Lead with Previously Reported 2,860 g/t Silver Discovery at Betty Target

Silver North Resources reported high-grade lead and silver assay results from surface float and outcrop samples at the Lodge and Cooper showings within the Betty Target anomaly. The most significant sample returned 76.8% lead and 2,860 g/t silver from a massive sulphide cobble.

View story
Cantex Mine Development Corp.
Cantex Mine Development Corp.
CD
Yukon, Canada
Drill Results

CANTEX DRILLS ANOTHER OUTSTANDING INTERSECTION OF 9 METRES OF 34.08% LEAD-ZINC AND 96 G/T SILVER AT ITS NORTH RACKLA PROJECT IN THE YUKON

Cantex Mine Development Corp. announced outstanding drill results from its 2024 program at the North Rackla Project in Yukon, Canada, highlighted by a 9-meter intercept of 34.08% lead-zinc and 96 g/t silver in hole YKDD24-315. The drilling successfully extended the Main Zone's strike length by 300 meters to 2.65 kilometers, with mineralization remaining open. The company also noted elevated copper values in the northeastern section and the strategic importance of germanium enrichment in the deposit.

View story
Cantex Mine Development Corp.
Cantex Mine Development Corp.
CD
Yukon
Drill Results

CANTEX CONTINUES TO INTERSECT WORLD-CLASS SILVER-LEAD-ZINC +/- GERMANIUM GRADES AND EXTENDS ITS STRIKE LENGTH BY 300 METRES AT ITS 100% OWNED NORTH RACKLA PROJECT, YUKON

Cantex Mine Development Corp. announced new drill results from its North Rackla Project in Yukon, extending the strike length of the Massive Sulphide Zone by 300 metres to 2.65 kilometres. Highlights include high-grade silver-lead-zinc intercepts, with one hole returning 2.4 metres of 25.82% combined lead-zinc within a broader 13.63-metre interval. The company is awaiting germanium results from these intervals.

View story
Vendetta Mining Corp.
Vendetta Mining Corp.
VTT
Queensland
Drill Results

Vendetta Reports High Grade Exploration Intersections in Zone 2 and 3 at the Pegmont Lead-Zinc Project, Queensland

Vendetta Mining Corp. reported high-grade lead-zinc exploration intercepts at the Pegmont Project in Queensland, specifically in Zones 2 and 3. While drilling at the nearby Killer Bore project was suspended due to the wet season, the Pegmont results show significant mineralization extension.

View story
Vendetta Mining Corp.
Vendetta Mining Corp.
VTT
Australia

Vendetta Announces Non-Brokered Private Placement and Corporate Updates

Vendetta Mining Corp. announced a non-brokered private placement of up to 16,000,000 shares for $800,000 to fund the Pegmont Lead-Zinc project. The release also provides a summary of the historical Pegmont Mineral Resource Estimate and updates on recent drilling activities.

View story
Vendetta Mining Corp.
Vendetta Mining Corp.
VTT
Queensland, Australia

Vendetta Commences Phase 1 Drilling Program at Its Pegmont Lead-Zinc Project

Vendetta Mining Corp. has commenced a Phase 1 drilling program at the Pegmont Lead-Zinc project in Queensland, Australia. The program targets underground extension, the Killer Bore Zinc prospect, and shallow open pit areas to improve resource confidence and test material types.

View story
Vendetta Mining Corp.
Vendetta Mining Corp.
VTT
Queensland, Australia

Vendetta Mining 2022 Drilling Program and Corporate Update

Vendetta Mining announced its 2022 drilling program for the Pegmont Lead-Zinc Project in Australia, which includes 8,000 metres of drilling and metallurgical testing. The company also confirmed the 15-year renewal of three mining leases and provided a summary of its existing mineral resource estimate.

View story